Printed from https://fiscalreceipts.com/program/FBLOST/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Family of Beyond Line-of-Sight Terminals
Watch this program
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $25.1M |
| FY25 | $17.3M |
| FY26 | $15.4M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $36.5M | $16.1M | $25.1M | ||
| Enacted | – | $16.1M | $25.1M | $17.3M | |
| Request | – | – | $25.1M | $17.3M | $15.4M |
blank = series not published for this year; – = absent from that edition.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Family of Beyond Line-of-Sight Terminals
Activities funded in this program element continue to pay for AN/USQ-225 modernization and integration into multiple legacy systems, other ongoing NC3 acquisition programs, and future capabilities for the overall AF NC3 WS. The Family of Advanced Beyond Line-of-Sight Terminals (FAB-T) Command Post Terminals (CPT) program replaces legacy Milstar terminals and will provide Extremely High Frequency (EHF), protected high data rate communication for nuclear and conventional forces to include Presidential and National Voice Conferencing (PNVC). FAB-T CPT will provide this new, highly secure, state-of-the-art capability for Department of Defense (DoD) platforms to include strategic platforms and airborne/ground command posts via Milstar, Advanced EHF (AEHF), and Evolved Strategic SATCOM (ESS) satellite constellations. FAB-T CPTs will also support the critical command and control (C2) of the Milstar, AEHF, and ESS satellite constellations. In June 2014, the Department of the Air Force down-selected to Raytheon for production of FAB-T CPT. Production contract options to produce CPT terminals were exercised after a successful Milestone C decision was approved September 1, 2015. In FY 2019, the FAB-T Program Management Office executed the final Low Rate Initial Production (LRIP) procurement to complete the total of 84 LRIP CPTs on contract. In FY 2026, FAB-T CPT will continue to pursue activities that ensure FAB-T CPT terminal interoperability with the full AEHF satellite constellation. The Presidential and National Voice Conferencing (PNVC) Integrator project is a critical element of the Nuclear Command, Control, and Communications (NC3) System. PNVC integrator replaces the Survivable Emergency Conferencing Network (SECN) capability, and will provide anti-jam, anti-scintillation, survivable, and enduring voice communications via the AEHF, and ESS satellite constellations for national and strategic users. Equipment upgrades required for this system include the development and production of several new components by other organizations, including the Baseband Interface Group (BIG) and Multi-Stream Summing Device (MSD III) for airborne users and the Baseband Kit (BBK) / PNVC Equipment enclosure for mobile users. The PNVC Integrator is responsible for all program elements and funding, including those related to the Defense Information Systems Agency (DISA) and National Security Agency (NSA) components of the PNVC system, in accordance with the transfer directed in the FY 2018 National Defense Authorization Act, Sec. 1661. PNVC funds were transferred from DISA to the Department of the Air Force (DAF) beginning in FY 2021, and the PNVC Integrator will continue to procure remaining PNVC equipment until all fielding is complete. In October 2021, PNVC completed Milestone B/C. FAB-T CPT was reflected in previous Program Exhibits in the Prior Years through FY 2014 - 2020. PNVC was reflected in previous Program Exhibits in the Prior Years through FY 2015 - 2020. Funding for this exhibit is contained in PE 1203001SF.
Justification
Justification — Family of Beyond Line-of-Sight Terminals
In FY 2026, FAB-T CPT will continue activities that ensure CPT terminal interoperability with the full AEHF satellite constellation, deliver airborne terminals to aircraft depots, provide interim contractor support for the existing fielded terminals, operator training, and organic depot activation in preparation for long-term hardware, software, and crypto sustainment. In FY 2026, PNVC Integrator will continue to procure any remaining PNVC equipment required for fielding activities and provide support capability for fielded units including interim contractor support and depot activation activities. Activities may also include program office support, studies, technical analysis, prototyping, training, and mitigations to address Diminishing Manufacturing Sources and Material Shortages associated with production and fielding of the AEHF family of terminals. The FY 2026 request was reduced by $0.679 million for Advisory and Assistance Services (A&AS) to promote efficiencies and advance the policies of the Administration in alignment with EO 14222 "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative." The FY 2026 request was reduced by $0.050 million for Inflation Rate adjustments.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Procurement, Space Force | F | FY24 Actuals | $25.1M |
| Procurement, Space Force | F | FY25 Enacted | $17.3M |
| Procurement, Space Force | F | FY26 Disc. Request | $15.4M |
| Procurement, Space Force | F | FY26 Total | $15.4M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|
| Program Element | $25.1M | $17.3M | $15.4M | $15.4M |
Follow the dollar
Appropriation → program element → top high-confidence awards → recipient families → congressional districts.
Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →
The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
| Recipient | PIID | Confidence |
|---|---|---|
| RAYTHEON COMPANY | FA873520C0001 | high |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
17 mentions from the Senate LDA disclosure database.
ALERT Act (H.R.7613) Aviation Navigation data bases Safe Air on Airplanes Act (H.R.4994) Issues related to…
Issues related to classification of certain aerospace components for export licensing purposes Helicopter terrain…
Issues related to classification of certain aerospace components for export licensing purposes Helicopter terrain…
Issues Related to Beyond Visual Line of Sight rulemaking; Issues related to Section 2209 rulemaking; Issues related to…
Issues Related to Beyond Visual Line of Sight rulemaking; Issues related to Section 2209 rulemaking; Issues related to…
H.R. __ - Fixing Emergency Management for Americans Act (FEMA) Act of 2025; Issues Related to Beyond Visual Line of…
Issues related to classification of certain aerospace components for export licensing purposes Helicopter terrain…
Issues related to classification of certain aerospace components for export licensing purposes Helicopter terrain…
Issues related to classification of certain aerospace components for export licensing purposes Helicopter terrain…
Issues related to classification of certain aerospace components for export licensing purposes Aircraft and helicopter…
H.R. __ - Fixing Emergency Management for Americans Act (FEMA) Act of 2025 Issues Related to Beyond Visual Line of…
H.R. __ - Fixing Emergency Management for Americans Act (FEMA) Act of 2025; Issues Related to Beyond Visual Line of…
H.R. __ - Fixing Emergency Management for Americans Act (FEMA) Act of 2025 Issues Related to Beyond Visual Line of…
Issues related to classification of certain aerospace components for export licensing purposes Aircraft and helicopter…
Issues related to classification of certain aerospace components for export licensing purposes Aircraft and helicopter…
Issues related to classification of certain aerospace components for export licensing purposes Aircraft and helicopter…
Issues related to classification of certain aerospace components for export licensing purposes Aircraft and helicopter…
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Family of Beyond Line-of-Sight Terminals. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O1007
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O971
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O1023
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
FY2026 Space Force Procurement · www.saffm.hq.af.mil
PDF page 53