What it is
Ship Self Defense (Engage: Hard Kill) (0604756N) is a Navy research & development line funded in the Research, Development, Test and Evaluation, Navy account. Its J-book detail breaks the line into 5 projects.
What changed
+$285.4M FY25→26 R-1 TOA · PB2026
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$46.7MR-1 TOA · PB2026
FY25 Total
$59.6MR-1 TOA · PB2026
FY26 Request
$345.0MR-1 TOA · PB2026
58.0% reconciliation

$145.0M discretionary + $200.0M one-time reconciliation. Discretionary change vs FY2025 enacted: +143.2%.

FY25→26 Change
+$285.4MR-1 TOA · PB2026

Two official figures, one label— reconciled below

Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows (such as advance procurement) that the R-2/P-40 J-book program line excludes. How the two bases relate →

FY26 Request · $345.0M TOA − $145.0M J-book line = 200.0M (345.0145.0 = 200.0)

Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order so the direction of travel is readable at a glance: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order so the direction of travel is readable at a glance: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $46.7MFY25: $59.6MFY26: $345.0MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$46.7M
FY25$59.6M
FY26$345.0M

All series figures: R-1 TOA · PB2026

Decade view — P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2015 actuals — PB2017 editionFY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2016 enacted — PB2017 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2017 request — PB2017 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY15FY18FY20FY22FY24FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$94.5M$93.5M$115.1M$214.1M$186.0M$118.6M$92.5M$106.0M$82.3M$46.7M
Enacted$86.8M$114.5M$212.4M$193.2M$115.1M$94.4M$107.4M$84.5M$47.5M$59.6M
Request$114.5M$212.4M$178.5M$137.3M$121.8M$87.9M$71.8M$47.5M$74.2M$345.0M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2021 book requested $121.8M for FY2021; the PB2023 book reported $92.5M as actual total obligation authority — $29.2M below the request. 92.55121.76 = -29.21 USD millions — the compact figures above are rounded for reading.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission Ship Self Def (Engage: Hard Kill)

This program element provides funding for the development of systems that fulfill a portion of the third phase of the Ship Self Defense: Engage Hard Kill. Development in this line will focus on hard kill capabilities in which missiles and other munitions are used to intercept incoming Anti-Ship Cruise Missiles (ASCM), as well as a Surface-to Surface Strike weapon system. System improvements are being addressed via Rolling Airframe Missile (RAM) (0167), NATO SEASPARROW Missile System (NSSMS) (0173), Over-The-Horizon (OTH) missile (2070), Afloat Counter-Unmanned Aerial Systems (C-UAS) (2077), and MK-15 Close-In Weapon System (CIWS) (9081).

Mission 5in Rolling Airframe Missile

The Rolling Airframe Missile (RAM) program is an international cooperative program with the government of the Federal Republic of Germany. The purpose of this program is to develop, test, and field a surface-to-air self-defense system consisting of both a missile and launcher. The latest fielded variant, the RAM Block 2B, defends against highly maneuverable Anti-Ship Missile (ASM) threats and emerging complex raid attacks utilizing an advanced seeker and missile-to-missile link while retaining all the proven capabilities of previous RAM variants (Block 0/1/1A/2/2A); accurate terminal guidance, proven lethality, and post-launch fire and forget capability. FY 2026 through FY 2030 efforts are as follows: 1) Complete integration of the latest RAM Guided Missile Weapon System (GMWS) into the Ship Self-Defense System (SSDS) Baseline (BL) 12 and Aegis Combat System. This will enable the fleet to deploy the full capability of the RAM Block 2B missile which entered production in FY 2023. 2) Continue the RAM "Performance Lab" which identifies improvements for incorporation through real-world events, trade studies, modelling and simulation, experiments, and test firings. 3) Continue the RAM Software Factory to provide end users with rapid missile software updates to address emerging threats. 4) Develop the Ship to Missile Uplink/Downlink (Stowed Kill Improvement Project (SKIP)). SKIP will utilize missile uplinks to provide the missile with continuous data from the combat system to improve mid-course and increase the probability of kill against complex raids. SKIP downlink will provide data back to the combat system to improve kill assessment fidelity. These system performance and efficiency improvements will be leveraged to decrease the required missiles per threat therefore increasing stowed kills per launcher. This capability will apply to both the MK 49 RAM launcher and the MK 15 SeaRAM launcher.

Mission NATO Sea Sparrow

This project encompasses eight (8) primary efforts to enhance ship self-defense: 1. ESSM System Integration and Test: Evolved SEASPARROW Missile (ESSM) Blk 1 and Block 2 is a cooperative effort among the 12 NATO SEASPARROW Project Consortium Nations including the U.S. to provide crucial battlespace defense and fire power against the fast, low altitude, highly maneuverable Anti-Ship Cruise Missile (ASCM) threat. Modifications were made to increase capacity by employing a four ESSM QuadPack in a single MK 41 Vertical Launch System (VLS) cell on DDG 51 Class Guided Missile Destroyers, CG 47 Class Guided Missile Cruisers, and the NATO SEASPARROW Surface Missile System (NSSMS) fielded onboard CVN 68 and CVN 78 Class Aircraft Carriers, LHD 1 and LHA 7 Class Multipurpose Amphibious Assault Ships. Major testing campaigns this year includes ESSM Block 2 Initial Operational Test and evaluation (IOT&E) Phase 2, which will continue the IOT&E test campaign, leading to the Full Rate Production Decision. Enterprise testing with SSDS BL 12 on the Self Defense Test Ship and lead ships CVN 79 and LHA 8. Both ESSM Block 1 and ESSM Block 2 will be used for Enterprise testing. 1.1 Block 2 Follow-on Test & Evaluation (FOT&E): The ESSM Blk 2 Milestone Decision Authority (MDA) mandated that ESSM Block 2 conduct FOT&E on Ship Self-Defense System (SSDS) platform and fully support DDG Flight III operational testing. There will be planning efforts to support US Combat Systems integration verification and flight testing including but not limited to: AEGIS Baselines 9 and 10, SSDS Baseline 12 (on SDTS CVN 79 and LHA 8), and FFG platform integration testing. All integration verification testing includes support with appropriate ESSM Block 2 Missile Simulator Unit (MSU) with operator support. 2. NATO SEASPARROW Technical Direction Agent (TDA): The MK 57 NATO SEASPARROW Surface Missile Systems (NSSMS) provides a rapid response, integrated, self-defense missile capability. The TDA provides systems engineering and technical support for the MK 9 Tracker-Illuminator System (TIS), and MK 29 Guided Missile Launching System (GMLS). The TDA is tasked with providing studies, analysis, prototyping, and evaluations of hardware and software improvements. This task encompasses requirements development and assessment, artifact and document reviews, technical meeting participation, test requirement development, analysis for test and system integration events, and post-test analysis. 3. ESSM Technology Roadmap Analysis & Prototyping support: The ESSM Block 2 Missile completed development in 2021, achieved Initial Operational Capability in December 2021 and transitioned to production and in-service phases. In order to achieve performance not realized during the execution of Engineering and Manufacturing Development (EMD), pace the threat, and remain a viable weapon system, the ESSM Block 2 and its supporting combat system components require continual improvements. This effort will perform studies to identify technology candidates, explore new manufacturing techniques and technologies, and determine applicability to the NATO SEASPARROW Project Office (NSPO) managed Combat System Elements for future hardware or software improvements to either the Consortium's combat systems or the missile, or both. Tasking includes development and maintenance of an ESSM System roadmap and support specific studies to determine candidate combat system and/or missile performance and manufacturing efficiency improvements. Computer simulation updates will be needed to support the performance studies for future improvements. 4. Other Development (Block 2 Obsolescence and Redesign, Combat System Test Bed (CSTB) and Digital Datalink): CSTB is the end-to-end integration of CS element models using Higher Level Architecture (HLA) to help assess a ship's ability to defend itself. CSTB is maximizing the use of tactical code-based models in conjunction with physics-based environmental models to represent at sea performance of ships and their combat systems. CSTB supports a system of systems modeling for multiple use cases including System Development, System Integration, Developmental Test (DT) or Operational Test (OT) for a variety of ships and weapon systems. This effort is to integrate ESSM Block 2 Tactical Simulation (ETS) model into the CSTB and Enterprise Testbed. This effort also includes improvements required to be made in ETS based on the studies exploring missile launcher and MK 9 Tracker Illuminator System (TIS) redesign in order to respond to obsolescence issues affecting ESSM systems on all CVN, LHA, and LHD class ships. 5. Evolved SEASPARROW Missile (ESSM) Block 2 Software Upgrades: The ESSM Block 2 Missile completed development in 2021, achieved IOC in December 2021 and transitioned to in-service. In order to pace the threat/new threat environments, maintain alignment with planned production technology refresh, and meet national requirements, the missile requires software improvements to provide performance updates and fixes and new capabilities. The software updates will be identified as a result of Initial Operational Test and Evaluation (IOT&E) phase 2 and during Runs for the Record (RfR) that will be completed in support of Full Operational Capability (FOC), from performance improvements studies, identified software trouble reports, and during Final Operational Test and Evaluation (FOT&E) flight test results and as a result of new hardware and combat system changes. These software changes form the first opportunity to improve the baseline ESSM Block 2 missile and will be delivered as software updates employing agile software management principles, which will allow for correction of deficiencies identified through Initial Operational Test and Evaluation and support the completion of FOT&E objectives. 6. C-Band Telemetry Upgrade: Director Operational Test and Evaluation (DOT&E) directed operational testing in Aegis Capability Baseline (ACB)-20 requires multiple missiles in flight simultaneously to assess stream raids by threat systems. Current SM-6 and ESSM Block 2 Telemeters operate in the S-band where Radio Frequency (RF) bandwidths are limited for Telemetry (TM) data collection on the range. The current spectrum allocation and range infrastructure does not support TM collection for the number of missiles simultaneously in flight required to support ACB 20 TEMP (Test and Evaluation Master Plan) on range. The new requirement is due to the large number of missiles to support planned testing. The weapons and range are required to move telemetry into the C-Band where bandwidth exists to support required TM collections. 7. NATO SEASPARROW Tracker-Illuminator System (TIS) Development: The MK 57 NATO SEASPARROW Surface Missile System (NSSMS) supports the SEASPARROW missile semi-active missile requirement with a Continuous Wave Tracking Illuminator (CWTI) as the heart of the MK 9 Tracker-Illuminator System (TIS). The MK 9 TIS provides fire control tracking data to the SSDS combat system, including against high elevation angle threats. The OT-234/S Transmitter Group eliminates obsolescence issues and increases the Radio Frequency (RF) power output to provide improved tracking, with uplink, performance, and higher ESSM probability of guidance (PG) on low RADAR Cross Section (RCS) threats. Additionally, a replacement of 1960's United States Air Force (USAF) Radar Test Set (RTS) adapted for the United States Navy (USN) will be required to fulfill maintenance requirements and enhance additional frequency selections and ensure post-launch RF missile support for noise and uplink requirements. 8. Adaptable Deck Launcher (ADL) (formerly Next Generation Launching System (NGLS): The purpose of the ADL effort is to develop, qualify, test, and integrate a replacement to the 50+ year old legacy MK 29 Guided Missile Launching System (GMLS) for large deck, capital warships including CVNs, LHAs, and LHDs. ADL will double ESSM capacity over the current MK 29 GMLS while maintaining current shipboard locations. The new launching system will allow significantly more flexibility for ESSM Block 1 and 2 in different loadout configurations with available inventory. This replacement will improve environmental protection for Guided Missile Assemblies (GMA) (reducing corrosion), reduce manning requirements for loading/unloading operations, mitigates long term supportability issues, addresses obsolescence, reduce the life cycle costs, and reduce the cost and time for ESSM in-service refurbishment or re-certification. The ADL replacement contains design margin to allow for ESSM evolutionary growth within the MK25 canister. The MK 29 GMLS capacity is limited for ESSM Block 2 deployment.

Mission OTH Missile

Over-The-Horizon (OTH) Missile funds competitive acquisition, testing, integrating and fielding of a modern, technologically mature Over-the-Horizon Missile Launch System (OTH-MLS) surface to surface missile capability will be installed onto commissioned and in-production Littoral Combat Ship Variants/Frigate(LCS/FFG)beginning FY 2019.

Mission Afloat C-UAS

Afloat Counter Unmanned Aerial Systems (C-UAS) was established to meet an urgent operational need and funds the acquisition, testing, integration, and fielding of prototype C-UAS's to provide a lower cost defense in-depth solution to negate the UAS threats. The FY 2026 discretionary $39.407 million will fund long lead items for the C-UAS systems. Once additional funds are received, the Navy will accelerate new capability integration and fielding to the Fleet.

Mission Phalanx CIWS SEARAM

The MK 15 MOD 40 Close in Weapon System (CIWS) RAM Defense Capability (CRDC) configuration is fielded aboard Nimitz Class Carriers (CVN). It is a fast reaction, rapid fire, computer-controlled radar system that employs the Rolling Airframe Missile (RAM) as an effector for Anti-Ship Missile (ASM) defense. The MK 15 MOD 40 CIWS (CRDC) configuration was fielded in FY 2020, limited to the RAM BLK 2 missile variant. The purpose of this project is to develop and integrate the latest RAM missile variant (BLK 2B) into the MK 15 MOD 40 baseline. The RAM Block 2B missile defends against highly maneuverable Anti-Ship Cruise Missile (ASCM) threats and emerging complex raid attacks utilizing an advanced infrared (IR) seeker and Missile-to-Missile Link (MML) while maintaining all the proven capabilities of previous RAM variants (BLK 2): accurate terminal guidance, proven lethality, and post-launch fire and forget capability. Without this effort the Nimitz class carriers will be unable to utilize the latest and most capable RAM Block 2B missile which entered production in FY 2023.

Justification

No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.

Budget Line Items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, NavyNFY24 Actuals$46.7M
Research, Development, Test and Evaluation, NavyNFY25 Enacted$59.6M
Research, Development, Test and Evaluation, NavyNFY25 Total$59.6M
Research, Development, Test and Evaluation, NavyNFY26 Disc. Request$145.0M
Research, Development, Test and Evaluation, NavyNFY26 Reconciliation$200.0M
Research, Development, Test and Evaluation, NavyNFY26 Total$345.0M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget Figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$681.8M$46.7M$59.6M$145.0M$145.0M
0167: 5in Rolling Airframe Missile$376.3M$10.7M$19.2M$15.2M$15.2M
0173: NATO Sea Sparrow$229.8M$30.0M$31.8M$81.4M$81.4M
2070: OTH Missile$75.8M$6.04M$2.04M$1.83M$1.83M
2077: Afloat C-UAS$0$0$0$39.4M$39.4M
9081: Phalanx CIWS SEARAM$0$0$6.65M$7.21M$7.21M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1,741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Ship Self Defense (Engage: Hard Kill) — no program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

No research dossier for this program — dossiers cover 50 of 1,741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →