CV-22 Post Production Support

Air ForceProcurementReconciledBLIC0V220
What it is
CV-22 Post Production Support (C0V220) is an Air Force procurement line funded in the Aircraft Procurement, Air Force account.
What changed
-$4.94M FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$0J-book detail · PB2026
FY25 Enacted
$12.0MP-1 TOA · PB2026
FY26 Request
$7.08MP-1 TOA · PB2026
100.0% reconciliation

$7.08M one-time reconciliation. Discretionary change vs FY2025 enacted: -100.0%.

FY25→26 Change
-$4.94MP-1 TOA · PB2026

Two official figures, one label— reconciled below

Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows that the R-2/P-40 J-book program line excludes — advance procurement in an ordinary year, and in FY2026 the one-time reconciliation appropriation as well. Each row below names the one it is. How the two bases relate →

FY26 Request · $7.08M TOA − $0 J-book line (a zero-dollar XML line) = 7.08M (7.1 − 0.0 = 7.1) — $7.08M of one-time FY2026 reconciliation money accounts for this gap — not advance procurement

Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.

Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $0FY25: $12.0MFY26: $7.08MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$0J-book detail · PB2026
FY25$12.0MP-1 TOA · PB2026
FY26$7.08MP-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

2 fiscal years of this program as published (FY2025–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line is too short to show a direction. The grid below is the same data as text, one cited figure per cell.
2 fiscal years of this program as published (FY2025–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line is too short to show a direction. The grid below is the same data as text, one cited figure per cell.FY2025 enacted — PB2026 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY25FY26
Enacted$12.0M
Request$12.0M$7.08M

blank = series not published for this year; – = absent from that edition.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — CV-22 Post Production Support

The CV-22 is the US Air Force Special Operations Forces (SOF) variant of the joint multi-mission V-22 tilt-rotor aircraft. The aircraft provides long-range infiltration, exfiltration, personnel recovery, and re-supply of SOF in politically sensitive and hostile/denied areas. The Navy is the lead service for the joint V-22 program and has overall responsibility for managing all V-22 variants, including the Air Force CV-22 variant. CV-22 post production support funding enables the seamless transition from the production phase of the program to the operations and support (O&S) phase. Post Production support funding is required to procure support equipment and integrated logistics support (ILS) requirements affiliated with sustainment of CV-22 modifications to improve operational effectiveness, readiness, and aircraft availability of the worldwide CV-22 fleet. Funding for this exhibit contained in PE 0401318F. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues.

Justification

Justification — CV-22 Post Production Support

No FY 2026 discretionary funding requested. The FY 2026 request for CV-22 includes $0 thousand of discretionary and $7,085 thousand of mandatory (reconciliation) for a total of $7,085 thousand. The mandatory funds Peculiar Support Equipment, Simulator Support, and Production Integrated Logistic Support. Further information for this reconciliation request is provided in Section 20007 (Air Superiority) of the Reconciliation Exhibit.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Aircraft Procurement, Air ForceFFY25 Enacted$12.0M
Aircraft Procurement, Air ForceFFY26 Reconciliation$7.08M
Aircraft Procurement, Air ForceFFY26 Total$7.08M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$0$12.0M$0$0

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not CV-22 Post Production Support. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.