Skip to content
Fiscal Receipts

AN/SQQ-89 Surf ASW Combat System

NProcurementPartial Reconciliation2136
What it is
AN/SQQ-89 Surf ASW Combat System — a procurement program run by Navy.
What changed
No FY25→26 comparison — trajectory data incomplete for this line.
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$133.8M
FY25 Total
FY26 Request
$144.4M
FY25→26 Change

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
FY24: $133.8MFY26: $144.4MFY24FY26
FY24
$133.8M
FY26
$144.4M
Decade view — each figure cites its own President's Budget edition
FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY22FY23FY24FY25FY26
Actuals$126.9M$140.2M$133.8M
Enacted$140.2M$138.1M$134.6M
Request$138.1M$134.6M$144.4M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $138.1M for FY2024; the PB2026 book reports $133.8M actually spent — $4.26M below the request.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description AN/SQQ-89 Surf ASW Cmbt Sys

FY 2025 to FY 2026 Budget Increase ($+9.788M) Reflects the Net Effect of the Following: $-5.859M Decrease to AN/SQQ-89 Core Program Funding/Requirements in FY 2026 $+15.647M Realignment/Merge of OPN BLI 2176 USW Support Funding/Requirements Into OPN BLI 2136 Starting in FY 2026 Effective FY 2026, OPN Budget Line Item (BLI) 2136 absorbed all OPN BLI 2176 Undersea Warfare (USW) Support Equipment Aircraft Carrier Tactical Support Center (CV-TSC), Sonar Dome Rubber Window (SDRW), and Undersea Warfare Decision Support System (USW-DSS) funding/programs in support of the Program Element (PE)/BLI consolidation initiative prescribed within the 'DoD Implementation Plan from the Commission on Planning, Programming, Budgeting and Execution (PPBE) Reform Final Report', to facilitate the effort to rapidly increase Navy Lethality in the Submarine and Surface Fleet. OPN Budget Line Item (BLI) 2136 consists of four separate and distinct programs, the OPNAV N96 sponsored AN/SQQ-89 Surface Anti-Submarine Warfare (ASW) Combat System program, the OPNAV N98 sponsored Aircraft Carrier Tactical Support Center (CV-TSC) program, the OPNAV N96 sponsored Sonar Dome Rubber Window (SDRW) program, and the OPNAV N2N6 sponsored Undersea Warfare Decision Support System (USW-DSS) program. 1. AN/SQQ-89 Surface ASW Combat System (Cost Codes DB400/DB830/DB900/DB6IN): In support of the National Security Strategy (NSS), National Defense Strategy (NDS), and National Military Strategy (NMS), Anti-Submarine Warfare (ASW) remains a Navy core competency in a dynamic and uncertain maritime environment. U.S. adversaries continue to develop asymmetric capabilities and capacities to deter, disrupt, or delay the entry of U.S. and allied naval forces, and pose a constant challenge as the Maritime Strategy is implemented. Evolving submarine technologies offer enhanced stealth, speed, endurance, weapons, and operational proficiency, trends foretelling that the adversary submarine of the future will have a significantly larger sphere of influence, while presenting less vulnerability to ASW forces. The effective offensive engagement range of the adversary submarine of the future will continue to match or outrange individual U.S. and multinational platform sensors and weapons in many tactical environments. Submarines are an increasing threat to all Naval and Allied ships, particularly modern diesel and state-of-the-art nuclear submarines, and faster, more accurate torpedoes. Not only can the presence of potential hostile submarines delay naval combatant action until they are located and neutralized, submarines can also disrupt all seaborne logistics supply for any ground campaign as well as maritime commerce. ASW forces must be effective in all operating environments, ranging from the deep open ocean to the littorals, and are key to countering adversarial anti-access and area denial strategies. The AN/SQQ-89(V) Surface Ship ASW Combat System provides integrated Undersea Warfare (USW) combat management, fire control, command and control, and on-board training to enable surface combatants to engage USW targets in both open ocean and littoral environments. The AN/SQQ-89(V) is a system comprised of many subsystems, which integrate the helo and its sensors, the ship's own organic sensors, weapons, torpedo detection, and a high-fidelity Surface ASW Synthetic Trainer (SAST). Variants of the AN/SQQ-89(V) are currently in operation on in-service CG47 and DDG51 Class Surface Combatants. AN/SQQ-89A(V)15 Surface Ship ASW Combat System Upgrade: A major upgrade to the AN/SQQ-89(V) legacy system, the AN/SQQ-89A(V)15 significantly decreases ship vulnerability to torpedo attack, improves surface ship USW lethality, and mitigates Commercial-Off-The-Shelf (COTS) obsolescence and supportability issues. The need for the AN/SQQ-89A(V)15 is articulated in Operational Requirements Document (ORD) #667-76-05 titled 'AN/SQQ-89 Improvement Program'. The AN/SQQ-89A(V)15 upgrade is programmed for backfit on: Select CG47 Class Baseline 3 and 4 (CGs 59-73) ships budgeted under OPN BLI 0960 (Cruiser Modernization); DDG51 Class Flight I/II (DDGs 51-78) ships budgeted under OPN BLI 0900 (DDG Modernization) and OPN BLI 2136 (represented here); and DDG51 Class Flight IIA and onward via OPN BLI 2136 (for DDGs 79-132 represented here) and SCN BLI 2122 (DDG51 Class Forward Fit for DDGs 133 and follow). The AN/SQQ-89A(V)15 upgrade, developed under the RDT&EN Program Element (PE) 0205620N Project 1916 Surface ASW System Improvement program, capitalizes on previously fielded AN/SQQ-89(V) systems. The AN/SQQ-89A(V)15 is comprised of a tactical towed array sensor, the Multi-Function Towed Array (MFTA), and replaces standard, militarized, legacy components with Commercial-Off-The-Shelf (COTS) hardware. The AN/SQQ-89A(V)15 features hull/towed Sonar Echo Tracker Classifier (ETC); hull/towed Sonar with