Printed from https://fiscalreceipts.com/program/0603833D8Z/ — data as of September 1, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Engineering Science & Technology
Budget Figures
No FY2026 R-1/P-1 workbook line for this program element. The FY2026 President's Budget request workbooks carry no row for it at all — not a blank FY2026 cell on a line that is still listed, but no line. The summary cards above read that one edition, which is why they are empty; the decade figures below read the editions that do carry this line. It last appears in the PB2022 workbook; no later President's Budget edition in this corpus carries it. The figures below are cited to 6 President's Budget editions, the earliest PB2017 and the latest PB2022, and report fiscal years FY2015 to FY2022. No ingested budget document in this corpus states a successor for this line.
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 |
|---|---|---|---|---|---|---|---|---|
| Actuals | $0 | $17.9M | $22.2M | $24.4M | $18.9M | $18.9M | – | – |
| Enacted | $18.3M | $17.7M | $25.4M | $19.4M | $19.4M | $0 | – | |
| Request | $17.7M | $25.4M | $19.4M | $19.4M | $0 | $0 |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2017 book requested $17.7M for FY2017; the PB2019 book reported $22.2M as actual total obligation authority — $4.54M above the request. 22.2 − 17.7 = 4.5 USD millions — the compact figures above are rounded for reading.
Program Lineage
Predecessors (funding flowed in)
- renamed from · per FY2017 J-book · BA5
show sentence
“(1) the Modeling and Simulation Management Office project previously funded from PE 0603832D8Z; (2) the Systems Engineering Research Center (SERC), previously funded in PE 0605142D8Z; and (3) the Engineered Resilient Systems effort, previously funded in PE 0602251D8Z, Applied Research for the Advancement of S&T Priorities.”
- renamed from · per FY2017 J-book · BA2
show sentence
“(1) the Modeling and Simulation Management Office project previously funded from PE 0603832D8Z; (2) the Systems Engineering Research Center (SERC), previously funded in PE 0605142D8Z; and (3) the Engineered Resilient Systems effort, previously funded in PE 0602251D8Z, Applied Research for the Advancement of S&T Priorities.”
- renamed from · per FY2017 J-book · BA5
show sentence
“This effort continues execution of the SERC program previously funded in PE 0605104D8Z and PE 0605142D8Z.”
- renamed from · per FY2017 J-book · BA3
show sentence
“In FY 2016, this Program Element (PE) will be transferred to a new PE 0603833D8Z entitled, "Engineering Science and Technology" in order to support the Deputy Assistant Secretary of Defense (Systems Engineering) priorities -- to “grow engineering capabilities to address emerging Defense challenges” and to “champion systems engineering as a tool to improve acquisition quality.”
0603833D8Z — Engineering Science & TechnologyFamily Funding Line
Funding chain: 0602251D8Z — Applied Research for the Advancement of S&T Priorities
- FY2017$42.2M
- FY2018$49.2M
- FY2019$60.7M
- FY2020$62.2M
- FY2021$60.7M
- FY2022$65.0M
- FY2023$67.7M
- FY2024$66.9M
- FY2025$51.6M
- FY2026$54.0M
This family branches — the funding line above is shown for the 1:1 chain only. Branch arms (splits or merges) are not summed into this series.
Description
No mission or description narrative for this line. Justification narratives are ingested from the FY2026 President's Budget books, and those carry no entry for this program element — the figures on this page come from earlier editions, which this corpus loads as workbook figures only.
Justification
No accomplishments or planned-program narratives for this line. The FY2026 President's Budget books, which are where this corpus reads R-2/P-40 prose from, carry no entry for this program element.
Line Items
No FY2026 line items: the FY2026 R-1/P-1 workbooks carry no row for this program element. Its cited figures are the earlier President's Budget editions' own workbook rows, in the decade table above.
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 149 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Engineering Science & Technology. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →