Printed from https://fiscalreceipts.com/program/823230/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Security And Tactical Vehicles
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $390.0K |
| FY25 | $438.0K |
| FY26 | $129.0K |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $6.09M | $382.0K | $390.0K | ||
| Enacted | – | $382.0K | $390.0K | $438.0K | |
| Request | – | – | $390.0K | $438.0K | $129.0K |
blank = series not published for this year; – = absent from that edition.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Security And Tactical Vehicles
Funding provides for a variety of security and tactical vehicles essential to strategic military operations. This program previously procured the standard diesel-powered High Mobility Multi-Purpose Wheeled Vehicle (HMMWV) and all configurations used by the Air Force and cargo trailers. M1101 and M1102 light tactical trailers: The M1101 and M1102 are a single axle, two wheel trailer designed to be towed by a HMMWV. The trailers have the same tires, wheels, and track width as the HMMWV. The only difference between the M1101 and the M1102 trailer is the model information and payload capacity. The trailers have various applications and provide the forces with a light, nimble, rugged trailer built primarily for hauling cargo. FIAR Compliance Statement: - This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. **Funding for this exhibit contained in PEs: 0207227F, 0502831F, and 0202834F.
Justification
Justification — Security And Tactical Vehicles
- BASIS FOR FY 2026 BUDGET REQUEST: FY2026 procurement dollars in the amount of 0.129M will procure, but not be limited to, 3 vehicles in support of installation and unit mission requirements for Air Force personnel. Quantities are based on current requirements provided by the 441 Vehicle Support Chain Operations Squadron (VSCOS) IAW the process outlined in AFI 24-302, Vehicle Management. The requirements are generated from the priority buy model that is used to support the Planning, Programming, Budgeting and Execution (PPBE) process. The model calculates vehicle requirements by fund year by BPAC using end of life projections based on depreciation and service life of the vehicle, cumulative sustainment cost and mission priority. Quantities reflected on the PDOCs show current requirements for each year supporting Active Duty, Air Force Reserve Center (AFRC), Air National Guard (ANG), Rapid Airfield Damage Repair (RADR), Regional Base Cluster Prepositioning Kits (RBCP) for PACOM, and other initiatives as they arise. As the model applies the life expectancy/sustainment cost/mission priority logic in generating requirements, there can be gaps in individual vehicle type (NSN) requirements from year-to-year. Unit Cost is subject to change from year-to-year based on buy quantities, CONUS/OCONUS locations, inflation and additional requirements (options required by users). Examples of options include, but are not limited to, specialized trailer towing packages, export (non-Ultra Low Sulfur Diesel) engines, and mission specific specialized attachments for construction vehicles. Unit cost is also subject to change based on fluctuations in contract pricing. Subcategories regrouped to provide more accurate average costs. FY26 request was reduced by .010M for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, implementing the President's Department of Government Efficiency Cost Efficiency Initiatives. Increase/Decrease narrative: The Cargo Trailer reflects a 56% increase in unit cost. Industry standards such as inflation, cost of building materials (i.e. chassis, electronic components) and supply shortages are seen across the board for BPAC 823230 and all acquisition efforts. In addition, contracts that were negotiated at a certain price point are expiring in the next couple of years. The prices associated with the replacement contracts are expected to increase.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Air Force | F | FY24 Actuals | $390.0K |
| Other Procurement, Air Force | F | FY25 Enacted | $438.0K |
| Other Procurement, Air Force | F | FY26 Disc. Request | $129.0K |
| Other Procurement, Air Force | F | FY26 Total | $129.0K |
Exhibit P-1R
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Air Force | F | FY24 Actuals | $24.0K |
| Other Procurement, Air Force | F | FY25 Enacted | $121.0K |
| Other Procurement, Air Force | F | FY 2026 request | $128.0K |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|
| Program Element | $390.0K | $438.0K | $129.0K | $129.0K |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Security And Tactical Vehicles. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O1037
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O999
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O1054
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
FY2026 Department of Defense Budget: Procurement Programs (P-1R) · comptroller.war.gov
Exhibit P-1R · N265
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1R_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
FY2026 Air Force Other Procurement · www.saffm.hq.af.mil
PDF page 67