Family of Advanced BLoS Terminals (FAB-T)

Air ForceRDT&EReconciledPE1203001SF
Watch this program

Published budget signals for this program, with links to receipts.

Updates appear after a data refresh and publication. No fixed update schedule is available.

Paste the RSS address into a feed reader. No Fiscal Receipts account is required.

RSSAtom

What it is
Family of Advanced BLoS Terminals (FAB-T) (1203001SF) is an Air Force research & development line funded in the Research, Development, Test, and Evaluation, Space Force account. Its J-book detail breaks the line into 2 projects.
What changed
-$2.30M FY25→26 R-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 2 linked award records are listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$100.1MR-1 TOA · PB2026
FY25 Total
$2.61MR-1 TOA · PB2026
FY26 Request
$303.0KR-1 TOA · PB2026
FY25→26 Change
-$2.30MR-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $100.1MFY25: $2.61MFY26: $303.0KFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$100.1M
FY25$2.61M
FY26$303.0K

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

8 fiscal years of this program as published (FY2019–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
8 fiscal years of this program as published (FY2019–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY19FY20FY21FY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY19FY20FY21FY22FY23FY24FY25FY26
Actuals$0$0$224.2M$152.0M$124.4M$100.1M
Enacted–$0$232.2M$156.8M$128.2M$91.4M$2.61M
Request––$247.2M$156.8M$128.2M$91.4M$2.61M$303.0K

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2021 book requested $247.2M for FY2021; the PB2023 book reported $224.2M as actual total obligation authority — $23.0M below the request. 224.2 − 247.2 = -23.0 USD millions — the compact figures above are rounded for reading.

Program lineage

This program
1203001SF — Family of Advanced BLoS Terminals (FAB-T)

Successors (funding flowed out)

Family Funding Line

Funding chain: 1203001SF0303131F — Family of Advanced BLoS Terminals (FAB-T)

  • FY2017$47.5M
  • FY2018$48.8M
  • FY2019$99.1M
  • FY2020$13.5M
  • FY20211203001SF$247.2M0303131F$61.9M
  • FY20221203001SF$156.8M0303131F$20.7M
  • FY20231203001SF$128.2M0303131F$41.2M
  • FY20241203001SF$91.4M0303131F$33.6M
  • FY20251203001SF$2.61M0303131F$25.5M
  • FY20261203001SF$303.0K0303131F$99.6M

See this family in the lineage map →

Description

Mission — Family of Advanced BLoS Terminals (FAB-T)

Activities funded in this program element continue to pay for AN/USQ-225 integration into multiple legacy systems, other ongoing NC3 acquisition programs, and future capabilities for the overall AF NC3 WS. The Family of Advanced Beyond Line-of-Sight Terminals (FAB-T) - Command Post Terminal (CPT), Presidential and National Voice Conferencing (PNVC) Integrator, and Force Element Terminal (FET) programs - transitioned from AFPEO/SP to AFPEO/NC3 effective December 2018. The FAB-T - Command Post Terminal (FAB-T CPT) project replaces legacy Milstar (AFCPT) terminals and will provide Extremely High Frequency (EHF) protected high data rate communication for nuclear and conventional forces to include PNVC. FAB-T CPT will provide this new, highly secure, state-of-the-art capability for Department of Defense (DoD) platforms to include strategic platforms and airborne/ground command posts via Milstar, and Advanced EHF (AEHF), and Evolved Strategic SATCOM (ESS) satellite constellations. FAB-T CPTs will also support the critical command and control (C2) of the Milstar, Advanced EHF (AEHF), and Evolved Strategic SATCOM (ESS) satellite constellations. The Presidential and National Voice Conferencing (PNVC) Integrator project is a critical element of the Nuclear Command, Control, and Communications (NC3) System. PNVC integrator replaces the Survivable Emergency Conferencing Network (SECN) capability, and will provide anti-jam, anti-scintillation, survivable, and enduring voice communications via AEHF and ESS satellite constellations for national and strategic users. There are several components being developed and procured by other organizations that must be synchronized to expeditiously field the capability. The PNVC Integrator is responsible for end-to-end integration of these components, to include requirements traceability, end-to-end system testing, configuration and checkout activities, training and technical manuals, network transition support, identification of deficiencies in overall PNVC system capability, enterprise, and life cycle support for PNVC components. The AFPEO/SP approved entry into the acquisition lifecycle as a post MS-A Acquisition Category (ACAT) III Program of Record in January 2016. Starting in December 2018, PNVC Integrator became responsible for the funding requests of all program elements related to the Defense Information Systems and Agency (DISA) components of the PNVC System in accordance with FY 2018 National Defense Authorization Act, Sec. 1661. In March 2019, the AFPEO/NC3 declared the PNVC Integrator an ACAT II Program based on the inclusion of DISA funding in the program budget. FY 2026 transfer of $67.793M from Space Force (PE 1203001SF / Project 673040 / Appropriation 3620 / Research, Development, Test, and Evaluation) to Air Force (PE 0303131F, Project 673040 / Appropriation 3600 / Research, Development, Test, and Evaluation) Transfer Memo signed 12 Nov 2024. The FAB-T - Force Element Terminal (FAB-T FET) program replaces the Ultra High Frequency (UHF) Milstar terminals and provides secure, protected, and survivable communications for the strategic warfighter through airborne-based Military Satellite Communication (MILSATCOM) terminals. The FAB-T FET will provide worldwide nuclear and non-nuclear, survivable, anti-jam Low Probability of Detect (LPD)/ Low Probability of Intercept (LPI) data and voice communications. The FAB-T FET will be interoperable with Advanced Extremely High Frequency (AEHF), Enhanced Polar Systems - Recapitalization (EPS-R), and satellite constellations utilizing waveforms and will be installed on the B-52 aircraft (threshold). FAB-T FET was designated as a Middle Tier of Acquisition (MTA) in February 2019. The FY 2026 cost of the FAB-T FET Middle Tier of Acquisition effort is reflected in the budget request, including RDT&E and procurement of prototype. The Department will certify Future Year Defense Program funding in a future budget submission. FAB-T FET is planned to transition to the Major Capability Acquisition (MCA) Pathway at Milestone C. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program's funds would be in addition to the civilian pay expenses budgeted in program element 0605827F, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, 0606398F. In FY24 $0.000M was expended for civilian pay expenses in this program element, and in FY25 $0.000 is forecasted for civilian pay expenses in this program element. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year.

Mission — Presidential and National Voice Conferencing

The Presidential and National Voice Conferencing (PNVC) Integrator project is a critical element of the Nuclear Command, Control, and Communications (NC3) System. PNVC integrator replaces the Survivable Emergency Conferencing Network (SECN) capability, and will provide anti-jam, anti-scintillation, survivable, and enduring voice communications via Milstar, Advanced EHF, and ESS satellite constellations for national and strategic users. There are several components being developed, procured and updated by other organizations that must be synchronized to expeditiously field this capability. The PNVC Integrator is responsible for end-to-end integration of these components, to include requirements traceability, end-to-end system testing, configuration and checkout activities, training and technical manuals, network transition support, identification of deficiencies in overall PNVC system capability, enterprise, and life cycle support for PNVC components. The AFPEO/SP approved entry into the acquisition life-cycle as a post MS-A Acquisition Category (ACAT) III Program of Record in January 2016. In March 2019 the AFPEO/NC3 declared the PNVC Integrator an ACAT II Program based on updated approved budget request. Starting in December 2018 PNVC Integrator became responsible for the funding requests of all program elements related to the Defense Information Systems and Agency (DISA) components of the PNVC System in accordance with FY 2018 National Defense Authorization Act, Sec. 1661. In October 2021, PNVC completed Milestone B/C.

Mission — Force Element Terminal

The FAB-T - Force Element Terminal (FAB-T FET) program replaces the Ultra High Frequency (UHF) Milstar terminal and provides secure, protected, and survivable communications for the strategic warfighter through airborne-based Military Satellite Communication (MILSATCOM) terminals. The FAB-T FET will provide worldwide nuclear and non-nuclear, survivable, anti-jam Low Probability of Detect (LPD)/ Low Probability of Intercept (LPI) data and voice communications. The FAB-T FET will be interoperable with Advanced Extremely High Frequency (AEHF), Enhanced Polar Systems - Recapitalization (EPS-R), and satellite constellations utilizing waveforms and will be installed on the B-52 aircraft (threshold). FAB-T FET was designated as a Middle Tier of Acquisition (MTA) in February 2019 and is expected to be designated as Major Capability Acquisition at Milestone C.

Justification

Accomplishments & Planned Programs (2)

PNVC Integrator

PNVC is the SECN replacement capability which provides anti-jam, anti-scintillation, survivable, and endurable voice communications via Milstar, Advanced EHF, and ESS satellite constellations for national and strategic users. The PNVC capability consists of constituent programs being developed and produced by other organizations. This program will integrate, test, and support configuration of hardware from these other programs. PNVC components will be installed at ground fixed and mobile command locations as well as three aircraft platforms.

FAB-T FET

Continue development of FETs. Development activities include, but are not limited to, FAB-T FET design, development, and qualification testing.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test, and Evaluation, Space ForceFFY24 Actuals$100.1M
Research, Development, Test, and Evaluation, Space ForceFFY25 Enacted$2.61M
Research, Development, Test, and Evaluation, Space ForceFFY25 Total$2.61M
Research, Development, Test, and Evaluation, Space ForceFFY26 Disc. Request$303.0K
Research, Development, Test, and Evaluation, Space ForceFFY26 Total$303.0K

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$0$100.1M$2.61M$303.0K$303.0K
673035: Presidential and National Voice Conferencing$0$35.3M$2.00M$303.0K$303.0K
673040: Force Element Terminal$0$64.8M$604.0K$0$0

Follow the dollar

Appropriation → program element → top high-confidence awards → recipient families → congressional districts.

Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →

The program's money traced left to right: the F appropriation, program element 1203001SF (Family of Advanced BLoS Terminals (FAB-T)), its 1 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.
The program's money traced left to right: the F appropriation, program element 1203001SF (Family of Advanced BLoS Terminals (FAB-T)), its 1 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.APPROPRIATIONPROGRAM ELEMENTTOP AWARDSRECIPIENT FAMILIESDISTRICTSFRDT&E appropriation1203001SF303.0K FY26FA870513C0005RAYTHEON COMPANY433.5MRTX CorporationMA-03

The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.

The diagram as text: one row per congressional district in the diagram, the recipient families shown there, and that district's cited program obligations.
DistrictProgram obligations
MA-03$410.3M

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.

RecipientPIIDConfidence
RAYTHEON COMPANYFA870513C0005high
RAYTHEON COMPANYFA873520C0003medium

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Family of Advanced BLoS Terminals (FAB-T). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.