Rapid Resilient Command and Control (R2C2)

Air ForceRDT&EReconciledPE1206772SF
What it is
Rapid Resilient Command and Control (R2C2) (1206772SF) is an Air Force research & development line funded in the Research, Development, Test, and Evaluation, Space Force account. Its J-book detail breaks the line into 1 project.
What changed
No FY25→26 comparison — endpoints unavailable or on different bases.
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$0J-book detail · PB2026
FY25 Enacted
$0J-book detail · PB2026
FY26 Request
$106.2MR-1 TOA · PB2026
FY25→26 Change
No comparison: endpoints unavailable or on different bases
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $0FY25: $0FY26: $106.2MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$0J-book detail · PB2026
FY25$0J-book detail · PB2026
FY26$106.2MR-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

One fiscal year of this program as published: a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line is too short to show a direction. The grid below is the same data as text, one cited figure per cell.
One fiscal year of this program as published: a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line is too short to show a direction. The grid below is the same data as text, one cited figure per cell.FY2026 request — PB2026 editionFY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY26
Request$106.2M

blank = series not published for this year; – = absent from that edition.

Program lineage

Predecessors (funding flowed in)

  • realigned from · per FY2026 J-book
    show sentence
    “In FY 2026, Program Element (PE) 1206770SF, Enterprise Ground Services (EGS), efforts transferred to PE 1206772SF, Rapid Resilient Command and Control (R2C2), to consolidate functions for efficiency and improve transparency.”
This program
1206772SF — Rapid Resilient Command and Control (R2C2)

Family Funding Line

Funding chain: 1206770SF1206772SF — Enterprise Ground Services

  • FY2021$116.8M
  • FY2022$191.7M
  • FY2023$123.6M
  • FY2024$155.8M
  • FY2025$111.3M
  • FY2026$106.2M

See this family in the lineage map →

Description

Mission — Rapid Resilient Command and Control (R2C2)

The Assistant Secretary of the Air Force for Space Acquisition and Integration directed the formation of a Combined Program Office (CPO) by merging Enterprise Ground Services (EGS) from Space Systems Command (SSC) and Ground Command, Control, and Communications (GC3) from the Space Rapid Capabilities Office (Space RCO). The CPO is called the Rapid Resilient Command and Control (R2C2) CPO and utilizes the Space RCO acquisition authorities under the Space RCO Program Executive Officer to execute funding in the EGS and GC3 program elements to develop an extensible, scalable, modular ground segment solution capable of supporting protect and defend missions of the United States Space Force. Combined EGS and GC3 funding will be used wholly and directly to support CPO activities. R2C2 will continue development and integration of the satellite operations ground segment solution (SatOps) to support the protect and defend mission set, including, but not limited to, capabilities and services needed to perform mission control. In FY 2026, Program Element (PE) 1206770SF, Enterprise Ground Services (EGS), efforts transferred to PE 1206772SF, Rapid Resilient Command and Control (R2C2), to consolidate functions for efficiency and improve transparency. There was a one-time technical adjustment in FY 2025 approved by Congress that moved EGS funding from PE 1206770SF to PE 1206857SF, Space Rapid Capabilities Office, which improved funding execution in FY 2025. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 1206392SF and 1206398SF. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year.

Mission — Rapid Resilient Command and Control (R2C2)

The Assistant Secretary of the Air Force for Space Acquisition and Integration directed the formation of a Combined Program Office (CPO) by merging Enterprise Ground Services (EGS) from Space Systems Command (SSC) and Ground Command, Control, and Communications (GC3) from the Space Rapid Capabilities Office (Space RCO). The CPO is called the Rapid Resilient Command and Control (R2C2) CPO and utilizes the Space RCO acquisition authorities under the Space RCO Program Executive Officer to execute funding in the EGS and GC3 program elements to develop an extensible, scalable, modular ground segment solution capable of supporting protect and defend missions of the United States Space Force. Combined EGS and GC3 funding will be used wholly and directly to support CPO activities. R2C2 will continue development and integration of the satellite operations ground segment solution (SatOps) to support the protect and defend mission set, including, but not limited to, capabilities and services needed to perform mission control. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 1206392SF and 1206398SF.

Justification

Accomplishments & Planned Programs (2)

Rapid Resilient Command and Control (R2C2) Satellite Command and Control Services

Develop and integrate common satellite operations ground segment solution (SatOps) command and control (C2) services in cloud environments. Refine standards and interfaces, develop, and implement cybersecurity and cryptography requirements, develop training, address Zero Trust, mature antenna network services and connectivity, and integrate capabilities into the enterprise. Support mission partner demonstrations, integration, and test of mission-unique software.

Rapid Resilient Command and Control (R2C2) Cloud Infrastructure and Platform/Antenna Services

Maintain hardware and software baselines, update software licenses, integrate cybersecurity, and provide helpdesk operations with associated training, to include support for developing software for cloud-hosted and antenna scheduling and command and control (C2).

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test, and Evaluation, Space ForceFFY26 Disc. Request$106.2M
Research, Development, Test, and Evaluation, Space ForceFFY26 Total$106.2M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$0$0$0$106.2M$106.2M
67A001: Rapid Resilient Command and Control (R2C2)$0$0$0$106.2M$106.2M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Rapid Resilient Command and Control (R2C2). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.