Soldier Systems - Warrior Dem/Val
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $18.9M |
| FY25 | $29.1M |
| FY26 | $4.14M |
All series figures: R-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $5.94M | $15.7M | $11.9M | $15.5M | $10.0M | $4.61M | $6.55M | $6.22M | $19.2M | $18.9M | ||
| Enacted | $18.8M | $12.4M | $16.1M | $10.4M | $4.80M | $6.30M | $6.45M | $19.4M | $11.3M | $29.1M | ||
| Request | $12.4M | $16.1M | $10.4M | $5.80M | $6.53M | $6.45M | $11.4M | $11.3M | $29.1M | $4.14M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2023 book requested $11.4M for FY2023; the PB2025 book reported $19.2M as actual total obligation authority — $7.81M above the request. 19.2 − 11.4 = 7.8 USD millions — the compact figures above are rounded for reading.
Program lineage
0604827A — Soldier Systems - Warrior Dem/ValSuccessors (funding flowed out)
- realigned to · per FY2026 J-book · BA9
show sentence
“Realignment starting FY 2026 to Lethal Semi-Autonomous Aerial Unmanned Sys-Eng Dev (0609345A/A49) funding line.”
Family Funding Line
Funding chain: 0304270A — Electronic Warfare Development
- FY2017$14.4M
- FY2018$14.6M
- FY2019$8.92M
- FY2020$22.9M
- FY2021$59.8M
- FY2022$75.5M
- FY2023$56.9M
- FY2024$137.2M
- FY2025$131.1M
This family branches — the funding line above is shown for the 1:1 chain only. Branch arms (splits or merges) are not summed into this series.
Description
Mission — Soldier Systems - Warrior Dem/Val
A portion of this funding line is a key enabler of the Army Modernization Priorities in support of the Small Unit Power (SUP) program. Project EY2 - Integrated Soldier Power Data System - Core (ISPDS-C): Includes power and data managing/distribution devices, cutting-edge energy storage solutions, and power scavenging devices. These capabilities fill the power and energy gaps created by the increase in mission essential, Soldier portable power consumers, such as heads up displays, situational awareness displays, global positioning systems, weapon sensors, radios, night vision systems, and other devices. This project line develops power sources and power management solutions for the individual Soldier and squad for use in all operating environments. This project develops and evaluates capabilities to fill the power and energy requirements for critical Network Baseline 4.0 Soldier worn systems to include tactical radios, assured position navigation and timing, Next Generation Squad Weapon, Nett Warrior, Enhanced Night Vision Goggle (all variants, including Binocular), and the Integrated Visual Augmentation System. ISPDS-C systems will enable dismounted Soldiers and squads to execute their missions more efficiently, independently, for longer durations and with fewer battery resupplies while reducing the logistical and physical burden associated with moving fuel and batteries. This project also develops and integrates vehicular on-the-move charging. Project EY4 - Universal Battery Charger (UBC): Fills the power and energy gap created by the increase in mission essential, Soldier portable power consumers, by providing a variety of charging solutions capable of providing power to handheld communication devices and military batteries to support mounted and dismounted formations. The UBC is suited for mounted and dismounted operations at the company level and below in multi-domain and austere operating environments. The system can draw power from wall outlets, vehicle power, generators, and solar power sources. The UBC enables dismounted Soldiers to execute their missions with fewer battery resupplies, thus reducing the logistical burden associated with moving fuel and batteries. The UBC capability allows dismounted Soldiers to operate independently for longer missions. The UBC fills the power and energy gap associated with bulk charging. Project FK4 - Soldier Borne Sensor (SBS): The SBS is a small unmanned aerial vehicle. The SBS provides a near term solution to three Army War-fighting Challenges at the Infantry Squad level: develop situational understanding, conduct air-ground reconnaissance, and conduct joint combined arms maneuver. The system is simple to deploy and use to support the squad leader's decision-making process. The system allows Soldiers to obtain local situational awareness and understanding of their immediate surroundings while remaining in covered or concealed positions. The SBS program will be procured through multiple phases. We will use the funding in this project to develop, integrate, and qualify additional capabilities for each phase. Funding in this project aligns with the Army's priorities in support of the National Defense Strategy. Project LS2 - Lethal Semi-Autonomous Aerial Unmanned System - Engineering Development: This project focuses on engineering and material development in support of the acquisition program for an enduring capability with Low Altitude Strike and Stalk Ordnance (LASSO) CDD which was approved in AUG24. Infantry Brigade Combat Teams (IBCTs) lack adequate organic capabilities at echelon to apply immediate, point, long range, and direct fire effects to destroy tanks, light armored vehicles, hardened targets, defilade, and personnel targets, while producing minimal collateral damage in complex terrain in all environmental conditions. Development will focus on the Fire Control Stations (FCS), All-Up Round (AUR), and System Architecture. Develop technology for incorporation into the CDD update for the Program of Record and conduct tech enhancements from current global conflicts. The funding contained within this budget line and project will be used to conduct evaluations of technologies and capabilities in the loitering munitions capability space, hardware and system architecture engineering and integration activities, and testing and evaluation activities. Realignment starting FY 2026 to Lethal Semi-Autonomous Aerial Unmanned Sys-Eng Dev (0609345A/A49) funding line. S65 - Soldier Power: Soldier Power enables dismounted Soldiers to efficiently execute missions for longer durations by reducing the logistical burden associated with fuel and primary (disposable) batteries. Platoon Power Generation (PPG) - PM E2S2: This project supports the demonstration and development of a PPG. The Small Unit Power (SUP) PPG will provide small units with sufficient portable power to sustain Modified Table of Organizational Equipment (MTOE) unit power demand in support of 48 to 72 hour missions. It will be used for charging batteries and powering various types of Army communications and electronics devices. The FY 2026 request was reduced by $1.427 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."
Mission — Integrated Soldier Power Data System - Core
Integrated Soldier Power Data System - Core (ISPDS-C) includes power and data managing/distribution devices, cutting-edge energy storage solutions, Soldier-worn power generation (fuel cell), and power scavenging devices. These capabilities fill the power and energy gaps created by the increase in mission essential, Soldier portable power consumers, such as heads up displays, situational awareness displays, global positioning systems, weapon sensors, radios, night vision systems, and other devices. This project line develops power sources and power management solutions for the individual Soldier and squad for use in all operating environments. This project develops and evaluates capabilities to fill the power and energy requirements for critical Network Baseline 4.0 Soldier worn systems to include tactical radios, assured position navigation and timing, Next Generation Squad Weapon, Nett Warrior, Enhanced Night Vision Goggle (all variants, including Binocular), and the Integrated Visual Augmentation System. ISPDS-C systems will enable dismounted Soldiers and squads to execute their missions more efficiently, independently, for longer durations and with fewer battery resupplies while reducing the logistical and physical burden associated with moving fuel and batteries. This project also develops and integrates vehicular on-the-move charging.
Mission — Universal Battery Charger
Project EY4 - Universal Battery Charger: Universal Battery Charger (UBC) fills the power and energy gap created by the increase in mission essential, Soldier portable power consumers, by providing a variety of charging solutions capable of providing power to handheld communication devices and military batteries to support mounted and dismounted formations. The UBC is suited for mounted and dismounted operations at the company level and below in multi-domain and austere operating environments. The system can draw power from wall outlets, vehicle power, generators, and solar power sources. The UBC enables dismounted Soldiers to execute their missions with fewer battery resupplies, thus reducing the logistical burden associated with moving fuel and batteries. The UBC capability allows dismounted Soldiers to operate independently for longer missions. The UBC fills the power and energy gap associated with bulk charging.
Mission — Soldier Borne Sensor (SBS)
Project FK4 - Soldier Borne Sensor (SBS): The SBS is a small unmanned aerial vehicle. The SBS provides a near term solution to three Army War-fighting Challenges at the Infantry Squad level: develop situational understanding, conduct air-ground reconnaissance, and conduct joint combined arms maneuver. The system is simple to deploy and use to support the squad leader's decision-making process. The system allows Soldiers to obtain local situational awareness and understanding of their immediate surroundings while remaining in covered or concealed positions. The SBS program will be procured through multiple phases. The program will develop, integrate, and qualify additional capabilities for each phase. Funding in this project aligns with the Army's priorities in support of the Army Transformation Initiative (ATI). Realignment starting FY2026 to Soldier Borne Sensor (0609345A/A50) agile funding line.
Mission — Lethal Semi-Autonomous Aerial Unmanned Sys-Eng Dev
Project LS2 - Lethal Semi-Autonomous Aerial Unmanned System - Engineering Development: This project focuses on engineering and material development in support of the acquisition program for an enduring capability with Low Altitude Strike and Stalk Ordnance (LASSO) CDD which was approved in AUG24. Infantry Brigade Combat Teams (IBCTs) lack adequate organic capabilities at echelon to apply immediate, point, long range, and direct fire effects to destroy tanks, light armored vehicles, hardened targets, defilade, and personnel targets, while producing minimal collateral damage in complex terrain in all environmental conditions. Development will focus on the Fire Control Stations (FCS), All-Up Round (AUR), and System Architecture. Develop technology for incorporation into the CDD update, for the Program of Record, and conduct tech enhancements from current global conflicts. The funding contained within this budget line and project will be used to conduct evaluations of technologies and capabilities in the loitering munitions capability space, hardware and system architecture engineering and integration activities, and testing and evaluation activities. Realignment starting FY 2026 to Lethal Semi-Autonomous Aerial Unmanned Sys-Eng Dev (0609345A/A49) funding line.
Mission — Platoon Power Generator
Platoon Power Generation - PM E2S2: This project supports the demonstration and development of Platoon Power Generation (PPG). PPG will provide small units with portable power to sustain Modified Table of Organizational Equipment (MTOE) unit power demand in support of 48 to 72 hour missions. It will be used for charging batteries and powering various types of Army communications and electronics devices. It will provide sufficient power to recharge and power all Platoon equipment and fulfill residual power gaps at the Squad and Soldier level. The generator will provide Platoon power for charging batteries when away from vehicles in all Brigade Combat Teams (Stryker, Armor and Infantry), Rangers and Special Forces in austere environments. Funding for this program was changed from FY 2026 and beyond due to reprioritization of resources across the Army portfolio.
Justification
Accomplishments & Planned Programs (9)
Test and Evaluation
Test and validate power and energy solutions from new battery chemistries, fuel cells, and scavenging devices and integrating the solutions using common interfaces with the Power and Data Hub and Squad Power Manager.
System Engineering & Program Management
Conduct system engineering and project management for ISDPS-C efforts and power characterization efforts.
ISPDS-C/CWB Capability Improvements Integration
Evaluate higher energy density power, alternative energy solutions and improved power data management (e.g. improved battery chemistry, charging on the move development, Soldier worn power generation).
Develop alternative CWB sources.
Develop alternative power storage technologies.
Test & Evaluation
Develop and evaluate improved UBC products, including bulk charging and power on the move charging systems.
System Engineering & Program Management
Description: Conduct system engineering and project management for UBC efforts.
Soldier Borne Sensor (SBS)
The SBS provides the squad a "quick look" capability providing Situational Awareness (SA).
Low Altitude Stalking and Strike Ordnance (LASSO)
LASSO is intended to increase the lethality of the IBCT specifically against troops, armored vehicles, and tanks.
S65-Platoon Power Generator
Spark-ignited COTS Operational Life and Reliability Study (SCOLARS) will improve and increase Soldier-portable systems as a bridging solution, and utilization of open competition for development of fuel cell solutions. Maturation of technologies in lightweight power generation capabilities are needed to meet requirements and increase competition.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Army | A | FY24 Actuals | $18.9M |
| Research, Development, Test and Evaluation, Army | A | FY25 Enacted | $29.1M |
| Research, Development, Test and Evaluation, Army | A | FY25 Total | $29.1M |
| Research, Development, Test and Evaluation, Army | A | FY26 Disc. Request | $4.14M |
| Research, Development, Test and Evaluation, Army | A | FY26 Total | $4.14M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|
| Program Element | $18.9M | $29.1M | $4.14M | $4.14M |
| EY2: Integrated Soldier Power Data System - Core | $12.4M | $4.59M | $3.50M | $3.50M |
| EY4: Universal Battery Charger | $940.0K | $982.0K | $636.0K | $636.0K |
| FK4: Soldier Borne Sensor (SBS) | $1.60M | $1.64M | — | — |
| LS2: Lethal Semi-Autonomous Aerial Unmanned Sys-Eng Dev | — | $16.4M | — | — |
| S65: Platoon Power Generator | $3.93M | $5.56M | — | — |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Soldier Systems - Warrior Dem/Val. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J127
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2017 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J108
Complete workbook · unchanged saved copy. Saves as PB2017_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2018 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J115
Complete workbook · unchanged saved copy. Saves as PB2018_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2019 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J118
Complete workbook · unchanged saved copy. Saves as PB2019_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2020 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J141
Complete workbook · unchanged saved copy. Saves as PB2020_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2021 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J149
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J119
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J121
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J119
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J118
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
RDTE - Vol 3 - Budget Activity 5A · www.asafm.army.mil