E-11 BACN/HAG

Air ForceProcurementReconciledBLIE011A0
What it is
E-11 BACN/HAG (E011A0) is an Air Force procurement line funded in the Aircraft Procurement, Air Force account.
What changed
-$47.3M FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$56.9MP-1 TOA · PB2026
FY25 Enacted
$76.1MP-1 TOA · PB2026
FY26 Request
$28.8MP-1 TOA · PB2026
FY25→26 Change
-$47.3MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $56.9MFY25: $76.1MFY26: $28.8MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$56.9M
FY25$76.1M
FY26$28.8M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$64.2M$20.6M$56.9M
Enacted–$20.6M$58.9M$76.1M
Request––$58.9M$82.9M$28.8M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $58.9M for FY2024; the PB2026 book reported $56.9M as actual total obligation authority — $2.00M below the request. 56.9 − 58.9 = -2.0 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — E-11 BACN/HAG

Battlefield Airborne Communication Node (BACN) provides a Combatant Commander (CCDR) flexible, long-endurance, responsive airborne communications capability. BACN provides a dedicated airborne capability to conduct voice bridging/translation, Tactical Data Link (TDL) gateway, and TDL relay functions for beyond-line-of-sight (BLOS) data communications. Funding for this exhibit contained in PE 0207238F. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense mission, domestic emergency responses, and providing military support to civilian authorities.

Justification

Justification — E-11 BACN/HAG

BACN includes the payload, its host platforms, and associated ground systems. As mandates/ requirements emerge for new hardware and software capabilities that improve system performance, external time references, interoperability and open mission system technologies, BACN will host the integration of these and future emerging technologies, such as, but not limited to, Ka-Band Satellite Communications (SATCOM), Supplemental Type Certs (STC), and M-Code Military Global Positioning System (GPS). Funding supports program support costs including but not limited to, A&AS and assessments. The FY 2026 request was reduced by $0 for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative. Funding will be used to address Diminishing Manufacturing Sources (DMS) issues and long lead procurement. This may include modifications required for enhanced capability and improvements to system reliability and maintainability. Safety of flight considerations, including but not limited to, performance, aircraft structural integrity, availability, and continuity of service requirements for long range reference, local area reference, and landing/ terminal reference. Funding will also be used to procure a flight simulator to support aircrew currency, mission profile training, and reduce reliance on industry-provided platform training. BACN aircraft platforms need to meet standardized avionics baseline and the production of all Supplemental Type Certificates of the most up to date configurations of the fleet. This effort includes Military GPS, Advanced Position, Navigation, and Timing (PNT) systems, communication systems/capabilities and any additional mandates levied on the BACN system and platforms. Funding will also be used for fulfillment of requirements in support of alteration, conversion, and modernization of the BACN fleet. FY2026 funding will procure installation kits for both M-Code Military GPS and Multifunctional Information Distribution System Joint Tactical Radio System (MIDS JTRS) Block Upgrade 3 (BU3). M-Code will provide significantly enhanced resilience against jamming and interference, reducing risks and ensuring continued aircraft and data link operational capability. This transition is mandated to replace the vulnerable P/Y code with the more secure M-Code system. By enabling successful mission accomplishment even in contested electromagnetic environments, M-Code allows for the reliable distribution of critical data under jamming conditions. This effort encompasses software development, integration, and deployment across all seven BACN aircraft. Each aircraft requires two M-Code units - one in the cockpit and one within the payload. These units comprise an Embedded GPS Inertial Navigation (EGI), an Antenna Electronics Unit (AEU), and a Controlled Reception Pattern Antenna (CRPA). Six M-Code units will be utilized during the Research and Development phase—two for the Global Express, two for the Global 6000, and two for additional test articles. The procurement phase will ultimately acquire 20 additional M-Code units: two for each of the remaining five aircraft, plus ten spares, resulting in a total of 26 EGIs, 26 AEUs, and 16 CRPAs. MIDS JTRS BU3 is an ongoing effort to incorporate mandated Link 16 modernization that modifies the current BACN weapon system's payload and software with MIDS JTRS BU3 terminals. This effort is driven by mandates to ensure the BACN fleet is at the forefront of Link 16 advancements. The BU3 upgrade enhances data exchange speeds, improves network performance, and enables the handling of more complex tactical information, such as advanced targeting data and real-time situational awareness. The first batch of terminals have been submitted for upgrade and there are five batches remaining. Batch numbers are as follows (13, 10, 10, 10, 11, 7) for a total of 61 terminals. Decrease from FY 2025 to FY 2026 is due to procurement of one flight simulator in FY 2025, with no requirement for further quantities in FY26.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Aircraft Procurement, Air ForceFFY24 Actuals$56.9M
Aircraft Procurement, Air ForceFFY25 Enacted$76.1M
Aircraft Procurement, Air ForceFFY26 Disc. Request$28.8M
Aircraft Procurement, Air ForceFFY26 Total$28.8M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$137.6M$56.9M$76.1M$28.8M$28.8M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not E-11 BACN/HAG. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.