Printed from https://fiscalreceipts.com/program/C0V220/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
CV-22 Post Production Support
Budget figures
$7.08M one-time reconciliation. Discretionary change vs FY2025 enacted: -100.0%.
Two official figures, one label— reconciled below
Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows that the R-2/P-40 J-book program line excludes — advance procurement in an ordinary year, and in FY2026 the one-time reconciliation appropriation as well. Each row below names the one it is. How the two bases relate →
FY26 Request · $7.08M TOA − $0 J-book line (a zero-dollar XML line) = 7.08M (7.1 − 0.0 = 7.1) — $7.08M of one-time FY2026 reconciliation money accounts for this gap — not advance procurement
Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $0J-book detail · PB2026 |
| FY25 | $12.0MP-1 TOA · PB2026 |
| FY26 | $7.08MP-1 TOA · PB2026 |
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY25 | FY26 |
|---|---|---|
| Enacted | $12.0M | |
| Request | $12.0M | $7.08M |
blank = series not published for this year; – = absent from that edition.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — CV-22 Post Production Support
The CV-22 is the US Air Force Special Operations Forces (SOF) variant of the joint multi-mission V-22 tilt-rotor aircraft. The aircraft provides long-range infiltration, exfiltration, personnel recovery, and re-supply of SOF in politically sensitive and hostile/denied areas. The Navy is the lead service for the joint V-22 program and has overall responsibility for managing all V-22 variants, including the Air Force CV-22 variant. CV-22 post production support funding enables the seamless transition from the production phase of the program to the operations and support (O&S) phase. Post Production support funding is required to procure support equipment and integrated logistics support (ILS) requirements affiliated with sustainment of CV-22 modifications to improve operational effectiveness, readiness, and aircraft availability of the worldwide CV-22 fleet. Funding for this exhibit contained in PE 0401318F. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues.
Justification
Justification — CV-22 Post Production Support
No FY 2026 discretionary funding requested. The FY 2026 request for CV-22 includes $0 thousand of discretionary and $7,085 thousand of mandatory (reconciliation) for a total of $7,085 thousand. The mandatory funds Peculiar Support Equipment, Simulator Support, and Production Integrated Logistic Support. Further information for this reconciliation request is provided in Section 20007 (Air Superiority) of the Reconciliation Exhibit.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Aircraft Procurement, Air Force | F | FY25 Enacted | $12.0M |
| Aircraft Procurement, Air Force | F | FY26 Reconciliation | $7.08M |
| Aircraft Procurement, Air Force | F | FY26 Total | $7.08M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|
| Program Element | $0 | $12.0M | $0 | $0 |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not CV-22 Post Production Support. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · Q920
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · S940
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
FY2026 Air Force Aircraft Procurement, Vol. I · www.saffm.hq.af.mil
PDF page 229