Acoustic Intercept (ACI) fused data for significantly improved torpedo defense; Handling & Stowage Group (H&SG) for MFTA operation; Torpedo Setting Panel (TSP); passive towed array processing; common sub/surface sensor performance and prediction; common NAVAIR/Surface Light Airborne Multi-Purpose System (LAMPS) processing; portable software; integrated supportability; and on-board training via the Surface ASW Synthetic Trainer (SAST). The AN/SQQ-89A(V)15 is interoperable with AEGIS Weapons System (AWS) baselines; is Open Architecture (OA) compliant (meeting OA Level 3 requirements); provides significant reductions in weight, space, cooling, and power requirements over legacy AN/SQQ-89(V) systems; is Grade A shock qualified; supports Digital Fire Control Integration (DFCI) capability; and is integrated with the Battle Force Tactical Trainer (BFTT). AN/SQQ-89A(V)15 Technology Insertion/Refresh and Technology Insertion/Refresh Build-In-Place: To be effective against increasingly stealthy threats in an ambiguous undersea environment, future sensors must be environmentally adaptive, have very low false alarm rates, and exploit the full range of current and future submarine detection vulnerabilities. Via the Advanced Capability Build (ACB) process under RDT&EN PE 0205620N Project 1916, these types of maturing/proven USW technologies will be folded into the AN/SQQ-89A(V)15 production and future technology insertion/refresh and build-in place backfit programs. Leveraging the submarine community's Acoustic Rapid Commercial-off-the-Shelf (COTS) Insertion (ARCI) process, the AN/SQQ-89A(V)15 Technology Insertion/Refresh program procures upgraded software/hardware technology for all DDG51 Class surface combatant platforms with a previously fielded AN/SQQ-89A(V)15. This process has proven to manage obsolescence, take advantage of commercial development efforts, and continue to pace the threat to ensure systems remain effective well into the 21st century. Additionally, studies of the submarine and surface ASW technology show that system upgrades are most critical five to nine (5 to 9) years after each AN/SQQ-89A(V)15 installation, as failure rates within this period begin to rise. Establishing a stable technology refresh program ensures the Fleet maintains critical Undersea Warfare capability (threat-pacing improvements) and productivity (Increased Operational Availability (Ao)) while reducing the Total Ownership Cost (TOC) to the Navy. AN/SQQ-89A(V)15 YEAR-TO-YEAR FUNDING PROFILE FROM PROCUREMENT TO INSTALL: 1st Budget Year - Procurement of equipment. 2nd Budget Year - Ordering of incidental installation material and performance of mandatory advance planning yard design tasks and ship checks, which are required to be budgeted in the year *prior* to the physical installation of equipment. These installation costs are depicted in the P-3a exhibit with a quantity of "0". 3rd Budget Year - Installation of equipment. An average, aggregate AN/SQQ-89A(V)15 shipset unit cost is comprised of multiple contract/funding vehicles. Additionally, these unit costs can vary as they are dependent on the pre-existing legacy AN/SQQ-89(V) configuration of each ship. 2. Aircraft Carrier Tactical Support Center (CV-TSC) (Cost Code DB301): In support of the National Security Strategy (NSS), National Defense Strategy (NDS), and National Military Strategy (NMS), the AN/SQQ-34 Aircraft Carrier Tactical Support Center (CV-TSC) program delivers Anti-Submarine Warfare (ASW) and Surface Warfare (SUW) combat capability to the Aircraft Carrier supporting Aircraft Carrier, Nuclear power (CVN) Tactical Action Office (TAO) and embarked Carrier Strike Group (CSG) Sea Combat Commander. The program provides validation and certification of Engineering Changes (ECs) fielded on CVNs and provides hardware/software changes/upgrades developed under CV-TSC RDT&EN Program Element (PE) 0603512N Project 3216 to previously fielded and in-production CV-TSC systems required to correct deficiencies identified through Fleet use, upgrade unreliable/unsupportable components, replace obsolete components, and resolve Information Assurance (IA) issues. The program maintains interoperability with current and future interfaces to stay within the current performance envelope, supports mission data exchange, improves ASW/SUW track/sensor processing and analysis techniques, improves mission planning, improves data recording, reconstruction, and distribution, improves embedded simulation and training capabilities and implements cyber-security measures to effectively employ overall CVN Self Ship Defense System (SSDS) capabilities. CV-TSC integrates sensor data from organic Aircraft (MH-60R), organic platform sensors and tracks via Ship Self Defense System Product Line Architecture (PLA) and non-PLA, Link-16 track data, Global Command and Control System (GCCS) Over-the-Horizon track data, and Environmental and Threat Databases to assess the threat and assist the Tactical Action Officer and Carrier Strike Group to effectively employ overall CVN self-defense capabilities. CV-TSC generates real-time ASW/SUW information and recommendations, tactical planning and employment of ASW/SUW assets, ASW/SUW sensor data processing and analysis, and distribution of tactically significant data. Aircraft supported include: MH-60R/S Seahawk, P-8 Poseidon, MQ-4C Triton, and future ASW/SUW non-organic supporting platforms. 3. Sonar Dome Rubber Window (SDRW) (Cost Code DB401): In support of the National Security Strategy (NSS), National Defense Strategy (NDS), and National Military Strategy (NMS), AN/SQS-53 Sonar Dome Rubber Windows (SDRWs) are installed on all CG47 and DDG51 class ships (Initial Capabilities Document (ICD) for ASW, AN/SQQ-89(V) Operational Requirements Document (ORD) (#667-76-05 dated August 2005). This program provides emergency replacement, wire-reinforced, pressurized rubber acoustic windows and attachment hardware, which experience failure due to corrosion, fatigue, and impact damage. Ships with a severely damaged SDRW need to be dry-docked, so continually monitoring status of SDRWs and maintaining a ready inventory of replacement assets is a priority in order to keep ships on mission. The SDRW significantly improves the surface ship sonar performance by reducing flow-induced self-noise and by providing increased source level receiving and sensitivity resulting from reduced attenuation. This program provides production engineering in support of technical evaluations, failure analysis, implementation of the in-water one-side backscatter X-ray program, Government Furnished Equipment (GFE) refurbishments of production systems and field service engineering; and completion of engineering design work and material tests. This program also provides drawings, configuration management information, incorporation of new design and fabrication technology, incorporation of lessons learned and required testing, and constructs sub-elements to confirm single-stage cure of the SDRW production process. 4. Undersea Warfare Decision Support System (USW-DSS) (Cost Code DB601): In support of the National Security Strategy (NSS), National Defense Strategy (NDS), and National Military Strategy (NMS), USW-DSS is the Navy Program of Record ASW Command and Control (C2) Net-Centric system supporting the warfighter. USW-DSS provides an integrated, near-real time, net-centric ASW Common Tactical Picture (CTP) and Common Operational Picture (COP) for the Carrier Strike Groups (CSGs). USW-DSS is a C2 capability identified in the ASW Initial Capabilities Document (ICD), for the Sea Combat Commander (SCC) and Theater USW Commander (TUSWC). USW-DSS enables effective planning and execution of Undersea Warfare (USW) operations, optimizes placement of sensors for exploitation of the environment, manages available resources, balances operations versus risk, and provides a clear vulnerability assessment of the operational environment. USW-DSS shortens C2 decision processes for detection-to-engagement across multiple platforms, including those with low bandwidth communications or intermittent connectivity. Tactical data such as tracks, environmental, and sensor processing data is ingested into USW-DSS through platform specific interfaces such as the AN/SQQ-89(V) Surface Ship ASW Combat System, the Global Command and Control System - Maritime (GCCS-M), and Aircraft Carrier Tactical Support Center (CV-TSC). USW-DSS processes this and other tactical data and supports intelligent dissemination of the data to unit level and theater level platforms in support of an enhanced USW tactical picture. USW-DSS provides USW Commanders with an expanded, net-centric USW collaborative capability across CSG platforms (CVNs, CGs, DDGs) as well as supporting shore nodes to include: Theater Undersea Warfare Command Headquarters (TUSWCHQ), the Naval Oceanographic Processing Facility (NOPF), and Tactical Operations Center (TOC) and Mobile Tactical Operations Center (M-TOC). On afloat platforms, USW-DSS processing software is virtualized for portability and is hosted on the Integrated Shipboard Network System (ISNS) and Consolidated Afloat Networks and Enterprise Services (CANES) systems and implements a Service-Oriented Architecture (SOA) with display generation and operator interfaces provided via USW-DSS hardware. For support and ashore nodes, USW-DSS processing software is hosted on Commercial Off The Shelf (COTS) hardware. USW-DSS capability improvements are phased to deliver timely and cost-effective software improvements to the warfighter via the Build / Fleet Capability Release (FCR) process funded under the USW-DSS RDT&EN Program Element (PE) 0604518N Project 3094 development program, for transition and fielding via the USW-DSS OPN BLI 2136 program. USW-DSS procurements are installed on CSG platforms and supporting shore nodes via permanent Ship Alterations (SHIPALTs). Workstation procurements are required to support ISNS and CANES configured ships as well as shore nodes. See the following for a description of all P-40a and P-3a cost items that comprise this budget: [P40A / DB400 - DDG51 CLASS SYSTEM COMPONENTS - SQQ-89A(V)15]: DB400 Cost Elements/Descriptions as Follows: [P40A / AN/SQQ-89 System Updates (Non Recurring Engineering)]: Item Number 1.1 - Consists of the NRE efforts associated with the technology refresh/replacement of legacy AN/SQQ-89(V) equipment with updated Commercial-Off-The-Shelf (COTS) processors, including material procurement, fabrication, and integration of Government Furnished Property (GFP), as performed by the prime contractor. Hardware reviews will be conducted on an annual basis to determine if hardware changes are warranted based on Commercial-Off-The-Shelf (COTS) obsolescence and to identify applicable state-of-the-practice hardware components. This line also includes start-up/transition funding required for the AN/SQQ-89(V) prime in the first year of each new production/design agent contract. [P40A / AN/SQQ-89 Engineering Changes (ECs)]: Item Number 1.2 - Consists of Engineering Change Proposals (ECPs) and hardware/software changes/upgrades to previously fielded and in-production AN/SQQ-89A(V)15 systems. Funding will be used to support non-recurring first article test efforts associated with the changing Commercial-Off-The-Shelf (COTS) environment as well as Reliability, Maintainability, and Availability (RM&A) modifications requested by the Fleet; correct deficiencies identified through Fleet use; upgrade unreliable components; replace obsolete components; and correct design errors found during testing. Additionally, this line includes funding to productize and backfit a cyber mitigation to the software for the Technical Insertion/Advanced Capability Build (TI/ACB) configurations of the AN/SQQ-89A(V)15 Surface Ship ASW Combat System. Other high priority Fleet Incident Reports (IRs) will be addressed in conjunction with these cyber upgrades, as they arise. These upgrades proactively increase the level of complexity for an adversary to develop and employ cyber exploits against AN/SQQ-89 TI/ACBs with this capability (rather than reactively patching software after a cyber threat is detected). [P40A / AN/SQQ-89 Integrated Logistics Support (ILS)]: Item Number 1.3 - Funding is provided for all ILS planning and coordination elements associated with every AN/SQQ-89A(V)15 modification/procurement/installation, including: configuration management and control of the hardware and software associated with each modification such as Maintenance and Material Management (3M); planned and corrective maintenance procedures and drawings; supporting the procurement of upgrades to Technical Training Equipment (TTE) for shore training sites; changes to maintenance concepts and associated updates to technical documentation, such as technical manuals; development of revisions to both operator and maintenance training materials as part of the initial training curriculum development; revisions to the Navy Training System Plan; initial conduct of instructor training (train-the-trainer) until such time that the training community assumes the responsibility; modifications to supply support related provisioning data and identification of related changes to Allowance Parts Lists (APLs) and Program Support Data (PSD) spares procurement lists; and Packaging, Handling, Storage and Transportation (PHST) support during the procurement, Installation and Checkout (INCO), and testing stages of the AN/SQQ-89A(V)15 to meet evolving capabilities. [P40A / AN/SQQ-89 AEGIS Integration Events (AIE)]: Item Number 1.4 - Recurring engineering support services associated with AN/SQQ-89A(V)15 Surface Ship ASW Combat System equipment at the Surface Combatant Systems Center (SCSC) Wallops Island, VA test facility to support land-based testing, external interface testing, and AEGIS Integration Event (AIE) production systems testing for interoperability risk reduction analysis purposes as necessary to certify that each incremental AN/SQQ-89A(V)15 hardware/software build is compatible with multiple AEGIS Weapons System (AWS) baselines prior to installation. [P40A / AN/SQQ-89 Combat Systems Ship Qualification Trials (CSSQTs)]: Item Number 1.5 - CSSQTs are required per Naval Sea Systems Instruction 90963.1C for all ships undergoing significant conversion/modernization availabilities. CSSQTs consist of a series of at-sea exercises and tests to verify/certify the AN/SQQ-89A(V)15 or AN/SQQ-89A(V)15 Technology Refresh/Build-In-Place system has been installed properly and can be operated and maintained safely and effectively. CSSQTs follow every AN/SQQ-89A(V)15 DDG51-78 FLT I/II and DDG79-112 FLT IIA first-of-its-kind or AN/SQQ-89A(V)15 Technology Refresh/Build-In-Place installation. CSSQT costs are dependent on the number, scope, and complexity of CSSQTs planned per Fiscal Year. CSSQTs planned for AN/SQQ-89A(V)15 DDG51-78 FLT I/II and DDG79-112 FLT IIA systems are higher in cost, scope and complexity than those for AN/SQQ-89A(V)15 Technology Refresh/Build-In-Place systems. FY 2026 costs are broken down as follows: - In FY 2026 ($12.806M in total), thirteen CSSQTs are planned to follow AN/SQQ-89A(V)15 Technology Refresh installs at $0.9851M per CSSQT = $12.806M. [P40A / AN/SQQ-89 Follow-On Operational Test & Evaluation (FOT&E)]: Item Number 1.6 - Represents the final independent test of each new increment of the AN/SQQ-89A(V)15 Advanced Capability Build (ACB) production baseline. Follow-On Operational Test & Evaluation (FOT&E) events are conducted to ensure each new increment meets the operational effectiveness and suitability requirements for each new incremental AN/SQQ-89A(V)15 ACB production baseline, as well as its readiness and performance goals. FOT&E costs are primarily biennial driven and dependent on the scope and complexity of the next new AN/SQQ-89A(V)15 ACB production baseline release being tested. FY 2026 costs are broken down as follows: - In FY 2026, there is no requirement to conduct an FOT&E event on the next new AN/SQQ-89A(V)15 ACB production baseline release. [P40A / AN/SQQ-89 Fleet ASW Training Center (FLTASWTRACEN)]: Item Number 1.7 - Upgrade and virtualization of AN/SQQ-89A(V)15 training equipment for the Fleet ASW Training Center, San Diego, CA. Training system improvements are a critical factor in achieving warfighter competencies and mission readiness. Equipment must be upgraded periodically to ensure continued support of the latest backfit Advanced Capability Build (ACB) and AEGIS Weapon System (AWS) baselines and to implement Fleet prioritized warfighting training improvements to meet evolving capabilities. FLTASWTRACEN costs are primarily biennial driven and are dependent on the scope and complexity of training equipment to be upgraded. FY 2026 costs are broken down as follows: - In FY 2026, funding ($1.117M) is required to upgrade the equipment at the Fleet ASW Training Center. [P40A / AN/SQQ-89 Surface Ship Engineering Site (SSES)]: Item Number 1.8 - Procurement of AN/SQQ-89A(V)15 equipment for land-based sites, including the SSES at the AN/SQQ-89(V) prime vendor's facility, to support production system integration and interoperability testing. Equipment includes simulation hardware, test tools, fabrication and test of mod kits (hardware and operational software), and laboratory equipment. Equipment must be upgraded periodically to ensure continued support of the latest backfit AN/SQQ-89A(V)15 Advanced Capability Build (ACB) and AEGIS Weapon System (AWS) production baselines. SSES costs are primarily biennial driven, and dependent on the scope and complexity of shore site equipment production to be upgraded. FY 2026 costs are broken down as follows: - In FY 2026, funding ($1.373M) is required to upgrade the equipment at the SSES land-based site. [P40A / AN/SQQ-89 Surface Combatant Systems Center (SCSC)]: Item Number 1.9 - Procurement of AN/SQQ-89A(V)15 equipment for land-based sites including the Surface Combatant Systems Center (SCSC) at Wallops Island, VA, to support production system integration and interoperability testing. Equipment includes simulation hardware, test tools, fabrication and test of mod kits (hardware and operational software), and laboratory equipment. Equipment must be upgraded periodically to ensure continued support of the latest backfit Advanced Capability Build (ACB) and AEGIS Weapon System (AWS) productions baselines. SCSC Wallops costs are primarily biennial driven and dependent on the scope and complexity of shore site equipment to be upgraded. FY 2026 costs are broken down as follows: - In FY 2026, there is no requirement to upgrade the equipment at the SCSC Wallops Island land-based site. [P40A / AN/SQQ-89 Multi-Function Towed Array (MFTA) Major Equipment]: Item Number 1.10 - Procurement of Multi-Function Towed Array (MFTA) full module sets required for expeditious replacement in the event of major damage (the MFTA is considered a principal item). The MFTA is a key component of the AN/SQQ-89A(V)15 USW Combat System upgrade and enables ships to have active bi-statics, Continuous Active Sonar (CAS), adaptive beamforming, passive bellringers, and the use of new sensors for advanced torpedo detection. [P40A / DB830 - PRODUCTION ENGINEERING - SQQ-89A(V)15]: DB830 Cost Element/Description as Follows: [P40A / AN/SQQ-89 Production Engineering]: Item Number 2.1 - Funding is for AN/SQQ-89A(V)15 program In-Service Engineering Agent (ISEA), Software Support Activity (SSA), Acquisition Engineering Agent (AEA), and Technical Design Agent (TDA) efforts in performing the following functions: writing of contracts; review and evaluation of production design data, documentation and Contract Data Requirements Lists (CDRLs); letting of production contract awards; on-site engineering support at the prime integrator's facility; production configuration control and quality assurance (Production Inspection Test (PIT) and Production Reliability Acceptance Test (PRAT)); witnessing of segment/system integration tests and preparation of reports; conduct of first article and factory acceptance tests; collection of performance metrics; generation/assessment of Software Problem Reports (SPRs) and coordination with vendors; value and maintenance engineering; coordination with AEGIS regarding interface definition and ship integration; support safety review and AEGIS Integration Events (AIE); provide plans, procedures and inputs to support Information Assurance (IA) mandates; provide status reports and technical briefings; support meetings with program office; and all other production support efforts directly related to delivery of AN/SQQ-89A(V)15 software and hardware. [P40A / DB900 - CONSULTING SERVICES - SQQ-89A(V)15]: DB900 Cost Element/Description as Follows: [P40A / AN/SQQ-89 Consulting Services]: Item Number 3.1 - Funding to provide assistance in the following areas: program and financial management; system specification validation; production planning; business case and market analyses; vendor cost, schedule, performance, production, and contract deliverable monitoring; installation planning and coordination; Integrated Logistics Support (ILS) asset management, planning, documentation, and coordination; and evaluation of Engineering Change Proposals (ECPs). [P40A / DB301 - AIRCRAFT CARRIER TACTICAL SUPPORT CENTER (CV-TSC)]: DB301 Cost Element/Description as Follows: [P40A / CV-TSC Technology Insert/ Refresh & ECP Implementation]: Item Number 4.1 - Consists of Engineering Change Proposals (ECPs) and hardware/software changes/upgrades to previously fielded and in-production CV-TSC AN/SQQ-34 systems. Funding used to implement ECPs to correct deficiencies identified through Fleet use; upgrade unreliable components; replace obsolete components; and address Information Assurance (IA) issues. [P40A / DB401 - SONAR DOME RUBBER WINDOW (SDRW)]: DB401 Cost Element/Description as Follows: [P40A / SDRW Procurement]: Item Number 5.1 - Procure SDRWs, shipping fixtures, and fairing angles for emergency replacement on all CG47 and DDG51 class hulls. This line provides emergency replacement, wire-reinforced, pressurized rubber acoustic windows and attachment hardware, which experience failure due to corrosion, fatigue, and impact damage. Ships with a severely damaged SDRW need to be dry-docked, so continually monitoring status of SDRWs and maintaining a ready inventory of replacement assets is a priority in order to keep ships on mission. [P40A / SDRW Production Support]: Item Number 5.2 - Funding is provided for production engineering in support of technical evaluations, failure analysis, implementation of the in-water one-side backscatter X-ray program, Government Furnished Equipment (GFE) refurbishments, and field service engineering; and complete engineering design work and material tests. This program also provides drawings, configuration management information, new design and fabrication technology, incorporation of lessons learned and required testing, and construct sub-elements to confirm single-stage cure. [P40A / DB601 - UNDERSEA WARFARE DECISION SUPPORT SYSTEM (USW-DSS)]: DB601 Cost Element/Description as Follows: [P40A / USW-DSS Shore Sites and Tactical Trainers]: Item Number 6.1 - Reflects the procurement of USW-DSS Build 2 technical training environments and Build 3 shore systems to include theater, maritime operations centers, tactical operations centers, and training centers, hosted via general services secret and top-secret networks. Systems consist of the necessary computational hardware, servers, network architecture, software, user licenses and workstations to support from 2-10 simultaneous users. [P40A / USW-DSS Tech Refresh]: Item Number 6.2 - Tech Refreshes are defined as hardware and software upgrades to existing USW-DSS systems and include upgrades to both legacy USW-DSS Build 2 Revision 3 (B2R3) afloat systems and Build 3 ashore systems. Starting in FY 2025, this line will include Tech Refreshes for Build 3 afloat systems. Through USW-DSS Tech Refreshes, targeted architecture improvements developed under USW-DSS RDT&EN Program Element 0604518N Project 3094 via Build 3 Fleet Capability Release (FCR) will facilitate the migration of key components of USW-DSS onto existing installed systems for Fleet use. USW-DSS Tech Refreshes will include the latest cybersecurity patches, mitigate/resolve obsolescence issues, and improve software scalability, while installing the latest integrated, near-real time, netcentric ASW Common Tactical Picture (CTP) and Common Operational Picture (COP) on an electronic Master Tactical Plot (eMTP). Each year, USW-DSS is required to perform Tech Refreshes for afloat B2R3 systems to stay compatible with the Consolidated Afloat Network and Enterprise Services (CANES) hosting environment when CANES undergoes system upgrades to prevent loss of functionality. Each year, USW-DSS Build 3 ashore systems at Theater USW Command Headquarters (TUSWCHQ) sites are updated to provide additional capability, bug fixes, and cybersecurity upgrades. USW-DSS Build 3 afloat systems will also receive additional capability, bug fixes, and cybersecurity updates biennially. [P40A / USW-DSS Engineering Changes (ECs)]: Item Number 6.3 - Consists of Engineering Change Proposals (ECPs) and hardware/software changes/upgrades. Funding will be used to support Reliability, Maintainability, and Availability (RM&A) modifications, correct deficiencies identified through Fleet use, and upgrade of unreliable components. [P40A / USW-DSS System Technical Support]: Item Number 6.4 - Funding is for USW-DSS program Software Support Activity (SSA) efforts in performing the following functions: generation/assessment of Software Problem Reports (SPRs)/Software Trouble Reports (STRs); responding to Fleet software change requests; Configuration Management (CM); software Quality Assurance (QA); software installation automation; and software recovery support. [P40A / USW-DSS Production Support]: Item Number 6.5 - Consists of on-site engineering support; Consolidated Afloat Network and Enterprise Services (CANES) Integrated Product Team (IPT) Support; Information Assurance (IA) certification support; production quality assurance; system sustainability support; Integrated Logistics Support (ILS) product updates/support; status reporting and technical briefings; program office support; and all other production support efforts directly related to delivery of USW-DSS to both the Integrated Shipboard Network System (ISNS) and CANES systems, and ultimately to the Fleet. [P40A / USW-DSS Theater ASW (TASW) Build Out]: Item Number 6.6 - Consists of the initial fielding, commencing in FY 2024 under OPN BLI 2176, of the latest USW-DSS Build 3 baseline loaded on Consolidated Afloat Network and Enterprise Services (CANES) equipped ships that did not have USW-DSS previously installed. Hosting USW-DSS Build 3 on the CANES shipboard network reduces hardware costs while improving system sustainment. This line also reflects the additional requirement, also commencing in FY 2024, to upgrade legacy USW-DSS Build 2 Revision 3 (B2R3) systems to the Build 3 baseline. The USW-DSS Build 3 system is more complex and incorporates additional tactical data links than the legacy B2R3 baseline. Build 3 data is shared at the general services Secret and Top-Secret level, creating additional complexity. This expanded list of tactical data allows for better communication and expanded data fusion for ship-to-ship, ship-to-shore, shore-to-shore, and shore-to-aircraft information sharing. These added tactical data links require additional effort to establish and validate during system delivery. NOTE: The FY 2025 (Qty 4 shown under OPN BLI 2176) to FY 2026 (Qty 21 shown under OPN BLI 2136) increase in the number of TASW Build Out units procured reflects the ramp-up of USW-DSS Build 3 baseline systems required to be delivered to afloat CVNs, DDGs, and FFGs in FY 2026. USW-DSS is a tool for ship-to-ship and ship-to-shore collaborative Theater ASW and benefits from having multiple ships in a strike group with the same capability. The quantity ramp-up in FY 2026 reflects the desire to build the critical mass of USW-DSS Build 3 equipped ships to support collaborative Theater ASW ahead of the Davidson Window in FY 2027. Additionally, USW-DSS Build 3 requires an upgraded CANES configuration baseline (Hardware 3 / Software 5) and a more modern version of Agile Core Services. In FY 2026, the availability of upgraded CANES configuration baselines to support the hosting of USW-DSS Build 3 are more widespread, leading to an increase in planned quantities. [P3A / AN/SQQ-89A(V)15 - DDG79-112 FLT IIA UPGRADE]: See the following: AN/SQQ-89A(V)15 - DDG79-112 FLT IIA UPGRADE - COST CODE DB400 PROCUREMENT: Procurement of AN/SQQ-89A(V)15 equipment for subsequent backfit installation on all DDG79-112 Flight IIA ships. An average, aggregate AN/SQQ-89A(V)15 unit cost is indicated, however, it should be noted that this cost is comprised of multiple contract/funding vehicles. Additionally, the subdivision of these unit costs to a specific ship can vary as they are dependent on the pre-existing configuration of each ship. AN/SQQ-89A(V)15 - DDG79-112 FLT IIA UPGRADE - COST CODE DB6IN INSTALLATION: Funding is for the full-up physical installation of the major AN/SQQ-89A(V)15 upgrade, the ordering of incidental installation material in the year prior to the actual installation, and Design Services Allocation (DSA) required for mandatory planning yard design tasks and ship checks that must be completed within the one year period leading up to the actual installation in the shipyard. [P3A / AN/SQQ-89A(V)15 - DDG51-78 (SELECT) FLT I/II UPGRADE]: See the following: AN/SQQ-89A(V)15 - DDG51-78 (SELECT) FLT I/II UPGRADE - COST CODE DB400 PROCUREMENT: Procurement of AN/SQQ-89A(V)15 equipment for subsequent backfit installation on select DDG51-78 FLT I/II ships. An average, aggregate AN/SQQ-89A(V)15 unit cost is indicated, however, it should be noted that this cost is comprised of multiple contract/funding vehicles. Additionally, the subdivision of these unit costs to a specific ship can vary as they are dependent on the pre-existing configuration of each ship. AN/SQQ-89A(V)15 - DDG51-78 (SELECT) FLT I/II UPGRADE - COST CODE DB6IN INSTALLATION: Funding is for the full-up physical installation of the major AN/SQQ-89A(V)15 upgrade, the ordering of incidental installation material in the year prior to the actual installation, and Design Services Allocation (DSA) required for mandatory planning yard design tasks and ship checks that must be completed within the one year period leading up to the actual installation in the shipyard. [P3A - 3 / AN/SQQ-89A(V)15 - DDG113-132 MFTA/HANDLER UPGRADE]: See the following: AN/SQQ-89A(V)15 - DDG113 AND FOLLOW MFTA/HANDLER UPGRADE - COST CODE DB400 PROCUREMENT: Procurement of a subset of AN/SQQ-89A(V)15 equipment, specifically the Multi-Function Towed Array (MFTA) and OK-410 Handling & Stowage Group (H&SG), for subsequent installation on all DDG113-132 ships during their Post Delivery Availability (PDA) or Post Shakedown Availability (PSA) periods, to upgrade the ASW sonar suite from an AN/SQQ-89(V)15 configuration to the AN/SQQ-89A(V)15 configuration. AN/SQQ-89A(V)15 - DDG113 AND FOLLOW MFTA/HANDLER UPGRADE - COST CODE DB6IN INSTALLATION: Physical installation of the MFTA and OK-410 H&SG on DDG113-132 ships during their PDA or PSA period which includes the installation of an egress, under-deck stiffeners, cables, bulkheads, opening and closing of the transom, the winch, levelwind, fairlead and control station, decking, painting, and final system testing, the ordering of incidental installation material in the year prior to the actual installation, and Design Services Allocation (DSA) required for mandatory planning yard design tasks and ship checks that must be completed within the one year period leading up to the actual installation in the shipyard. [P3A - 4 / AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH]: See the following: AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH - COST CODE DB400 PROCUREMENT: Leveraging the submarine community's Acoustic Rapid Commercial-off-the-Shelf (COTS) Insertion (ARCI) process, the AN/SQQ-89A(V)15 Technology Insertion/Refresh program procures upgraded software/hardware technology for all DDG51 Class surface combatant platforms with a previously fielded AN/SQQ-89A(V)15 with a Technical Insertion-12 (TI-12+) production baseline configuration or lower (TI-09 through TI-12+). These technology insertion/refreshes have proven to minimize COTS obsolescence issues, take advantage of commercial development efforts, and continue to pace the threat to ensure AN/SQQ-89A(V)15 Surface Anti-Submarine Warfare Combat Systems remain effective well into the 21st century. Studies of the submarine and surface ASW technology have shown that system technology refreshes are most critical 5-9 years after installation of the latest fielded version of the AN/SQQ-89A(V)15, as failure rates within this period begin to rise. Establishing a stable technology refresh program will ensure the Fleet maintains critical ASW and Undersea Warfare capability (threat-pacing improvements) and productivity (Increased Operational Availability (Ao)) while reducing the Total Ownership Cost (TOC) to the Navy. Shipset procurement costs reflect the addition/inclusion of Hypervisor Technology 0 (HT0) and Infrastructure as a Service (IaaS) technology advancement hardware/software. HT0 allows for the employment of virtual software, creating a separation between hardware and software to make both agnostic to one another, which serve to simplify future upgrades. HT0 also supports the transition to IaaS which builds on the virtualization of software by utilizing a common infrastructure. Unlike the Build-In-Place (BIP) technology refresh planned for AN/SQQ-89A(V)15 TI-14 and follow production baselines, the TI-12+ and prior production baselines will also require the procurement of new equipment racks to host the HT0 and IaaS technology advancements. AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH - COST CODE DB6IN INSTALLATION: Funding is for the physical installation of the AN/SQQ-89A(V)15 Technology Insertion/Refresh upgrade, and the ordering of incidental installation material and the Design Services Allocation (DSA) efforts required for mandatory planning yard design tasks and ship checks that must be completed within the one year period leading up to the actual installation in the shipyard. NOTE: Increases to physical installation costs shown in FY 2026 and follow factor in adjustments made to reflect the following cost drivers: The transition of hot work (i.e. welding) from Alteration Installation Teams (AITs) to shipyards; an increased reliance on AIT subject matter expertise to address shipyard installation deficiencies and schedule impacts via Condition Found Reports (CFRs); increased effort required to resolve System Installation Drawings (SID) deficiencies; fact-of-life increases associated with the prioritization of modernizations to be completed on outside-CONUS Forward-Deployed Naval Forces (FDNF) hulls (increased travel costs), HAZMAT disposition, and increased personnel requirements to accommodate shorter installation availability durations. [P3A - 5 / AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH - BUILD-IN-PLACE]: See the following: AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH - BUILD-IN-PLACE - COST CODE DB400 PROCUREMENT: Leveraging the submarine community's Acoustic Rapid Commercial-off-the-Shelf (COTS) Insertion (ARCI) process, the AN/SQQ-89A(V)15 Technology Insertion/Refresh - Build-In-Place program procures upgraded software/hardware technology for all DDG51 Class surface combatant platforms with a previously fielded AN/SQQ-89A(V)15 with a Technology Insertion-14 (TI-14) production baseline configuration or higher. These technology insertion/refreshes have proven to minimize COTS obsolescence issues, take advantage of commercial development efforts, and continue to pace the threat to ensure AN/SQQ-89A(V)15 Surface Ship ASW Combat Systems remain effective well into the 21st century. Studies of the submarine and surface ASW technology have shown that system technology refreshes are most critical 5-9 years after installation of the latest fielded version of the AN/SQQ-89A(V)15, as failure rates within this period begin to rise. Establishing a stable technology refresh program will ensure the Fleet maintains critical ASW and Undersea Warfare capability (threat-pacing improvements) and productivity (Increased Operational Availability (Ao)) while reducing the Total Ownership Cost (TOC) to the Navy. Shipset procurement costs reflect the addition/inclusion of Hypervisor Technology 0 (HT0) and Infrastructure as a Service (IaaS) technology advancement hardware/software. HT0 allows for the employment of virtual software, creating a separation between hardware and software to make both agnostic to one another, which serve to simplify future upgrades. HT0 also supports the transition to IaaS which builds on the virtualization of software by utilizing a common infrastructure. AN/SQQ-89A(V)15 TI-14 and above production baselines have a consistent architecture and similar configuration which allows a similar strategy that submarine Acoustic Rapid Commercial Off The Shelf (COTS) Insertion (ARCI) programs employ in order to retain equipment racks and upgrade processing, storage, and network capacity onboard the platform during installation. AN/SQQ-89A(V)15 - TECHNOLOGY INSERTION/REFRESH - BUILD-IN-PLACE - COST CODE DB6IN INSTALLATION: Funding is for the physical installation of the AN/SQQ-89A(V)15 Build-In-Place Technology Insertion/Refresh upgrade, and the ordering of incidental installation material and Design Services Allocation (DSA) efforts required for mandatory planning yard design tasks and ship checks that must be completed within the one year period leading up to the actual installation in the shipyard. Physical installation costs shown factor in the following cost drivers: The transition of hot work (i.e. welding) from Alteration Installation Teams (AITs) to shipyards; an increased reliance on AIT subject matter expertise to address shipyard installation deficiencies and schedule impacts via Condition Found Reports (CFRs); increased effort required to resolve System Installation Drawings (SID) deficiencies; fact-of-life increases associated with the prioritization of modernizations to be completed on outside-CONUS Forward-Deployed Naval Forces (FDNF) hulls (increased travel costs), HAZMAT disposition, and increased personnel requirements to accommodate shorter installation availability durations.

Justification

Justification AN/SQQ-89 Surf ASW Cmbt Sys

The FY 2026 request was reduced by $6.306 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative." AN/SQQ-89 - The FY 2026 budget request supports the technology refresh of previously fielded AN/SQQ-89A(V)15-equipped ships across all DDG 51 Class platforms to pace the threat and remain effective well into the 21st century. CV-TSC - The FY 2026 budget request supports the technology refresh of previously fielded systems to correct deficiencies identified through Fleet use, upgrade unreliable components, replace obsolete components, and address Information Assurance (IA) issues. SDRW - The FY 2026 budget request supports the procurement of emergency replacement, wire-reinforced, pressurized rubber acoustic windows and attachment hardware necessary to maintain a ready inventory of replacement assets to ensure uninterrupted performance of the ASW mission on all CG47 and DDG51 Class platforms. USW-DSS - The FY 2026 budget request supports the procurement of shore sites and tactical trainers, technology refresh of previously fielded USW-DSS-equipped ships, and latest USW-DSS baseline to be loaded on Consolidated Afloat Network and Enterprise Services (CANES)-equipped ships that did not have USW-DSS previously installed across CVN, DDG, and FFG Class platforms, necessary to facilitate the migration of key components of USW-DSS onto existing installed systems for Fleet use, stay compatible with the CANES hosting environment, and to deliver timely and cost-effective hardware/software improvements to the warfighter.

Budget Line Items(workbook-cited)

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, NavyNFY24 Actuals$133.8M
Other Procurement, NavyNFY25 Enacted$134.6M
Other Procurement, NavyNFY26 Disc. Request$144.4M
Other Procurement, NavyNFY26 Total$144.4M

Budget Details(R-2/P-40 facts)

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$2.61B$133.8M$134.6M$144.4M$144.4M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →