Printed from https://fiscalreceipts.com/program/B00200/ — data as of July 28, 2026. Every figure is citation-backed; see the page online for per-number provenance.
B-2A
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
- FY24
- $91.6M
- FY26
- $76.9M
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $24.9M | $74.7M | $91.6M | ||
| Enacted | – | $91.0M | $109.8M | $62.6M | |
| Request | – | – | $109.8M | $65.8M | $76.9M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $109.8M for FY2024; the PB2026 book reports $91.6M actually spent — $18.2M below the request.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — B-2A
This Interim Contractor Support (ICS) in P-1 line provides maintenance and repair capability for depot-level repairs for the Common VLF/LV Receiver (CVR) Increment 1, to meet Air Force Global Strike Command (AFGSC) operational requirements for the B-2 weapon system. The ICS program is an on-condition and limited overhaul repair capability repairing Line Replaceable Units (LRUs) and Shop Replaceable Units (SRUs) associated with CVR Increment 1. ICS also provides travel support and interim repair to new or modified components stemming from the B-2 CVR Increment 1 program until a permanent source of repair has been achieved either organically or through Contractor Depot Maintenance (CDM). ICS will continue to provide interim maintenance and repair capability to B-2 CVR Increment 1 LRUs/SRUs until either an organic repair capability or contractor repair capability is established.
Description — B-2A
The B-2 is a multi-engine, long range bomber incorporating low-observable ('stealth') technology that enables the B-2 to penetrate enemy air defenses and strike high-value targets. Specific modifications, budgeted and programmed, are below. Funding for the exhibit is primarily in PE 0101127F (B-2 Squadrons). Some trainer efforts are funded in PE 0809731F (Training Support to Units), and other efforts are funded under PE 0207446F (Bomber Tactical Data Link). Funds may be used to resolve emerging safety of flight and diminishing manufacturing sources issues, accommodate technology insertion and fulfill FAA or other mandates necessary to ensure continued aircrew safety and mission effectiveness.
Justification
Justification — B-2A
See individual P-3A's for FY26 PB Budget justification
Justification — B-2A
No FY26 funding requested.
Budget Line Items(workbook-cited)
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Aircraft Procurement, Air Force | F | FY24 Actuals | $1.84M |
| Aircraft Procurement, Air Force | F | FY24 Actuals | $89.7M |
| Aircraft Procurement, Air Force | F | FY25 Enacted | $60.7M |
| Aircraft Procurement, Air Force | F | FY25 Enacted | $1.89M |
| Aircraft Procurement, Air Force | F | FY26 Disc. Request | $76.9M |
| Aircraft Procurement, Air Force | F | FY26 Total | $76.9M |
Budget Details(R-2/P-40 facts)
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $305.1M | $89.7M | $60.7M | $76.9M | $76.9M |
| Program Element | — | $1.84M | $1.89M | $0 | $0 |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →