Air ForceProcurementReconciledBLILRASM0
Watch this program

Published budget signals for this program, with links to receipts.

Updates appear after a data refresh and publication. No fixed update schedule is available.

Paste the RSS address into a feed reader. No Fiscal Receipts account is required.

RSSAtom

What it is
LRASM0 (LRASM0) is an Air Force procurement line funded in the Missile Procurement, Air Force account.
What changed
+$52.5M FY25→26 P-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 5 linked award records are listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$514.9MP-1 TOA · PB2026
FY25 Enacted
$354.1MP-1 TOA · PB2026
FY26 Request
$406.6MP-1 TOA · PB2026
27.6% reconciliation

$294.4M discretionary + $112.2M one-time reconciliation. Discretionary change vs FY2025 enacted: -16.9%.

FY25→26 Change
+$52.5MP-1 TOA · PB2026

Two official figures, one label— reconciled below

Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows that the R-2/P-40 J-book program line excludes — advance procurement in an ordinary year, and in FY2026 the one-time reconciliation appropriation as well. Each row below names the one it is. How the two bases relate →

FY26 Request · $406.6M TOA − $294.4M J-book line = 112.2M (406.6 − 294.4 = 112.2) — $112.2M of one-time FY2026 reconciliation money accounts for this gap — not advance procurement

Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.

Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $514.9MFY25: $354.1MFY26: $406.6MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$514.9M
FY25$354.1M
FY26$406.6M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$0$211.6M$514.9M
Enacted–$106.0M$187.7M$354.1M
Request––$187.7M$354.1M$406.6M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $187.7M for FY2024; the PB2026 book reported $514.9M as actual total obligation authority — $327.3M above the request. 514.93 − 187.67 = 327.26 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — LRASM0

In the FY 2024 budget request, the Department is initiating a Multiyear Procurement (MYP) strategy for LRASM, under the Large Lot Procurement (LLP) concept in which individual MYPs would be executed in a concurrent and overlapping multiyear strategy so that synergies in production across different but related programs can generate efficiencies and result in greater production capacity, accelerated delivery, and lower unit costs. LLP represents an evolution of the existing MYP contracting and financing strategy, that leverages the savings generated through the use of Economic Order Quantities (EOQ) financing to procure additional lots of missiles under a Buy-to-Budget concept, to further improve efficiencies and yields. The Long Range Anti-Ship Missile (LRASM) is an ACAT 1C program and increment 1 of the Offensive Anti-Surface Warfare (OASuW) weapon development program. LRASM (AGM-158C) addresses an air-launch capability gap by providing flexible, long-range, advanced, anti-surface capability against high-threat maritime targets. LRASM (AGM-158C) achieved Early Operational Capability (EOC) in December 2018 on the USAF B-1 Lancer and EOC on the USN F/A-18E/F Super Hornet in November 2019. The USN is the lead service for the LRASM program. LRASM is highly leveraged on the design of the Joint Air-to-Surface Standoff Missile-Extended Range (JASSM-ER). LRASM and JASSM-ER have over 70% hardware commonality and share the same production assembly line. The USAF and USN jointly procure LRASMs via a USAF contract that benefits from cost savings when aligned with JASSM-ER procurements. LRASM All Up Round (AUR) unit cost and quantities in this Program Element (PE) are dependent on USN LRASM PE 0204167N and USAF JASSM PE 0207325F. In the FY 2024 budget request, the Department initiated a Multiyear Procurement (MYP) strategy for JASSM and LRASM under the Large Lot Procurement (LLP) concept. The MYP will be executed in a concurrent and overlapping multiyear strategy so that synergies in production across different but related programs can generate efficiencies and result in stabilization of the industrial base. FY 2024 Procurement fully funds the 8th production lot for the LRASM Program as well as provides Economic Order Quantities for Lots 9-12 under the MYP strategy. FY 2025 aligns the first year of LRASM MYP and Lot 9 procurement of AGM-158C (1.0/1.1) and AGM-158C-3 variants. The LRASM AGM-158C-3 variant will be a forward fit Engineering Change Proposal (ECP) to the AGM-158C, to enhance long range strike and existing OASuW capability. In FY26, the USAF will continue procuring LRASM C-1s and LRASM C-3s, until the missile inventory objective is met. LRASM C-3 (AGM-158C-3) EOC on the USN F/A-18E/F is planned by 4QCY26 while USAF C-3 integration on the B-1B is funded in FY26-28. In addition to procuring LRASM All Up Rounds, funds in this exhibit will be used for production tooling & equipment and addressing Diminishing Manufacturing Sources and Material Shortages (DMSMS) issues through studies, bridge buys, life of type buys, supplier/parts replacement, to include electronic components used commercially and in short supply and qualification and reliability activities to preserve future production capabilities and capacities. This requirement supports performance of a full financial audit as required by Tittle 10 U.S.C. Charter 9A, Sec 240D. Funding for this exhibit is contained in PE 0207325F. The FY 2026 request for the Long-Range Anti-ship Missile (LRASM) includes $294,401 thousand of discretionary and $112,225 thousand of mandatory (reconciliation) for a total of $406,626 thousand. The mandatory funds will procure an additional 25 LRASMs in FY 2026. Further information for this reconciliation request is provided in Chapter 20004 (Munitions & Supply Chain) of the Reconciliation Exhibit.

Justification

Justification — LRASM0

FY 2026 funding totals include $319.369M in base dollars to procure 93 missiles. FY 2025 funding (combined with the FY 2024 Advance Procurement amount $24.968 million supporting Lot 9) provides $379.067 million to procure 115 missiles. FY 2024, funding included $415.056M and procured 118 missiles at 3.517 cost per missile. Of the $415.056M, $115.92 million was Ukraine PDA replacement funds via reprogramming action. Note: Procurement quantities can change based on negotiated options/pricing bands and available funding, in accordance with Title 10, U.S. Code Section 3069 BUY-TO-BUDGET ACQUISITION.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Missile Procurement, Air ForceFFY24 Actuals$514.9M
Missile Procurement, Air ForceFFY25 Enacted$354.1M
Missile Procurement, Air ForceFFY26 Disc. Request$294.4M
Missile Procurement, Air ForceFFY26 Reconciliation$112.2M
Missile Procurement, Air ForceFFY26 Total$406.6M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$418.9M$514.9M$354.1M$294.4M$294.4M

Follow the dollar

Appropriation → program element → top high-confidence awards → recipient families → congressional districts.

Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →

The program's money traced left to right: the F appropriation, program element LRASM0 (LRASM0), its 6 largest high-confidence awards, the 1 recipient family behind them, and the 2 congressional districts the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.
The program's money traced left to right: the F appropriation, program element LRASM0 (LRASM0), its 6 largest high-confidence awards, the 1 recipient family behind them, and the 2 congressional districts the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.APPROPRIATIONPROGRAM ELEMENTTOP AWARDSRECIPIENT FAMILIESDISTRICTSFProcurement appropriationLRASM0406.6M FY26FA868224CB001LOCKHEED MARTIN CORPORATION7.20BFA868221C0004LOCKHEED MARTIN CORPORATION576.9MFA868217C0037LOCKHEED MARTIN CORPORATION561.8MFA868220C0003LOCKHEED MARTIN CORPORATION177.6MFA868219C0010LOCKHEED MARTIN CORPORATION172.1MFA868219C0010LOCKHEED MARTIN CORPORATION22.9MLockheed Martin CorpFL-10FL-11

The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.

The diagram as text: one row per congressional district in the diagram, the recipient families shown there, and that district's cited program obligations.
DistrictProgram obligations
FL-10$8.53B
FL-11$172.1M

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

RecipientPIIDConfidence
LOCKHEED MARTIN CORPORATIONFA868217C0037high
LOCKHEED MARTIN CORPORATIONFA868219C0010high
LOCKHEED MARTIN CORPORATIONFA868220C0003high
LOCKHEED MARTIN CORPORATIONFA868221C0004high
LOCKHEED MARTIN CORPORATIONFA868224CB001high

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not LRASM0. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.