Protected Tactical Service (PTS)
Watch this program
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $210.7M |
| FY25 | $420.0M |
| FY26 | $571.9M |
All series figures: R-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|
| Actuals | $0 | $0 | $193.3M | $221.4M | $238.4M | $210.7M | ||
| Enacted | – | $0 | $200.2M | $229.3M | $252.1M | $360.1M | $420.0M | |
| Request | – | – | $205.2M | $243.3M | $294.8M | $360.1M | $597.0M | $571.9M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $360.1M for FY2024; the PB2026 book reported $210.7M as actual total obligation authority — $149.4M below the request. 210.7 − 360.1 = -149.4 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Protected Tactical Service (PTS)
The global threat of electronic warfare attacks against space systems will expand in the coming years in both number and types of weapons. Threat development will very likely focus on jamming capabilities against dedicated military satellite communications (SATCOM). To address this critical threat, and in pursuit of more precise solutions for disaggregated strategic and tactical SATCOM, U.S Strategic Command (USSTRATCOM) and Air Force Space Command (AFSPC) initiated the tactical SATCOM family-of-systems. This integrated approach includes the Protected Tactical Satellite Communications (PTS) and Protected Tactical Enterprise Service (PTES) programs to mitigate adversarial jamming effects by using the Protected Tactical Waveform (PTW). The PTS program is the disaggregated tactical communications follow-on to the Advanced Extremely High Frequency (AEHF) program. The United States Space Force (USSF) is developing the PTS system to provide tactical users increased protection with worldwide, beyond-line-of-sight, Anti-Jam (AJ), low-probability-of-intercept communications in benign and highly-contested anti-access/area denial environments utilizing the PTW. The PTS system's on-board payload/signal processing, antenna design, and advanced beam-forming using a distributed, diversified, and agile constellation of hostable payloads and high capacity free-flyers enables reliable tactical SATCOM within close proximities to adversarial jammers. The system also employs interfaces consistent with USSF's on-going resilience initiatives enhancing mission assurance and interoperability. The program's modular, flexible, scalable, and protected tactical payload constellation architecture will increase resiliency through distribution across a larger number of space platforms (e.g., hostable, free-flyer, international partnerships). The PTES program (PE 1206760SF, Project 643726) establishes the ground infrastructure for PTS, which operationalizes the PTW. For the initial PTS phase, USSF is utilizing FY 2016 National Defense Authorization Act (NDAA), Middle Tier of Acquisition (MTA) for Rapid Prototyping (RP) authority and Section 815, Other Transaction Authority (OTA), to achieve an affordable, rapid, operational capability for the tactical warfighter. This strategy employs rapid payload development to progressively and incrementally deploy prototypes with residual capabilities demonstrated in an operational environment. These prototyping payloads (PTS-P) demonstrate innovative AJ technologies with modular and scalable payloads to meet validated military needs for protected tactical communications. This includes technical baseline development, systems engineering trade analyses, internal/external system integration and development, candidate system architecture evaluations, risk reduction demonstrations, prototyping concepts development, system testing, and enabling technologies maturation. The PTS-Resilient (PTS-R) project will follow the PTS-P prototyping activity to develop purpose-built "hub in space” satellites with full signal processing and switching capability that allows direct connectivity between users. On June 13th 2024, the Milestone Decision Authority has designated PTS-R as an ACAT I, pre-Milestone B program in the Technology Maturation and Risk Reduction (TMRR) acquisition phase. The PTS-P and PTS-R Phases include a Space Segment, Ground Segment, and Gateway Segment. For the Space Segment, the USSF strategy utilizes a payload-centric focus to enable an affordable, resilient space architecture. This enables hosting and rideshare opportunities with other US government, commercial, International Partner (IP) satellites or integration onto a commodity satellite bus. For the Ground Segment, PTS develops satellite command and control (C2) and leverages the Protected Tactical Enterprise Service (PTES) activity for mission and key management planning. The PTS Gateway Segment enables tactical warfighters reach back to global DoD Information Network. The PTS user Terminal Segment, not included in this PTS acquisition, will be procured by the military services utilizing low-cost Protected Tactical Waveform (PTW) modem upgrades enabled by the Air Force - Army Anti-Jam Modem (A3M) ACAT III program and the Navy Wideband Anti-Jam Modem System (WAMS) technology demonstration program. PTS also develops the National Security Agency (NSA)-certified and space-flight qualified production-ready Space Hub End Cryptographic Unit (ECU). Starting the ECU as a single, early risk reduction effort targets a high-risk area of the PTS development and enables PTS program success. In CY 2022 the Space Warfighting Analysis Center (SWAC) identified gaps in protected SATCOM capabilities relative to existing and planned capabilities against current and predicted user needs, with consideration of current and emerging challenges to both operating environments and system deployment. SWAC developed a Force Design (FD) to address these gaps, realigning capabilities and disaggregating mission sets. Protected Tactical SATCOM - Global (PTS-G) is a key and enabling capability of the USSF FD