Vehicles and Support Equipment - General

FRDT&EPartial Reconciliation0202834F
What it is
Vehicles and Support Equipment - General — a research & development program run by Air Force.
What changed
-$5.35M FY25→26
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$9.47M
FY25 Total
$6.10M
FY26 Request
$744.0K
FY25→26 Change
-$5.35M

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
FY24: $9.47MFY25: $6.10MFY26: $744.0KFY24FY25FY26
FY24
$9.47M
FY25
$6.10M
FY26
$744.0K
Decade view — each figure cites its own President's Budget edition
FY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY20FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY20FY21FY22FY23FY24FY25FY26
Actuals$0$0$2.91M$13.7M$9.47M
Enacted$0$5.89M$14.5M$15.5M$6.10M
Request$5.89M$14.5M$15.5M$6.10M$744.0K

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $15.5M for FY2024; the PB2026 book reports $9.47M actually spent — $6.02M below the request.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission AVIATION SUPPORT EQUIPMENT MODERNIZATION

Aviation Support Equipment Modernization provides funding for the modernization of organizational and intermediate level support equipment for out-of-production and emerging aircraft, munitions and external stowage to maximize commonality of equipment, improve aircraft readiness/availability and to reduce life cycle sustainment costs. These items, common (used on more than one weapon system) and peculiar (unique to one weapon system), directly support aircraft maintenance, servicing, and sortie generation requirements. To support aircraft generation requirements, support equipment may be studied, reviewed, modified and/or re-developed in order to maintain operational readiness. Examples of equipment under review and/or modernization includes, but not limited to, power generation, heating, ventilation, and air conditioning (HVAC), munition trailers/accessories, munition lifts/accessories, tow vehicles, munition test/maintenance stands, hydraulic equipment, and engine test stands. Any identified capability gaps may result in the design of a new system. Additionally, modernization is a continuous, deliberate effort and is key to complete lifecycle management. This program element also includes program administrative cost for the Support Equipment and Vehicles program office and funds the cost of studies and research to support the aviation support equipment fleet. This program element may include necessary civilian pay expenses required to manage, execute, and deliver Aviation Support Modernization capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program element 0605827, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, 0606398F. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year.

Justification

Accomplishments & Planned Programs (3)

Tow Systems Modernization

New Common Tow Systems Modernization across the aircraft fleet. RDT&E efforts support development, testing, and producibility of Tow Bar and Tow Systems.

Munitions Materiel Handling Equipment (MMHE) Modernization

Ensures aerial lift trucks (jammers) and munitions trailers continue to safely meet lift & carry requirements as well as fill capability gaps resulting from new/emerging weapons and aircraft stowage, and new force employment/ basing strategies. RDT&E supports emerging opportunities, such as but not limited to, development of semi-autonomous loading systems, alternative electrical power/drive systems and exploring & implementing a Family-of-Jammers concept to address low observable aircraft loading challenges, agile operations in contested environment, and heavy-weight lift capabilities resulting from emerging weapons. Equipment may be studied, reviewed, modified and/or re-developed in order to maintain operational readiness

Powered AGE Systems Modernization

Ensures powered aerospace ground equipment (AGE) remains available and suitable to meet the requirements of legacy and 5th generation aircraft and force employment/basing strategies while providing reduced lifecycle sustainment costs, reduce operational footprint in support of agile combat operations, and providing improved user safety by reducing system emissions and noise. Powered AGE includes hydraulic, generators, lighting, heating/air conditioning, compressors/bleed-air, aerial stores lift trucks and other electrically driven systems used in and around the flight line for the generation and maintenance of aircraft.

Budget Line Items(workbook-cited)

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, Air ForceFFY24 Actuals$9.47M
Research, Development, Test and Evaluation, Air ForceFFY25 Enacted$6.10M
Research, Development, Test and Evaluation, Air ForceFFY25 Total$6.10M
Research, Development, Test and Evaluation, Air ForceFFY26 Disc. Request$744.0K
Research, Development, Test and Evaluation, Air ForceFFY26 Total$744.0K

Budget Details(R-2/P-40 facts)

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$0$9.47M$6.10M$744.0K$744.0K
672800: AVIATION SUPPORT EQUIPMENT MODERNIZATION$0$9.47M$6.10M$744.0K$744.0K

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →