Skip to content
Fiscal Receipts

Multi-Mission Maritime (MMA) Increment III

NavyRDT&EReconciledPE0605504N
What it is
Multi-Mission Maritime (MMA) Increment III (0605504N) is a Navy research & development line funded in the Research, Development, Test and Evaluation, Navy account. Its J-book detail breaks the line into 1 project.
What changed
-$21.0M FY25→26 R-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 14 linked award records are listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$123.3MR-1 TOA · PB2026
FY25 Total
$124.4MR-1 TOA · PB2026
FY26 Request
$103.4MR-1 TOA · PB2026
FY25→26 Change
-$21.0MR-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $123.3MFY25: $124.4MFY26: $103.4MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$123.3M
FY25$124.4M
FY26$103.4M

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2015 actuals — PB2017 editionFY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2016 enacted — PB2017 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2017 request — PB2017 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY15FY18FY20FY22FY24FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$0$89.7M$109.8M$123.8M$159.6M$137.3M$178.7M$157.8M$156.9M$123.3M
Enacted$91.6M$182.2M$181.7M$163.8M$141.5M$185.3M$162.9M$161.7M$132.4M$124.4M
Request$182.2M$181.7M$160.4M$177.2M$182.9M$173.8M$161.7M$132.4M$134.4M$103.4M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2017 book requested $182.2M for FY2017; the PB2019 book reported $109.8M as actual total obligation authority — $72.4M below the request. 109.8 − 182.2 = -72.4 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Multi-Mission Maritime (MMA) Inc III

The P-8A Increment 3 program consists of incremental enhancement Engineering Change Proposals (ECPs) to system capabilities that will retain cost-wise effectiveness for major combat operations. Increment 3 will incorporate improvements to aircraft systems including significant war-altering Anti-Submarine Warfare (ASW) capabilities of Enhanced Multi-Static Active Coherent (MAC-E) and ASW Signal Intelligence (SIGINT) which are enabled by the incorporation of Combat System hardware and architecture improvements, ASW and Anti-Surface Warfare (ASuW) sensor improvements, communication capability upgrades, ASuW Net Enabled Weapon (NEW), Higher-Than-Secret (HTS) security capability, and associated pre/post-flight ground system development to support Increment 3 aircraft and Increment 3 ground system requirements. These capabilities will be developed as a series of ECPs for the P-8A and are as follows: - ECP 6 - ASW SIGINT, Anti-Submarine Warfare (ASW) capability, Wide Band SATCOM, Higher Than Secret (HTS) processing, Enhanced track management (Minotaur), Applications Based Architecture (ABA) and Combat System. - ECP 7 - Enhanced Multi-Static Active Coherent (MAC-E). - Pre/Post-Flight Ground System Development - System upgrades to the associated ground support system and Tactical Operations Center (TOC)/Aircraft Media Gateway (AMG) systems. To expedite fielding of the ASW critical capability to the P-8A Fleet, ECP 6 and ECP 7 software are being integrated concurrently on to the platform. ECP 7 is reliant on ECP 6's Combat System hardware and architecture to operate on the P-8A. Enhanced MAC-E (ECP 7) is developed within Program Element (PE) 0604261N and integrated via the Platform Integration contract within this PE. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under SYSTEM DEVELOPMENT AND DEMONSTRATION because it includes requirements identified under the baseline P-8 program between Milestone B and the Full Rate Production Decision (FRPD). Subsequent to the P-8 FRPD, the DoD Acquisition Authority directed in 2016 these Increment 3 requirements be satisfied as Engineering Change Proposals (ECPs) under the existing P-8 program vice under a separate acquisition program. Note: ECP 6/7 fielding planned with initial scheduled Fleet deployment in 3Q FY 2026.

Mission — P-8A Spiral 2 Development

The P-8A Increment 3 program consists of incremental enhancement Engineering Change Proposals (ECPs) to system capabilities that will retain cost-wise effectiveness for major combat operations. Increment 3 will incorporate improvements to aircraft systems including significant war-altering Anti-Submarine Warfare (ASW) capabilities of Enhanced Multi-Static Active Coherent (MAC-E) and ASW Signal Intelligence (SIGINT) which are enabled by the incorporation of Combat System hardware and architecture improvements, ASW and Anti-Surface Warfare (ASuW) sensor improvements, communication capability upgrades, ASuW Net Enabled Weapon (NEW), Higher-Than-Secret (HTS) security capability, and associated pre/post-flight ground system development to support Increment 3 aircraft and Increment 3 ground system requirements. These capabilities will be developed as a series of ECPs for the P-8A and are as follows: - ECP 6 - ASW SIGINT, Anti-Submarine Warfare (ASW) capability, Wide Band SATCOM, Higher Than Secret (HTS) processing, Enhanced track management (Minotaur), Applications Based Architecture (ABA) and Combat System. - ECP 7 - Enhanced Multi-Static Active Coherent (MAC-E). - Pre/Post-Flight Ground System Development - System upgrades to the associated ground support system and Tactical Operations Center (TOC)/Aircraft Media Gateway (AMG) systems. To expedite fielding of the ASW critical capability to the P-8A Fleet, ECP 6 and ECP 7 software are being integrated concurrently on to the platform. ECP 7 is reliant on ECP 6's Combat System hardware and architecture to operate on the P-8A. ECP 6 integration activities began in FY 2019 with initiation of the Government Lead Capability Integrator (LCI) integration and award of the Platform Integration (PI) contract to Boeing. ECP 7 integration activities began in FY 2021. ECP 6/7 Integrated Flight Test & Evaluation began 3Q FY 2022. Enhanced MAC-E (ECP 7) is developed within Program Element (PE) 0604261N and integrated via the Platform Integration contract within this PE. Note: ECP 6/7 fielding in 1Q FY 2026 includes 7 aircraft (1 squadron) modified, trained and ready to deploy to include pre/post-flight ground systems.

Justification

No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, NavyNFY24 Actuals$123.3M
Research, Development, Test and Evaluation, NavyNFY25 Enacted$124.4M
Research, Development, Test and Evaluation, NavyNFY25 Total$124.4M
Research, Development, Test and Evaluation, NavyNFY26 Disc. Request$103.4M
Research, Development, Test and Evaluation, NavyNFY26 Total$103.4M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$1.10B$123.3M$124.4M$103.4M$103.4M
3218: P-8A Spiral 2 Development$1.10B$123.3M$124.4M$103.4M$103.4M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.

RecipientPIIDConfidence
AEROSPACE MASS PROPERTIES ANALYSIS INCN6833518C0180medium
ISLAND CREEK ASSOCIATES, LLCN6833519C0618medium
LOCKHEED MARTIN CORPORATIONN0001915C0021medium
THE BOEING COMPANYN0001904C3146medium
THE BOEING COMPANYN0001914C0067medium
THE BOEING COMPANYN0001917F0383medium
THE BOEING COMPANYN0001917F0504medium
THE BOEING COMPANYN0001918F2430medium
THE BOEING COMPANYN0001918F2433medium
THE BOEING COMPANYN0001918F2526medium
THE BOEING COMPANYN0001919F2496medium
THE BOEING COMPANYN0001919F2648medium
THE BOEING COMPANYN0001919F2680medium
THE BOEING COMPANYN0001919F2963medium

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Multi-Mission Maritime (MMA) Increment III. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.