Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $165.2M |
| FY25 | $141.0M |
| FY26 | $122.4M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $73.0M | $92.1M | $165.2M | ||
| Enacted | – | $92.1M | $114.9M | $141.0M | |
| Request | – | – | $114.9M | $141.0M | $122.4M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $114.9M for FY2024; the PB2026 book reported $165.2M as actual total obligation authority — $50.3M above the request. 165.2 − 114.9 = 50.3 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Rolling Airframe Missile (RAM)
Rolling Airframe Missile (RAM) is a high firepower missile system used to defeat Anti-Ship Cruise Missiles (ASCMs), as well as other airborne threats. RAM is a surface-to-air missile with passive dual-mode radio frequency/infrared (RF/IR) guidance and an active-optical proximity and contact fuse. RAM has minimal shipboard control systems and is autonomous after launch. The RAM Block 1 incorporated "all-the-way-homing" to improve performance against evolving passive and active ASCMs. The RAM Block 2 provides increased kinematic capability against highly maneuvering threats and improved RF detection against low probability of intercept threats. The RAM missile is fired from a RAM Guided Missile Launching System (GMLS) (MK-49), which holds 21 RAM rounds. RAM is also fired from the Close-In Weapon System (CIWS) SeaRAM Anti-Ship Missile Defense System (MK-15 MOD 31-33) which holds 11 rounds. Cooperative Agreement: RAM is a cooperative program with the Federal Republic of Germany. The U.S. and Federal Republic of Germany cooperatively produce Block 2 missiles, launchers, and Ordnance Alterations (ORDALTs). The Block 2 production Memorandum of Understanding (MOU) was signed on 19 March 2013. Amendment 2 to the Block 2 Memorandum of Understanding (MOU) was signed September 2022. FY 2024 includes supplemental funding from Israel Security Supplemental Appropriations Act, 2024 (Division A of Public Law 118-50). DON has received $50.235 million for the procurement of 60 RAM missiles for the replacement of Navy stock. This results in an increase FY 2024 quantities from 120 to 180.
Justification
Justification — Rolling Airframe Missile (RAM)
In FY 2026, the program plans to procure 123 RAM missiles, 5 Block 1 to 2B ORDALTs and 70 Block 2 to 2A ORDALTs. The funding decrease from FY 2025 to FY 2026 corresponds to the reduction in missile procurements from 148 to 123.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Weapons Procurement, Navy | N | FY24 Actuals | $165.2M |
| Weapons Procurement, Navy | N | FY25 Enacted | $141.0M |
| Weapons Procurement, Navy | N | FY26 Disc. Request | $122.4M |
| Weapons Procurement, Navy | N | FY26 Total | $122.4M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $1.79B | $165.2M | $141.0M | $122.4M | $122.4M |
Follow the dollar
Appropriation → program element → top high-confidence awards → recipient families → congressional districts.
Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →
The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.
| District | Program obligations |
|---|---|
| AZ-07 | $1.46B |
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
| Recipient | PIID | Confidence |
|---|---|---|
| RAM-SYSTEM GMBH | N0002417C5430 | high |
| RAYTHEON COMPANY | N0002416C5400 | high |
| RAYTHEON COMPANY | N0002418C5425 | high |
| RAYTHEON COMPANY | N0002420C5400 | high |
| RAYTHEON COMPANY | N0002422C5400 | high |
Contractor concentration
High-confidence award links only, pooled across ingested years. The index uses positive obligations; program obligations are net of deobligations. The figures over every published link, including medium-confidence ones, are in the downloadable warehouse, not on this page — why.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Ram. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O407
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O415
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O418
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.