that bridges the gap between the more focused capabilities provided by PTS-R, and the broadly-available but also the lower assured access capabilities provided by existing / emerging MILSATCOM and commercial services. PTS-G also augments current and future warfighter capability with increased global capacity. PTS-G is a moderate degree of assured access communications across military Ka-band and X-band using a disaggregated and proliferated sets of lower-complexity satellites. Space Systems Command (SSC) will develop the PTS-G space and ground systems to provide worldwide assured-access communications for tactical warfighters. PTS-G will consist of two types of space vehicles (PTS-G-Ka and PTS-G-X), and ground infrastructure (system controller/hub with gateways), and will connect to existing Protected Tactical SATCOM Family of Systems ground infrastructure (mission management system and cryptographic key management system) developed under the PTES program. PTS-G will consist of multiple satellites that can provide either X-band or mil Ka-band transponded capability while also supporting the utilization of the PTW Waveform. PTW modems for user terminals will be acquired by each Service and by international partners. Initially, PTS-G will provide capabilities in select regions. PTS-G will target a solution that can provide worldwide coverage. PTS-G will be interoperable with the PTES program to perform management and cryptographic key management for PTW users, but PTS-G will procure and install the associated PTES Joint Hubs and other ground infrastructure to operate the satellites, anchor the data, and perform Operation and Support (O&S). In addition, the PTS-R system will be integrated with components of PTES and will be complementary to PTS-G. PTS-G addresses the gap in protected communications capability identified in the USSF FD and in the Joint Space Communications Layer (JSCL) Initial Capabilities Document (ICD). To meet the warfighter requirements for protected tactical MILSATCOM and the capability gaps identified in these studies in a timely and cost-effective manner, use and modification of existing capabilities and Commercial Off the Shelf (COTS) products will be leveraged to the maximum extent, to develop the PTS-G capabilities. SSC will strategically execute prototyping and risk reduction as needed to develop and deploy PTS-G capabilities. This program element may include necessary civilian pay expenses required to manage, execute, and deliver PTS weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 1206392SF and 1206398SF. This effort is in Budget Activity 4, Advanced Component Development and Prototypes (ACD&P), because efforts are necessary to evaluate integrated technologies, representative modes or prototype systems in a high fidelity and realistic operating environment.
Mission — Protected Tactical SATCOM - Global (PTS_G)
In CY 2022 the Space Warfighting Analysis Center (SWAC) identified gaps in protected SATCOM capabilities relative to existing and planned capabilities against current and predicted user needs, with consideration of current and emerging challenges to both operating environments and system deployment. SWAC developed a Force Design (FD) to address these gaps, realigning capabilities and disaggregating mission sets. Protected Tactical SATCOM - Global (PTS-G) is a key and enabling capability of the USSF Force Design (FD) that bridges the gap between the more focused capabilities provided by Protected Tactical SATCOM - Resilient (PTS-R), and the broadly-available but also the lower assured access capabilities provided by existing / emerging MILSATCOM and commercial services. PTS-G also augments current and future warfighter capability with increased global capacity. PTS-G is a moderate degree of assured access communications across military Ka-band and X-band using a disaggregated and proliferated sets of lower-complexity satellites. Space Systems Command (SSC) will develop the PTS-G space and ground systems to provide worldwide assured-access communications for tactical warfighters. PTS-G will consist of two types of space vehicles (PTS-G-Ka and PTS-G-X), and ground infrastructure (system controller/hub with gateways), and will connect to existing Protected Tactical SATCOM Family of Systems ground infrastructure (mission management system and cryptographic key management system) developed under the Protected Tactical Enterprise Service (PTES) program. PTS-G will consist of multiple satellites that can provide either X-band or mil Ka-band transponded capability while also supporting the utilization of the PTW Waveform. PTW modems for user terminals will be acquired by each Service and by international partners. Initially, PTS-G will provide capabilities in select regions. PTS-G will target a solution that can provide worldwide coverage. PTS-G will be interoperable with the PTES program to perform management and cryptographic key management for PTW users, but PTS-G will procure and install the associated PTES Joint Hubs and other ground infrastructure to operate the satellites, anchor the data, and perform O&S. In addition, the PTS-R system will be integrated with components of PTES and will be complementary to PTS-G. PTS-G addresses the gap in protected communications capability identified in the USSF FD and in the Joint Space Communications Layer (JSCL) Initial Capabilities Document (ICD). To meet the warfighter requirements for protected tactical MILSATCOM and the capability gaps identified in these studies in a timely and cost-effective manner, use and modification of existing capabilities and Commercial Off the Shelf (COTS) products will be leveraged to the maximum extent, to develop the PTS-G capabilities. SSC will strategically execute prototyping and risk reduction as needed to develop and deploy PTS-G capabilities.
Mission — Protected Tactical SATCOM
For the initial Protected Tactical Satellite Communications (PTS) phase, USSF is utilizing FY 2016 National Defense Authorization Act (NDAA), Middle Tier of Acquisition (MTA) for Rapid Prototyping (RP) authority and Section 815, Other Transaction Authority (OTA), to achieve an affordable, rapid, operational capability for the tactical warfighter. This strategy employs rapid payload development to progressively and incrementally deploy prototypes with residual capabilities demonstrated in an operational environment. These prototyping payloads (PTS-P) demonstrate innovative Anti-Jam (AJ) technologies with modular and scalable payloads to meet validated military needs for protected tactical communications. This includes technical baseline development, systems engineering trade analyses, internal/external system integration and development, candidate system architecture evaluations, risk reduction demonstrations, prototyping concepts development, system testing, and enabling technologies maturation. The PTS-Resilient (PTS-R) project will follow the PTS-P prototyping activity to develop purpose-built "hub in space” satellites with full signal processing and switching capability that allows direct connectivity between users. The Milestone Decision Authority has designated PTS-R as an ACAT I, pre-Milestone B program in the Technology Maturation and Risk Reduction (TMRR) acquisition phase. The PTS-P and PTS-R systems include a Space Segment, Ground Segment, and Gateway Segment. For the Space Segment, the USSF strategy utilizes a payload-centric focus to enable an affordable, resilient space architecture. This enables hosting and rideshare opportunities with other US government, commercial, International Partner (IP) satellites or integration onto a commodity satellite bus. For the Ground Segment, PTS develops satellite command and control (C2) and leverages the Protected Tactical Enterprise Service (PTES) RP activity for mission and key management planning. The PTS Gateway Segment enables tactical warfighters reach back to global DoD Information Network. The PTS user Terminal Segment, not included in this PTS acquisition, will be procured by the military services utilizing low-cost Protected Tactical Waveform (PTW) modem upgrades enabled by the Air Force-Army Anti-Jam Modem (A3M) ACAT III program and the Navy Wideband Anti-Jam Modem System (WAMS) technology demonstration program. PTS also develops the National Security Agency (NSA)-certified and space-flight qualified production-ready Space Hub End Cryptographic Unit (ECU). Starting the ECU as a single, early risk-reduction effort targets a high-risk area of the PTS development and enables PTS program success.
Justification
Accomplishments & Planned Programs (8)
Protected Tactical SATCOM - Global (PTS-G)
PTS-G includes the engineering, development and manufacturing of payload and satellites with X-band and military Ka-band transponder communication capability and ground infrastructure to include anchor stations that will connect into existing Protected Anti-jam Tactical SATCOM (PATS) infrastructure developed under the PTES program. Includes ground and software modifications required beyond the PTES baseline in order to interface with PTS-G segments. Includes ground development, modifications, and/or services for satellite operations. PTS-G is expected to use existing PTW-capable user modems, but it may also support transponded communications with other modems. PTW modems for user terminals will be acquired by each Service and by international partners.
PTS Prototype Design and Development
Rapid prototyping of the PTS Space Segment for two PTS-P payloads and bus C2 development/upgrades at the operating centers for the Ground Segment. Develop, demonstrate, test, and evaluate PTS hardware/software systems and key system components. Design and develop modular, scalable payloads to support hosted or free-flyer configurations. Includes integration to host vehicle or purchase of a bus for free-flier configuration. Demonstrate prototype payload on-orbit performance. Evaluate PTS concept of operations with user participation and enable potential residual operational capability. Mature and validate user requirements. Support development, risk reduction, and integration efforts to launch two prototype payloads in FY 2026, one as a hosted payload and one as a free flyer.
PTS-P/R Space Hub End Cryptographic Unit (ECU)
Develop National Security Agency (NSA) certified, space-flight qualified, production-ready Space Hub ECUs for integration with the PTS payloads. Conduct and design development to alleviate critical path risks to the launch of PTS payloads. Conduct requirements reviews, functional and design reviews, PTS interface development, Interface Control Document (ICD) coordination, and payload integration with PTS vendors.
PTS-P/R Ground Development
Develops and incorporates Mission Management System and Key Management System (MMS/KMS) modifications of the Protected Tactical Enterprise Service (PTES) program ground capability to plan and manage PTS, the associated cryptographic material and the SATCOM links they enable. Also develops and incorporates modifications to MMS of the WGS program ground capability (i.e. Common Network Planning Software (CNPS) and Wideband SATCOM Trend Analysis and Anomaly Resolution System (WSTARS).
PTS-P Gateway Development
Develop the Gateway Segment, also called PTS Ground Entry Terminal-Prototype (PGET-P), for integration with the PTS system. Conduct requirements reviews, functional and design reviews, PTS interface development, and Interface Control Document (ICD) coordination, and integration with Protected Tactical Waveform (PTW) modems (i.e. Air Force-Army Anti-Jam Modem and Navy Wideband Anti-Jam Modem System).
PTS-Resilient
The PTS Engineering and Manufacturing Development (EMD) Phase major thrust name has changed to 'PTS-Resilient', since the milestone decision authority directed the program to transition acquisition pathways from MTA to major capability acquisition (MCA) within the Technology, Maturation and Risk Reduction (TMRR) phase. This major thrust includes the development, build, test, and evaluation of the PTS-R space vehicles and payloads to support hosted or free-flyer configurations available for launch in FY 2031. Includes payload and bus control development/upgrades at the operational centers. Includes design, development, test, and integration efforts for the PTS-R Ground Entry Terminal (PGET) segment. Deliver Initial Operational Capability (IOC) for protected communications against threats in FY 2031 with an operational payload. Continue to mature PTS concept of operations with user participation.
Protected Tactical Testbed
The Protected Tactical Waveform Testbed is the government's gold standard reference for Protected Tactical Waveform (PTW) and Key Management System (KMS) within the Protected Tactical SATCOM (PTS) family of systems. Deployed across government, industry, and FFRDC facilities, it supports PTW development across space, ground, and user terminal modem segments, including PTS Prototype and Resilient Programs. It enables early interoperability checks and reduces integration risks among all segments developed by other DoD Services and Agencies. The PTW Testbed also supports on-orbit testing, system demonstrations, and operational maturation.
Technical Baseline Management, System Integration and Test Support
Perform as Government system integrator function through acquiring, designing, testing, and integrating key segments and interfaces. Mature technical baseline and interface requirements for the system. Conduct architectural engineering and system level integration planning supporting the PTS Rapid Prototyping TMRR/EMD Phases for the Space, Ground, and Gateway Segments. Support, configure, and conduct integrated testing of the major PTS subsystems, segments, and end-to-end system, to include supporting testing conducted by the 96th Test Wing (TW). Manage the PTS open system architecture, refine interface requirements, and validate concept of operations through integrated system performance demonstrations.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test, and Evaluation, Space Force | F | FY24 Actuals | $210.7M |
| Research, Development, Test, and Evaluation, Space Force | F | FY25 Enacted | $420.0M |
| Research, Development, Test, and Evaluation, Space Force | F | FY25 Total | $420.0M |
| Research, Development, Test, and Evaluation, Space Force | F | FY26 Disc. Request | $571.9M |
| Research, Development, Test, and Evaluation, Space Force | F | FY26 Total | $571.9M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $0 | $210.7M | $420.0M | $571.9M | $571.9M |
| 643722: Protected Tactical SATCOM - Global (PTS_G) | $0 | $0 | $101.0M | $239.6M | $239.6M |
| 643728: Protected Tactical SATCOM | $0 | $210.7M | $319.0M | $332.3M | $332.3M |
Follow the dollar
Appropriation → program element → top high-confidence awards → recipient families → congressional districts.
Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →
The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.
| District | Program obligations |
|---|---|
| CA-49 | $7.50M |
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.
| Recipient | PIID | Confidence |
|---|---|---|
| VIASAT INC | FA880725FB017 | high |
| L3 TECHNOLOGIES, INC. | FA880820F0002 | medium |
| RAYTHEON COMPANY | FA880820F0001 | medium |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Protected Tactical Service (PTS). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J797
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2021 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J837
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J804
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J768
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J758
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J778
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
FY2026 Space Force Research and Development Test and Evaluation · www.saffm.hq.af.mil