Cooperative Engagement Capability (CEC)
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $136.3M |
| FY25 | $142.6M |
| FY26 | $136.4M |
All series figures: R-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $0 | $0 | $75.1M | $88.1M | $124.4M | $122.8M | $129.6M | $148.6M | $150.8M | $136.3M | ||
| Enacted | $0 | $84.5M | $92.6M | $128.8M | $127.9M | $134.0M | $162.7M | $156.1M | $153.4M | $142.6M | ||
| Request | $84.5M | $92.6M | $130.5M | $127.9M | $143.7M | $176.5M | $156.1M | $153.4M | $142.6M | $136.4M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2022 book requested $176.5M for FY2022; the PB2024 book reported $148.6M as actual total obligation authority — $27.9M below the request. 148.6 − 176.5 = -27.9 USD millions — the compact figures above are rounded for reading.
Program lineage
Predecessors (funding flowed in)
- realigned from · per FY2026 J-book
show sentence
“Effective in FY 2026, Project 3311 Navigation Systems moved from PE 0204228N to PE 0607658N as part of the PE/BLI consolidation effort in the DoD Implementation Plan from the Commission on PPBE Reform Final Report.”
0607658N — Cooperative Engagement Capability (CEC)Family Funding Line
Funding chain: 0204228N0607658N — Surface Support
- FY2017
0204228N$21.2M0607658N$84.5M - FY2018
0204228N$24.8M0607658N$92.6M - FY2019
0204228N$11.7M0607658N$130.5M - FY2020
0204228N$36.4M0607658N$127.9M - FY2021
0204228N$33.5M0607658N$143.7M - FY2022
0204228N$13.7M0607658N$176.5M - FY2023
0204228N$12.2M0607658N$156.1M - FY2024
0204228N$8.62M0607658N$153.4M - FY2025
0204228N$8.42M0607658N$142.6M - FY2026$136.4M
Description
Mission — Cooperative Engagement Capability
PE 0607658N: The Command and Control RDT&E funding will be used for the research, design, development, integration testing, and documentation of the Cooperative Engagement Capability (CEC), Submarine Speed Sensors, and Inertial Navigation System (INS) AN/WSN-12. PU 2039 COOP Engagement: Cooperative Engagement Capability (CEC) significantly improves Battle Force Anti-Air Warfare (AAW) capability by coordinating all Battle Force AAW sensors into a single, real-time, composite track picture to support integrated fire control. PU 3240 CEC Increment II: The Cooperative Engagement Capability (CEC) Increment 2 (Inc 2) Capability Development Document (CDD) evolves CEC capabilities by enhancing the current Naval air defense and sensor network system capabilities through extension of kill chains, extension of communications Beyond Line of Sight (BLOS), expansion of composite track management capability-Joint and Force Level, expansion of network capacity, as well as expansion into other warfare mission domains. The CEC Inc 2 CDD integrates new sensor types and track data sources into the network, such as surface search radars and passive detection sensors, as well as relevant data from other networks. The CEC Inc 2 CDD provides a more complete, robust, and resilient situational awareness picture, composite identification, and Integrated Fire Control. It also accommodates more Cooperating Units with assured communications for Integrated Air and Missile Defense, Surface Warfare, and Electronic Warfare domains. The CEC Inc 2 CDD was signed by Vice Chief of Naval Operations (VCNO) on 26 June 2019 and approved by the Joint Capabilities Board (JCB) on 18 March 2020. The CEC Program has realigned RDT&E funding from PU 2039 COOP Engagement to PU 3240 CEC Increment 2 for the incremental development of CEC software and hardware improvements necessary to meet the requirements in the CEC Increment 2 CDD. In FY26, the Antenna Development line in PU 2039 COOP Engagement ends and the associated RDT&E transitions to the PU 3240 CEC Increment 2 Hardware Modernization and System Integration lines. PU 3311 Navigation Systems: Navigation Systems RDT&E funding will be used for the research, design, development, integration testing, and documentation of the Inertial Navigation System (INS) AN/WSN-12 and Submarine Speed Sensors. In FY 2026, the Navy has executed a zero-sum movement of Navigation Systems RDT&E from PE 0204228N to PE 0607658N for PU 3311. There is no growth from FY 2025 to FY 2026 for Navigation Systems RDT&E. PU 3311 will retain its budget structure under PE 0607658N which also contains the RDTE Project Units for the other IWS 6 N2N6 Command and Control Programs Cooperative Engagement Capability (CEC) and CEC Increment 2.
Mission — COOP Engagement
Cooperative Engagement Capability (CEC) significantly improves Battle Force Anti-Air Warfare (AAW) capability by coordinating all Battle Force AAW sensors into a single, realtime, composite track picture to support integrated fire control. CEC distributes sensor data from each USMC Command Control Unit, US Navy Ship, and US Navy Aircraft, or Cooperating Unit (CU), to all other CUs in the battle force through a real-time, line of sight, high data-rate sensor and engagement data distribution network. CEC is highly resistant to jamming and provides accurate gridlocking between CUs. Each CU independently employs high capacity, parallel processing and advanced algorithms to combine all distributed sensor data into a fire control quality track picture which is the same for all CUs. CEC data is presented as a superset of the best AAW sensor capabilities from each CU, all of which are integrated into a single input to each CU's combat weapons system. CEC significantly improves our Battle Force defense in depth, including both local area and ship defense capabilities against current and future AAW threats. Moreover, CEC provides critical connectivity and integration of over-land air defense systems capable of countering emerging air threats, including land attack cruise missiles, in a complex littoral environment. The CEC Program Office oversees CEC development for all services with funding provided for their respective combat systems. CEC consists of the Data Distribution System (DDS), the Cooperative Engagement Processor (CEP), and interface with Combat Systems and sensors. The DDS encodes and distributes own-ship sensor and engagement data and is a high capacity, jam resistant, directional system providing high data throughput as well common time and common positional frame of reference. The CEP is a high capacity distributed processor that processes data from all integrated radars. The data is passed to the ship's combat system as a high quality, common, continuous, engageable track. The Navy implemented a Signal Data Processor (SDP) approach to modify the current equipment to meet reduced size, weight, cost, power and cooling objectives. This SDP approach also supports continuity for interoperability improvements and program protection, as well as supporting open architecture initiatives, and communications independence. The SDP hardware complies with Category 3 Open Architecture Computing Environment (OACE) standards. The SDP-S is being fielded fleet-wide to all US Navy, USMC, and FMS CEC units. CEC operates in an increasingly contentious cyber-space. Measures are being taken to robustly mitigate, and where possible, completely remediate cyber vulnerabilities. The Cooperative Engagement Capability (CEC) Increment 2 (Inc 2) Capability Development Document (CDD) evolves CEC capabilities by enhancing the current Naval air defense and sensor network system capabilities through extension of kill chains, extension of communications Beyond Line of Sight (BLOS), expansion of composite track management capability-Joint and Force Level, expansion of network capacity, as well as expansion into other warfare mission domains. The CEC Inc 2 CDD integrates new sensor types and track data sources into the network, such as surface search radars and passive detection sensors, as well as relevant data from other networks. The CEC Inc 2 CDD provides a more complete, robust, and resilient situational awareness picture, composite identification, and Integrated Fire Control. It also accommodates more Cooperating Units with assured communications for Integrated Air and Missile Defense, Surface Warfare, and Electronic Warfare domains. The CEC Inc 2 CDD was signed by Vice Chief of Naval Operations (VCNO) on 26 June 2019 and approved by the Joint Capabilities Board (JCB) on 18 March 2020. The CEC Program has realigned RDT&E funding from PU 2039 COOP Engagement to PU 3240 CEC Increment 2 for the incremental development of CEC software and hardware improvements necessary to meet the requirements in the CEC Increment 2 CDD. In FY26, the Antenna Development line in PU 2039 COOP Engagement ends and the associated RDT&E transitions to the PU 3240 CEC Increment 2 Hardware Modernization and System Integration lines.
Mission — CEC Increment II
The Cooperative Engagement Capability (CEC) Increment 2 (Inc 2) Capability Development Document (CDD) evolves legacy CEC capabilities by enhancing the current Naval air defense and sensor network system capabilities through extension of kill chains, extension of communications Beyond Line of Sight (BLOS), expansion of composite track management capability-Joint and Force Level, expansion of network capacity, as well as expansion into other warfare mission domains. The CEC Inc 2 CDD integrates new sensor types and track data sources into the network, such as surface search radars and passive detection sensors, as well as relevant data from other networks. The CEC Inc 2 CDD provides a more complete, robust, and resilient situational awareness picture, composite identification, and Integrated Fire Control. It also accommodates more Cooperating Units with assured communications for Integrated Air and Missile Defense, Surface Warfare, and Electronic Warfare domains. The CEC Inc 2 CDD was signed by Vice Chief of Naval Operations (VCNO) on 26 June 2019 and approved by the Joint Capabilities Board (JCB) on 18 March 2020. Although CEC BLK II is a Navy program, it does have joint force interest through potential inclusion in higher-level sensor-to-shooter networks like the Naval Tactical Grid (NTG), the Joint Tactical Grid (JTG), and Joint All Domain Command and Control (JADC2) concept and capability developments. New capability development designated in the CEC Inc 2 CDD will be realized through a series of Acquisition Category (ACAT) II Block (BLK) upgrades (BLK II-IV), with the first being enumerated as CEC BLK II. The new capability development within each BLK upgrade is further organized and phased into incrementally developed and delivered Capability Groups (CGs). CEC BLK II is comprised of Capability Groups 3 and 4. CEC BLK II is a software intensive capability insertion into an existing ACAT IC Full Rate Production system. The CEC Program has realigned RDT&E funding from PU 2039 COOP Engagement to PU 3240 CEC Increment 2 for the incremental development of CEC software and hardware improvements necessary to meet the requirements in the CEC Increment 2 CDD. ELEKTRA efforts end after FY25 and the funding transitions to related CEC BLK III and Hardware Modernization efforts. In FY26, the Antenna Development line in PU 2039 COOP Engagement ends and the associated RDT&E transitions to the PU 3240 CEC Increment 2 CEC System Hardware Modernization and CEC Increment 2 Software and System Hardware Integration lines. Additionally in FY26, the CEC BLK II software development efforts begin to transition to CEC BLK III efforts, and the associated RDT&E transitions to the CEC BLK III Software Development line. The PU3240 CEC BLK II software development RDT&E lines that transition to CEC BLK III Software Development are: NIFC Hypersonic; NIFC Passive; and FIRECAPE. The PU3240 Crypto Modernization line transitions to both the CEC BLK III Software Development line and the CEC System Hardware Modernization line. CEC Increment 2 CEC BLK II (FY20-FY26) Capability Group 3 Capability Group 4 CEC BLK III (FY26- And Following) Capability Group 5 Capability Group 6 CEC BLK IV (Future FYs) Capability Group 7 Capability Group 8
Mission — Navigation Systems
Effective in FY26, the scope of this PE is changing based on the PE/BLI consolidation effort in the DoD Implementation Plan from the Commission on PPBE Reform Final Report. Beginning in FY26, this PE will include the following efforts: The Surface Support RDT&E funding will be used for the research, design, development, integration testing, and documentation of the Inertial Navigation System (INS) AN/WSN-12 for all Navy ships and submarines. The INS provides mission critical ship position and attitude data to shipboard sensors (such as radars), combat and weapon systems. The INS uses data from the Global Positioning System (GPS) to periodically update (i.e., reset) its position and internal clock. The INS is the ship's primary position source in the absence of GPS, and it consists of an Inertial Sensor Module (ISM) and a Navigation Processing Module (NPM) that will provide a significant improvement with respect to attitude and velocity data over previous INS. RDT&E funding will support continued system design to create a baseline for Pre-Production Units (PPU), Low Rate Initial Production (LRIP), and Full Rate Production (FRP). Submarine Speed Sensors will provide investigation, development, testing and integration of new Own-Ship Speed sensors to address new capabilities, reduce detection, and improve reliability.
Justification
No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Navy | N | FY24 Actuals | $136.3M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Enacted | $142.6M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Total | $142.6M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Disc. Request | $136.4M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Total | $136.4M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $1.43B | $136.3M | $142.6M | $136.4M | $136.4M |
| 2039: COOP Engagement | $1.24B | $78.0M | $93.2M | $60.1M | $60.1M |
| 3240: CEC Increment II | $193.0M | $58.3M | $49.3M | $69.1M | $69.1M |
| 3311: Navigation Systems | $0 | $0 | $0 | $7.24M | $7.24M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.
| Recipient | PIID | Confidence |
|---|---|---|
| LAUREL TECHNOLOGIES PARTNERSHIP | N0002415C5228 | medium |
| LAUREL TECHNOLOGIES PARTNERSHIP | N0002417C5201 | medium |
| RAYTHEON COMPANY | N0002413C5212 | medium |
| RAYTHEON COMPANY | N0002413C5230 | medium |
| RAYTHEON COMPANY | N0002418C5202 | medium |
| RAYTHEON COMPANY | N0002419C5200 | medium |
| RAYTHEON COMPANY | N0002425C5239 | medium |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Cooperative Engagement Capability (CEC). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J451
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2017 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J397
Complete workbook · unchanged saved copy. Saves as PB2017_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2018 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J429
Complete workbook · unchanged saved copy. Saves as PB2018_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2019 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J448
Complete workbook · unchanged saved copy. Saves as PB2019_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2020 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J459
Complete workbook · unchanged saved copy. Saves as PB2020_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2021 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J468
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J438
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J431
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J425
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J433
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
RDTEN BA1-3 Book · www.secnav.navy.mil