Skip to content
Fiscal Receipts

C2IMERA

Air ForceRDT&EReconciledPE0305836F
Watch this program

Published budget signals for this program, with links to receipts.

Updates appear after a data refresh and publication. No fixed update schedule is available.

Paste the RSS address into a feed reader. No Fiscal Receipts account is required.

RSSAtom

What it is
C2IMERA (0305836F) is an Air Force research & development line funded in the Research, Development, Test and Evaluation, Air Force account. Its J-book detail breaks the line into 1 project.
What changed
No FY25→26 comparison — endpoints unavailable or on different bases.
Who gets it
No single contractor is published as this line's leader. 1 linked award record is listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$0J-book detail · PB2026
FY25 Enacted
$0J-book detail · PB2026
FY26 Request
$13.9MR-1 TOA · PB2026
FY25→26 Change
No comparison: endpoints unavailable or on different bases
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $0FY25: $0FY26: $13.9MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$0J-book detail · PB2026
FY25$0J-book detail · PB2026
FY26$13.9MR-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

One fiscal year of this program as published: a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line is too short to show a direction. The grid below is the same data as text, one cited figure per cell.
One fiscal year of this program as published: a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line is too short to show a direction. The grid below is the same data as text, one cited figure per cell.FY2026 request — PB2026 editionFY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY26
Request$13.9M

blank = series not published for this year; – = absent from that edition.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — C2IMERA

This budget line funds the development of the Command and Control, Incident Management, Emergency Response Application (C2IMERA), a C2 system that enables commanders and staffs to generate and present ready forces to combatant commanders at the tactical, operational, and strategic levels. C2IMERA funds provide enhanced installation C2 that improves decision speed, quality, and lethality by incorporating direct user inputs, connecting people to information, automating daily operations, and integrating data from myriad systems into a real-time, interactive Common Operating Picture (COP) with visualized dashboards. C2IMERA enables mission-ready units of action to support Agile Combat Employment by effectively linking combat wings and base commands, enabling bases to successfully operate during competition, crisis, and conflict. C2IMERA synchronizes information across large scale exercises and operations through the implementation of a COP and tool that streamlines daily operations and reporting. C2IMERA aggregates the theater-wide critical information into strategic and operational pictures that enable Higher Headquarters (HHQ) to make real-time force decisions across the competition continuum. C2IMERA accelerates decision makers' access to C2 information by providing automated updates through the COP/email and alleviating the need for unnecessary briefings, meetings, and radio communication(s). The C2IMERA operational concept has three capability areas: • C2 collaboration across the Wing, enabling the base to operate and fight • Wing Situational Awareness, enabling the wing to integrate across operations • Wing Collaboration/reporting to HHQ (i.e., Air Operations Center (AOC), the Air Force Forces (AFFOR), Command Center etc.), enabling high-quality operational and strategic decision making Requirements also include supporting base operations, mission management and monitoring, HHQ Information Exchange Requirements (IERs), Emergency Action Messaging, Situation Report (SITREP) automation, and other key enablers supporting the operational concept. Efforts within this PE align with USAF investment in Mission Planning Systems (PE 0208006F), Air Operations Center (0207410F), All Domain Common Platform (0303248F), and ABMS (0604003F) to deliver the Theater Air Planning System of Systems (TAP-SoS) architecture for the DAF BATTLE NETWORK. FY 2026 funds will continue to support Agile development and operations enabling the delivery of new advanced features to C2IMERA following the FY 2025 completion of the codebase re-architecture from a monolithic codebase to a microservices based, multi-tenant application. FY 2026 funds will integrate C2IMERA across the DAF Battle Network, expand data access through system interoperability and new systems integrations, automate data inputs and workflows, and improve coalition warfighting capabilities through expanded information availability. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program funding would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, or 0605898F. Due to being a new Program Element in FY 2026, civilian pay expenses in this program element will begin in FY 2026. For reference, this program is transferring from 0305015F where in FY 2024 0.281 million was expended for civilian pay expenses, and in FY 2025 0.226 million is forecasted for civilian pay expenses. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year.

Justification

Accomplishments & Planned Programs (1)

Command and Control, Incident Management, Emergency Response Application (C2IMERA)

C2IMERA will improve Installation command and control by connecting people, integrating data, and automating daily operations. The aggregation of theater data and activities enhances Operational C2 as well as increases decision speed and operational advantage. This is accomplished by incorporating direct user feedback, connecting people, automating daily operations, and integrating data from myriad systems. C2IMERA receives input from users and system interfaces and the data is displayed on the real-time, interactive common operational picture (COP). C2IMERA provides automated updates via the COP, as well as notifications via emails and alerts, alleviating the need for briefings, meetings, and radio communication(s).

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, Air ForceFFY26 Disc. Request$13.9M
Research, Development, Test and Evaluation, Air ForceFFY26 Total$13.9M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$0$0$0$13.9M$13.9M
675219: C2IMERA$0$0$0$13.9M$13.9M

Follow the dollar

Appropriation → program element → top high-confidence awards → recipient families → congressional districts.

Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →

The program's money traced left to right: the F appropriation, program element 0305836F (C2IMERA), its 2 largest high-confidence awards, the 1 recipient family behind them, and the 2 congressional districts the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.
The program's money traced left to right: the F appropriation, program element 0305836F (C2IMERA), its 2 largest high-confidence awards, the 1 recipient family behind them, and the 2 congressional districts the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.APPROPRIATIONPROGRAM ELEMENTTOP AWARDSRECIPIENT FAMILIESDISTRICTSFRDT&E appropriation0305836F13.9M FY26FA873019F0012LEIDOS INC79.7MFA873019F0012LEIDOS INC1.76MLeidos Holdings, Inc.VA-11IN-07

The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.

The diagram as text: one row per congressional district in the diagram, the recipient families shown there, and that district's cited program obligations.
DistrictProgram obligations
VA-11$75.9M
IN-07$1.76M

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

RecipientPIIDConfidence
LEIDOS INCFA873019F0012high

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not C2IMERA. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.