Skip to content
Fiscal Receipts

Large Aircraft Infrared Countermeasures

FProcurementPartial ReconciliationLAIRCM
What it is
Large Aircraft Infrared Countermeasures — a procurement program run by Air Force.
What changed
No FY25→26 comparison — trajectory data incomplete for this line.
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$26.1M
FY25 Total
FY26 Request
$35.2M
FY25→26 Change

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
FY24: $26.1MFY26: $35.2MFY24FY26
FY24
$26.1M
FY26
$35.2M
Decade view — each figure cites its own President's Budget edition
FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY22FY23FY24FY25FY26
Actuals$57.0M$44.7M$26.1M
Enacted$37.3M$21.7M$52.1M
Request$21.7M$52.1M$35.2M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $21.7M for FY2024; the PB2026 book reports $26.1M actually spent — $4.34M above the request.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description Large Aircraft Infrared Countermeasures

The Large Aircraft Infrared Countermeasures (LAIRCM) system is an evolutionary acquisition program that provides significantly improved defensive systems capability for DOD aircraft to counter the man-portable air-defense systems (MANPADS) and Infrared missile threats. The system is currently installed on over 54 aircraft types and over 1200 aircraft flown by United States Air Force, Navy, and 18 Foreign Military Partners. This system is fully autonomous following power-up and consists of Group A aircraft modification kits and Group B hardware. The current LAIRCM system configuration consists of missile warning sensors (MWS), a laser transmitter assembly, control interface unit and processors to detect, track, jam and counter incoming missiles. The production program maintains a robust reliability program which results in the incorporation of reliability enhancements improving overall producibility, while gaining the inherent benefit of improved long-term sustainment. There are numerous LAIRCM configurations installed on a variety of aircraft, however, all configurations include a processor and a control indicator unit. Configurations can be differentiated by the type of missile warning sensors and laser transmitter assemblies. Funding supports efforts that can include, but are not limited to: Hardware Procurement (Group A and Group B), Installation, Installation Support, Initial Spares, Support Equipment, Government Furnished Equipment (GFE) and GFE Repairs, Line Replaceable Unit (LRU) Repairs, Interim Contractor Support (ICS), Depot Standup, Systems Engineering and Program Management (SEPM), Failure Reporting and Corrective Analysis Support (FRACAS), Non-recurring Production Engineering, Software Testing and improvements, Other Government Costs (OGCs), Pre-Planned Product Improvements, Program Support, Simulators/Maintenance Trainers, Software Updates and Data. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. Like most programs, LAIRCM faces the challenges associated with resolving DMS issues and software errors / inefficiencies. These shared costs to maintain the fleet are captured in its own common LAIRCM Program Office support enterprise Mod Number, 8629LC. The LAIRCM program office seeks to ensure continued production of LAIRCM components for all LAIRCM customers. Funding may be used to address DMS issues and software corrections or minor improvements. The LAIRCM DMS program includes all activities associated with monitoring and identifying DMS issues. It also includes all activities required to resolve DMS issues such as: 1) the use of existing material solutions which involves actions to secure availability of existing supply (i.e., life of type buy and extension of production or support); 2) implementing substitutes which includes engineering activities to qualify and implement the identified substitute (i.e., approved part; repair, refurbishment, or reclamation; simple substitute; and complex substitute); and 3) redesign which includes all aspects of engineering and qualification to implement new or highly modified equipment (i.e., development of a new item or source; redesign of a next higher assembly; and redesign of a complex/system replacement). Automated testing effort will establish the automated test environment Mobile Systems Integration Laboratory (MSIL), Virtual Systems Integration Laboratory (VSIL), and Automated Systems Integration Laboratory (ASIL) to establish automated formal qualification testing at the software (Software Formal Qualification Test (SFQT)) and system (Design Verification Test (DVT)) levels for use with fielded and current LAIRCM configuration assets impacted by DMSMS. Automated testing will result in improved software quality, accelerated development cycles, and reduce the risk of introducing bugs or regressions into the codebase. LAIRCM kit quantities purchased are dependent on the unit cost and/or the installation cost of the kits. Additionally, LAIRCM B-kit purchase must lead A-Kit procurement and installation by 24 months. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. The FY 2026 request was reduced by $0.655 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative." Funding for this exhibit contained in PE 0401134F.

Justification

Justification Large Aircraft Infrared Countermeasures

FY 2026 LAIRCM funding will provide the installation of ten (10) C-130J Block 30 kits and OSA/EA Block 30 Installation support. Remaining funds will support common LAIRCM program office costs; example activities include DMS mitigation, engineering support, and software test automation.

Budget Line Items(workbook-cited)

Exhibit P-1

AccountOrgTypeAmount
Aircraft Procurement, Air ForceFFY24 Actuals$26.1M
Aircraft Procurement, Air ForceFFY25 Enacted$52.1M
Aircraft Procurement, Air ForceFFY26 Disc. Request$35.2M
Aircraft Procurement, Air ForceFFY26 Total$35.2M

Exhibit P-1R

AccountOrgTypeAmount
Aircraft Procurement, Air ForceFFY24 Actuals$2.39M
Aircraft Procurement, Air ForceFFY25 Enacted$599.0K

Budget Details(R-2/P-40 facts)

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$666.1M$26.1M$52.1M$35.2M$35.2M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →