CV-22 Post Production Support — a procurement program run by Air Force.
What changed
No FY25→26 comparison — trajectory data incomplete for this line.
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$0
FY25 Total
FY26 Request
$7.08M
FY25→26 Change

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory

Insufficient trajectory data for sparkline (only FY26 available).

Decade view — each figure cites its own President's Budget edition
FY2025 enacted — PB2026 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY25FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY25FY26
Enacted$12.0M
Request$12.0M$7.08M

blank = series not published for this year; – = absent from that edition.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description CV-22 Post Production Support

The CV-22 is the US Air Force Special Operations Forces (SOF) variant of the joint multi-mission V-22 tilt-rotor aircraft. The aircraft provides long-range infiltration, exfiltration, personnel recovery, and re-supply of SOF in politically sensitive and hostile/denied areas. The Navy is the lead service for the joint V-22 program and has overall responsibility for managing all V-22 variants, including the Air Force CV-22 variant. CV-22 post production support funding enables the seamless transition from the production phase of the program to the operations and support (O&S) phase. Post Production support funding is required to procure support equipment and integrated logistics support (ILS) requirements affiliated with sustainment of CV-22 modifications to improve operational effectiveness, readiness, and aircraft availability of the worldwide CV-22 fleet. Funding for this exhibit contained in PE 0401318F. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues.

Justification

Justification CV-22 Post Production Support

No FY 2026 discretionary funding requested. The FY 2026 request for CV-22 includes $0 thousand of discretionary and $7,085 thousand of mandatory (reconciliation) for a total of $7,085 thousand. The mandatory funds Peculiar Support Equipment, Simulator Support, and Production Integrated Logistic Support. Further information for this reconciliation request is provided in Section 20007 (Air Superiority) of the Reconciliation Exhibit.

Budget Line Items(workbook-cited)

Exhibit P-1

AccountOrgTypeAmount
Aircraft Procurement, Air ForceFFY25 Enacted$12.0M
Aircraft Procurement, Air ForceFFY26 Reconciliation$7.08M
Aircraft Procurement, Air ForceFFY26 Total$7.08M

Budget Details(R-2/P-40 facts)

ProjectFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$0$12.0M$0$0

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →