Printed from https://fiscalreceipts.com/program/0207325F/ — data as of July 28, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Joint Air-to-Surface Standoff Missile (JASSM)
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
- FY24
- $129.3M
- FY25
- $181.7M
- FY26
- $232.3M
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $12.4M | $9.22M | $23.1M | $29.4M | $40.9M | $73.5M | $63.7M | $114.0M | $123.9M | $129.3M | ||
| Enacted | $9.79M | $30.0M | $29.9M | $42.5M | $78.5M | $70.7M | $117.3M | $117.2M | $132.9M | $181.7M | ||
| Request | $30.0M | $29.9M | $60.1M | $78.5M | $70.8M | $117.3M | $117.2M | $132.9M | $183.5M | $232.3M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2019 book requested $60.1M for FY2019; the PB2021 book reports $40.9M actually spent — $19.1M below the request.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — JASSM Extended Range (JASSM-ER)
The Joint Air-to-Surface Standoff Missile (JASSM) family of missiles includes: JASSM Baseline (JASSM-BL/AGM-158A) and JASSM Extended Range (JASSM-ER/AGM-158B, AGM-158B-2, AGM-158B-3, and AGM-158D). JASSM-ER provides a long range, conventional air-to-surface, autonomous, precision-guided, low observable, standoff cruise missile compatible with fighter and bomber aircraft. JASSM-ER provides the capability to attack a variety of high value fixed or relocatable targets with precision, through preplanned missions or target-of-opportunity, deeper into enemy territory than JASSM-BL, all while minimizing the threat to launch aircraft. Aircraft integration of JASSM-ER/AGM-158B is complete on the B-1, F-15E, F-16, B-2, and B-52. Objective aircraft are F-15E, F-16, B-52, B-2, and further integration is required for the F-35. The AGM-158A, AGM-158B, and AGM-158B-2 are fielded. The AGM-158B-3 and AGM-158D are in development and will gradually insert into the production line as the new missile builds are approved and ready. Missiles accepted by the Air Force will not be returned for modification to the newest variant. Threats to JASSM survivability are being rapidly developed and fielded by near-to-peer adversaries. JASSM continued development enhances capability and provides operational flexibility against current and projected threats. This is accomplished by evaluating high payoff technology development, performing risk reduction activities, and investigating new variants and/or alternate missions that may use JASSM attributes. To maximize effectiveness of existing inventory and address findings from the field, the Air Force develops, tests, and fields improvements via software upgrades into fielded missiles and/or hardware upgrades inserted into the production line. The AGM-158B-2 is an upgrade to the existing JASSM-ER/AGM-158B, incorporating multiple development initiatives to respond to rapidly changing threats and is being produced in Lot 19. The AGM-158B-3 provides M-code capability and will begin a production cut-in starting in Lot 22. The AGM-158D provides Weapon Data Link (WDL) capability to re-target the missile, post-launch, against relocatable or higher priority targets during mission execution. The AGM-158D will begin a production cut-in starting in Lot 22. Weapon Data Link (WDL), This effort includes development of the WDL, as well as integration and testing efforts. The WDL allows warfighters to retarget the weapons via line-of-sight and beyond-line-of-sight, allowing the missile to attack relocatable and/or time sensitive targets post aircraft release. Test assets encompass AGM-158B-3 and AGM-158D in FY24-26. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program element 0605827F, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, 0606398F. In FY24, .97M was allocated for civilian pay expenses in this program element. In FY25, 1.216M is forecasted for civilian pay expenses in this program element. Implements tenets of Open, Agile, and Digital acquisition for any new subsystem hardware or software development. Integrates the system in weapon portfolio tradespace studies by conducting trade studies, system engineering, test activities, and system modeling and simulation. Builds and refines a mission modeling framework by incorporating higher-fidelity weapon system designs and updates to the threat landscape to conduct ongoing assessment of weapon system performance against the authoritative threat. Leverages common component development, in collaboration with other weapon systems, to reduce redundant costs between systems with similar subsystems requirements. Invests in analytical, data management, digital environments, networks, facilities, and security infrastructure upgrades supporting development of this program's capabilities, while leveraging DoD and DAF enterprise IT solutions. The Weapon Data link (WDL) allows warfighters to retarget the weapons via line-of-sight and beyond-line-of-sight, allowing the missile to attack relocatable and/or time sensitive targets post aircraft release. The WDL program is designed to use an open-system architecture standard with outside communication nodes. This requirement supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Funding for this exhibit is contained in PE 0207325F. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year.
Justification
Accomplishments & Planned Programs (4)
Other Development/Safety/Survivability
This system improvement program (SIP) focuses on maintaining and upgrading capability and includes development, integration, and testing and will continue to enhance missile survivability through subsystem updates, including cyber security implementation. The SIP will explore and exploit new form, fit, function hardware to maximize missile performance and address newly matured capabilities and emerging threats. These updates will be incorporated via engineering change proposals (ECPs). Potential efforts could include development and integration of advanced Precision, Navigation, and Timing (PNT) capabilities, non-GPS, optical, passive, active, etc. evaluations (study analysis), survivability enhancements, safety certifications, flight testing, and open architecture efforts. A GPS Military (M) Code receiver is being developed to enable the missile to meet National Defense Authorization Act requirements.
Warfighting Capability Enhancement
Design and development of software and mission planning changes to ensure the missile maintains operational effectiveness in classified scenarios. JASSM variants are: JASSM baseline (JASSMBL/AGM-158A) in sustainment, JASSM Extended Range (JASSM-ER/AGM-158B, AGM-158B-2, AGM-158B-3 and AGM-158D).
Advanced Survivability, Integration, and Test
This effort includes development, integration and testing and will continue to enhance missile survivability through subsystem updates including cyber security implementation. The AGM-158B-2 will include a new Electronic Safe and Arm Fuze (ESAF), JASSM Anti-Jam Global Positioning System (GPS) Receiver with Selective Availability Anti-Spoofing Module (JAGR-S V5), an upgraded Missile Control Unit (MCU), Gigabit Ethernet Connector, and enhanced C++ software. This missile variant leverages LRASM coatings, Power Converter Assembly (PCA), Aft Cover and Power and Engine Control Unit (PECU) for improved production commonality.
Weapon Data Link (WDL)
This effort includes development of the Weapon Data Link (WDL), as well as integration and testing efforts. The WDL allows warfighters to retarget the weapons via line-of-sight and beyond-line-of-sight, allowing the missile to attack relocatable and/or time sensitive targets post aircraft release. The WDL program is designed to use an open-system architecture standard with outside communication nodes. The WDL effort reflected in 2024 consisted of the addition of a radio to the existing AGM-158B-2 variant. As of 2025, the JPO received additional requirements from the Air Combat Command resulting in a new AGM-158D JASSM variant and driving a significant increase in the level of effort required to deliver capability. The additional requirements have added complexity to the program, necessitating more developmental time. The scope increase includes antenna development and integration, fuel tank redesign and integration, terminal sensor integration, development and testing of C2 capability and 158D-specific C++ software, weight reduction, and a complete test plan which results in the schedule extending to FY 2027.
Budget Line Items(workbook-cited)
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Air Force | F | FY24 Actuals | $129.3M |
| Research, Development, Test and Evaluation, Air Force | F | FY25 Enacted | $181.7M |
| Research, Development, Test and Evaluation, Air Force | F | FY25 Total | $181.7M |
| Research, Development, Test and Evaluation, Air Force | F | FY26 Disc. Request | $232.3M |
| Research, Development, Test and Evaluation, Air Force | F | FY26 Total | $232.3M |
Budget Details(R-2/P-40 facts)
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| 675356: JASSM Extended Range (JASSM-ER) | $691.0M | $129.3M | $181.7M | $232.3M | $232.3M |
| Program Element | $691.0M | $129.3M | $181.7M | $232.3M | $232.3M |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →