Joint Air-Surface Standoff Missile
Budget figures
$328.1M discretionary + $490.0M one-time reconciliation. Discretionary change vs FY2025 enacted: -60.0%.
Two official figures, one label— reconciled below
Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows that the R-2/P-40 J-book program line excludes — advance procurement in an ordinary year, and in FY2026 the one-time reconciliation appropriation as well. Each row below names the one it is. How the two bases relate →
FY26 Request · $818.1M TOA − $328.1M J-book line = 490.0M (818.1 − 328.1 = 490.0) — $490.0M of one-time FY2026 reconciliation money accounts for this gap — not advance procurement
Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $2.73B |
| FY25 | $820.1M |
| FY26 | $818.1M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $710.5M | $835.0M | $2.73B | ||
| Enacted | – | $785.0M | $1.69B | $820.1M | |
| Request | – | – | $1.69B | $825.1M | $818.1M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $1.69B for FY2024; the PB2026 book reported $2.73B as actual total obligation authority — $1.04B above the request. 2,729.3 − 1,685.7 = 1,043.6 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Joint Air-Surface Standoff Missile
In the FY 2024 budget request, the Department is initiating a Multiyear Procurement (MYP) strategy for JASSM, under the Large Lot Procurement (LLP) concept in which individual MYPs would be executed in a concurrent and overlapping multiyear strategy so that synergies in production across different but related programs can generate efficiencies and result in greater production capacity, accelerated delivery, and lower unit costs. LLP represents an evolution of the existing MYP contracting and financing strategy, that leverages the savings generated through the use of Economic Order Quantities (EOQ) financing to procure additional lots of missiles under a Buy-to-Budget concept, to further improve efficiencies and yields. The Joint Air-to-Surface Standoff Missile (JASSM) is an ACAT 1C program. This program provides a long range, conventional air-to-surface, autonomous, precision guided, standoff cruise missile compatible with fighter and bomber aircraft able to attack a variety of fixed or relocatable targets. The JASSM family of missiles includes JASSM Baseline (JASSM-BL/AGM-158A) and JASSM Extended Range (JASSM-ER/ AGM-158B, JASSM-ER/AGM-158B-2, JASSM-ER/AGM-158B-3, and JASSM-ER/AGM-158D). The AGM-158A is no longer in production. The AGM-158A, B, and B-2 are fielded. The AGM-158B-3 and D are in development. The variants in development will be gradually inserted into the production line as a new missile build once ready. Missiles accepted by the Air Force will not be returned for modification to the newest variant. In the FY 2024 budget request, the Department initiated a Multiyear Procurement (MYP) strategy for JASSM and LRASM, under the Large Lot Procurement (LLP) concept. The MYP will be executed in a concurrent and overlapping multiyear strategy so that synergies in production across different but related programs in sequential production lots generate efficiencies and result in stabilization of the industrial base. The AGM-158B-2 replaces obsolete components and provides a new electronic fuze, a new Global Positioning System (GPS) receiver, an upgraded Missile Control Unit (MCU) Unit, and enhanced software. The AGM-158B-2 began low-rate initial production (LRIP) in Lot 19/FY21 funding year. The AGM-158B-3 provides GPS M-Code capability and a terminal sensor. It began LRIP in Lot 22/FY24 funding year. The AGM-158D provides Weapon Data Link (WDL) capability to re-target the missile, post-launch, against relocatable or higher priority targets during mission execution. AGM-158D was originally planned for a Lot 20/FY22 cut-in but was restructured to begin production in Lot 22/FY24 funding year to support joint interoperability requirements. Efforts also include, but are not limited to, production cut-in of alternate communication methods, architectures and waveforms to advance missile capabilities against emerging threats. FY24 Procurement fully funds the 22nd production lot as well as AGM-158B-3 and AGM-158D Low-Rate Initial Production (LRIP), provides advanced procurement for Lot 23, and Economic Order Quantities for Lots 22-26 under the MYP strategy. FY25 Procurement fully funds the 23rd production lot. FY26 Procurement fully funds the 24th production lot. In the FY 2026 budget, the JASSM program will be in the third year of the MYP. In addition to procuring JASSM All Up Rounds, funds in this exhibit will be used for production tooling & equipment and addressing Diminishing Manufacturing Sources and Material Shortages (DMSMS) issues through studies, bridge buys, life of type buys, supplier/parts replacement, to include electronic components used commercially and in short supply and qualification and reliability activities to preserve future production capabilities and capacities Threshold aircraft is the B-1 and the objective aircraft are the B-52, F-16, B-2, F-15E, and F-35A. Aircraft integration for JASSM-BL/AGM-158A is complete on the B-52H, F-16 (Block 40-52), B-1, B-2, and F-15E. Aircraft integration for JASSM-ER/AGM-158B is complete on the B-1, B-2, F-15E, F-16 (Block 40-52), and B-52H. JASSM Lots 2-10 are covered under an Original Equipment Manufacture (OEM) warranty. Lots 11 and beyond are covered under a Contractor Logistics Support (CLS) contract, and missile initial/replenishment spares program funds are required to fill the spare parts pipeline under this program. Procurement quantities are estimates only and fall within a range of quantities based on negotiations for each specific lot contract. Procurement quantities are estimates only and fall within a range of quantities based on negotiations for each specific lot contract. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. The program also plans to use funds to address obsolescence issues and reliability improvement, including flight testing, studies, bridge buys, life of type buys, supplier/parts replacement, to include electronic components used commercially and in short supply, and qualification activities to preserve future production capabilities and capacity. The FY 2026 request for the Joint Air-to-Surface Standoff Missile (JASSM) includes $328,081 thousand of discretionary and $490,000 thousand of mandatory (reconciliation) for a total of $818,081 thousand. The mandatory funds will procure an additional 245 JASSMs in FY2026. Further information for this reconciliation request is provided in Chapter 20004 (Munitions & Supply Chain) of the Reconciliation Exhibit. This requirement supports performance of a full financial audit as required by Title 10 U.S.C. Chapter 9A, Sec 240-D. Funding for this exhibit contained in PE 0207325F
Justification
Justification — Joint Air-Surface Standoff Missile
FY26 funding (combined with the FY 2024 Advance Procurement amount 182.418 million supporting Lot 24) provides 510.499 million to procure 144 missiles FY25 funding (combined with the FY 2024 Advance Procurement amount 222.418 million supporting Lot 23) provides 1,042.469 million to procure 450 missiles. Full funding for every end item requesting advance procurement is included in the budget submission. FY24 funding totals include 1,959.580M to procure 1,140 missiles. Variant mix totals in all Fiscal Years are above MSR. The increase in Test Support/Reliability/Obsolescence from FY25 to FY26 reflected in the P-5 is to fund increased Weapon System Evaluations, test instrumentation kits and batteries. Additionally, these totals include an increase in obsolescence associated with the production of the new AGM-158-B-3 and AGM-158D variants, which adds Weapon Data Link Radio, antenna, terminal sensor and fuel tanks. As weapon inventory increases, obsolescence costs will also increase. Note: Procurement quantities can change based on negotiated options/pricing bands and available funding, in accordance with Title 10, U.S. Code Section 3069 BUY-TO-BUDGET ACQUISITION.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Missile Procurement, Air Force | F | FY24 Actuals | $2.73B |
| Missile Procurement, Air Force | F | FY25 Enacted | $820.1M |
| Missile Procurement, Air Force | F | FY26 Disc. Request | $328.1M |
| Missile Procurement, Air Force | F | FY26 Reconciliation | $490.0M |
| Missile Procurement, Air Force | F | FY26 Total | $818.1M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $6.66B | $2.73B | $820.1M | $328.1M | $328.1M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.
Showing 25 of 33 award records (this program's published budget→award crosswalk links — see methodology)
| Recipient | PIID | Confidence |
|---|---|---|
| GUARD-LEE, INC. | FA868219C0011 | medium |
| LOCKHEED MARTIN CORPORATION | FA868210C0016 | medium |
| LOCKHEED MARTIN CORPORATION | FA868214C0084 | medium |
| LOCKHEED MARTIN CORPORATION | FA868216C0005 | medium |
| LOCKHEED MARTIN CORPORATION | FA868217C0037 | medium |
| LOCKHEED MARTIN CORPORATION | FA868217F1008 | medium |
| LOCKHEED MARTIN CORPORATION | FA868217F1009 | medium |
| LOCKHEED MARTIN CORPORATION | FA868217F1015 | medium |
| LOCKHEED MARTIN CORPORATION | FA868217F1016 | medium |
| LOCKHEED MARTIN CORPORATION | FA868218C0009 | medium |
| LOCKHEED MARTIN CORPORATION | FA868218F1036 | medium |
| LOCKHEED MARTIN CORPORATION | FA868218F1039 | medium |
| LOCKHEED MARTIN CORPORATION | FA868218F1047 | medium |
| LOCKHEED MARTIN CORPORATION | FA868219C0008 | medium |
| LOCKHEED MARTIN CORPORATION | FA868219C0009 | medium |
| LOCKHEED MARTIN CORPORATION | FA868219C0010 | medium |
| LOCKHEED MARTIN CORPORATION | FA868219F1010 | medium |
| LOCKHEED MARTIN CORPORATION | FA868219F1013 | medium |
| LOCKHEED MARTIN CORPORATION | FA868219F1038 | medium |
| LOCKHEED MARTIN CORPORATION | FA868220C0001 | medium |
| LOCKHEED MARTIN CORPORATION | FA868220C0003 | medium |
| LOCKHEED MARTIN CORPORATION | FA868220F1002 | medium |
| LOCKHEED MARTIN CORPORATION | FA868220F1005 | medium |
| LOCKHEED MARTIN CORPORATION | FA868220F1006 | medium |
| LOCKHEED MARTIN CORPORATION | FA868220F1008 | medium |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
4 mentions from the Senate LDA disclosure database.
H.R. 9170; H.R. 8870, FY27 Transportation, Housing and Urban Development, and Related Agencies (THUD) Appropriations…
S. 2465/H.R. 4552/H.R. 1 (P.L. 119-21)/H.R. 7148, FY26 Transportation, Housing and Urban Development, and Related…
S. 2465/H.R. 4552/H.R. 1 (P.L. 119-21), FY26 Transportation, Housing and Urban Development, and Related Agencies…
S. 2465/H.R. 4552/H.R. 1 (P.L. 119-21), FY26 Transportation, Housing and Urban Development, and Related Agencies…
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Joint Air-Surface Standoff Missile. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O948,O950
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O913,O914
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O964
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
FY2026 Air Force Missile Procurement · www.saffm.hq.af.mil