Skip to content
Fiscal Receipts

Acoustic Search Sensors

NavyRDT&EReconciledPE0604261N
What it is
Acoustic Search Sensors (0604261N) is a Navy research & development line funded in the Research, Development, Test and Evaluation, Navy account. Its J-book detail breaks the line into 3 projects.
What changed
-$1.04M FY25→26 R-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$60.1MR-1 TOA · PB2026
FY25 Total
$53.6MR-1 TOA · PB2026
FY26 Request
$52.5MR-1 TOA · PB2026
FY25→26 Change
-$1.04MR-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $60.1MFY25: $53.6MFY26: $52.5MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$60.1M
FY25$53.6M
FY26$52.5M

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2015 actuals — PB2017 editionFY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2016 enacted — PB2017 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2017 request — PB2017 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY15FY18FY20FY22FY24FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$24.4M$30.6M$28.9M$36.3M$41.4M$45.8M$45.7M$47.5M$47.7M$60.1M
Enacted$31.2M$34.5M$37.2M$42.5M$47.0M$47.2M$49.1M$50.2M$51.5M$53.6M
Request$34.5M$37.2M$42.5M$47.0M$47.2M$46.1M$50.2M$51.5M$53.6M$52.5M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $51.5M for FY2024; the PB2026 book reported $60.1M as actual total obligation authority — $8.54M above the request. 60.075 − 51.531 = 8.544 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Acoustic Search Sensors

U.S. Navy Air Anti-Submarine Warfare (ASW) mission is critical to achieve maritime supremacy against peer threats. RDT&E funds for engineering development and operational test and evaluation of acoustic search sensors/systems and complementary equipment for ASW aircraft. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under SYSTEM DEVELOPMENT AND DEMONSTRATION because it includes those projects that have passed Milestone B approval and are conducting engineering and manufacturing development tasks aimed at meeting validated requirements prior to full-rate production decision.

Mission — ASW Sensors & Proc

The Anti-Submarine Warfare (ASW) Sensors and Processing project provides tools and methods necessary to maintain maritime superiority by preventing near-peer threat submarines from completing their hostile missions or disrupting the U.S. Navy's ability to control sea lanes of communication. Project 0480 provides funding for Engineering & Manufacturing Development and follow-on Production and Deployment of new and/or improved passive and active air ASW family of systems that enable cuing, search, detection, localization, track, and attack of subsurface targets. Smaller and quieter threat submarines drive requirements for continued advancement in ASW sensor capabilities for both open-ocean and littoral environments in order to overcome challenges associated with reduced target acoustic signatures and increased background clutter caused by the water depth, high volume of shipping, and commercial radio frequency interference. Multistatic Active Coherent Enhancements (MAC-E): PE 0604261N funds the incorporation of the capability into the P-8A Acoustic Operating Flight Program (AOFP), integration of the AOFP into the P-8A Mission suite and associated training system and Post Flight Analysis (PFA) tool updates. The remainder of the integration into the P-8A platform is accomplished via PE 0605504N. UnderSea Advantage (USA): USA is the next generation of multistatics. USA incorporates an incremental improvement upon the existing system and will be accomplished via three blocks. The first block will be funded in the following manner: Early development and technology maturation efforts are funded under PE 0603254N, and PE 0604261N funds the incorporation of the capability into the P-8A AOFP and integration of the AOFP into the P-8A Mission suite. 0604261N also funds the associated training system and Post Flight Analysis (PFA) tool updates. The remainder of the integration into the P-8A platform is accomplished via PE 0605504N. Project 0480 also provides funding for the Advanced Product Build (APB) program which integrates Office of Naval Research (ONR) Future Naval Capabilities (FNCs), Small Business Innovation Research (SBIR), and University Affiliated Research Center (UARC) products and mature technologies into the processing baseline. Efforts incorporate clutter reduction techniques, automation, improved displays and controls, and improved communication links to enable reduced operator workload, increased target detection opportunities, and improved classification techniques. Sonobuoy test articles in FY24-FY30 support software and hardware integration flights tests, data collection, and analysis for the acoustic program in order to develop updated fleet release software. APB also includes an Air ASW Engineering Measurement Program (AAEMP) that collects ASW operational performance data to identify areas where improvements can be incorporated across Air ASW platforms. Finally, project funding provides initial and interim training of new capabilities to test and fleet aircrew.

Mission — High Altitude ASW

High Altitude ASW project provides Key Enablers/Sonobuoy Enhancements (KESE) that increase P-8A operational flexibility and effectiveness throughout the kill chain. Funding addresses key enablers such as, uplink/downlink sonobuoy communications assurance, AELS/over-the-horizon (OTH) communications, acoustic communications (ACOMMS) and sonobuoy enhancements that include: digitization, cyber protection and the integration into the AOFP software.

Mission — Congressional Adds

Congressional Add. Implement sonobuoy modernization.

Justification

No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, NavyNFY24 Actuals$60.1M
Research, Development, Test and Evaluation, NavyNFY25 Enacted$53.6M
Research, Development, Test and Evaluation, NavyNFY25 Total$53.6M
Research, Development, Test and Evaluation, NavyNFY26 Disc. Request$52.5M
Research, Development, Test and Evaluation, NavyNFY26 Total$52.5M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$775.5M$60.1M$53.6M$52.5M$52.5M
0480: ASW Sensors & Proc$635.0M$42.6M$42.7M$41.7M$41.7M
3224: High Altitude ASW$140.4M$7.38M$10.9M$10.9M$10.9M
9999: Congressional Adds$0$10.1M$0$0$0

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Acoustic Search Sensors. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.