Printed from https://fiscalreceipts.com/program/0207161F/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Tactical AIM Missiles
Watch this program
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $40.5M |
| FY25 | $34.9M |
| FY26 | $86.5M |
All series figures: R-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $28.8M | $33.6M | $51.5M | $36.3M | $29.0M | $10.0M | $18.8M | $31.9M | $33.4M | $40.5M | ||
| Enacted | $43.4M | $52.9M | $35.0M | $37.2M | $10.3M | $19.4M | $33.0M | $34.5M | $42.0M | $34.9M | ||
| Request | $52.9M | $35.0M | $37.2M | $10.3M | $19.4M | $33.0M | $34.5M | $42.0M | $34.9M | $86.5M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2019 book requested $37.2M for FY2019; the PB2021 book reported $29.0M as actual total obligation authority — $8.19M below the request. 29.0 − 37.2 = -8.2 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — AIM-9 Product Improvement
The AIM-9X Block II Sidewinder (AIM-9X Blk II) continues the evolution of the AIM-9 series of missiles. This missile program delivers a launch and leave, air combat munition that uses passive Infrared (IR) energy to acquire and track enemy air targets and complements the radar guided Advanced Medium Range Air-to-Air Missile (AMRAAM). The missile provides fighter aircrew with the first shot, first kill opportunities that are essential for survival during air combat maneuvering in the visual arena. The AIM-9X delivers these opportunities with unmatched offensive and defensive capabilities against inner boundary threats, even when IR countermeasures are employed. The AIM-9X also supports air superiority in the Beyond Visual Range air-to-air battle. Anti-tamper features have been incorporated to protect improvements inherent in this design. The AIM-9X Block II missile provides the Joint Force with fighter aircraft lethality and survivability necessary to counter threats identified in the National Defense Strategy. AIM-9X is a Post Milestone C, Acquisition Category IC joint service program led by the Department of the Navy. The Block II program has completed independent operational testing and was found to be operationally effective and suitable. The program achieved Initial Operational Capability in March 2015 and received Full Rate Production decision in August 2015. This budget line item continues technical refresh hardware and software and develops advanced capabilities to meet requirements of the Capability Production Document against evolving threat aircraft countermeasures and unmanned aircraft systems. This program element leverages Digital acquisition tenets of open, agile and digital. This may include providing funds to prime contractors; program office contract support; facility, security and IT upgrades; common component development with other weapon systems to reduce redundant costs. The FY 2026 request was reduced by -$.841 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, Implementing the President's Department of Government Efficiency Cost Efficiency Initiative. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program's funds would be in addition to the civilian pay expenses budgeted in program element 0605827F, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, or 0606398F. In FY 2024, 100K were expended for civilian pay expenses in this program element, and in FY 2025, 100K are forecasted for civilian pay expenses in this program element. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year.
Justification
Accomplishments & Planned Programs (3)
AIM- 9X Product Development
Continuation of Primary Hardware Development/Pre-Planned Product Improvement (technical refresh) efforts for the AIM-9X weapon system. This includes systems engineering and program management, as well as support required to ensure AIM-9X missile integration with US military aircraft platforms. This also includes efforts to redesign Block II missile components to mitigate obsolescence, ensure producibility and increase reliability. It will incorporate anti-tamper and cyber security technology improvements, and address hardware and software improvements to facilitate follow-on capability. In addition, the program will evaluate and begin risk reduction efforts that will address hardware and software improvements to facilitate follow-on capability and mitigate obsolescence.
Counter Unmanned Aircraft Systems Development
Advance major component technology, including seeker, warhead, and fuzes to address pacing threats of adversary Unmanned Aircraft Systems while reducing risk across future AIM weapons.
AIM-9X, Test and Evaluation
Test and Evaluation (T&E) and associated governmental support required to ensure the AIM-9X missile integration with US Air Force aircraft platforms. Developmental and Operational testing of OFS.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Air Force | F | FY24 Actuals | $40.5M |
| Research, Development, Test and Evaluation, Air Force | F | FY25 Enacted | $34.9M |
| Research, Development, Test and Evaluation, Air Force | F | FY25 Total | $34.9M |
| Research, Development, Test and Evaluation, Air Force | F | FY26 Disc. Request | $86.5M |
| Research, Development, Test and Evaluation, Air Force | F | FY26 Total | $86.5M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $317.6M | $40.5M | $34.9M | $86.5M | $86.5M |
| 674132: AIM-9 Product Improvement | $317.6M | $40.5M | $34.9M | $86.5M | $86.5M |
Follow the dollar
Appropriation → program element → top high-confidence awards → recipient families → congressional districts.
Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →
The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.
| District | Program obligations |
|---|---|
| AZ-07 | $275.6M |
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
| Recipient | PIID | Confidence |
|---|---|---|
| RAYTHEON COMPANY | N0001915C0121 | high |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Tactical AIM Missiles. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J681
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2017 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J588
Complete workbook · unchanged saved copy. Saves as PB2017_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2018 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J670
Complete workbook · unchanged saved copy. Saves as PB2018_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2019 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J694
Complete workbook · unchanged saved copy. Saves as PB2019_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2020 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J693
Complete workbook · unchanged saved copy. Saves as PB2020_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2021 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J715
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J680
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J652
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J643
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J663
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
FY2026 Air Force Research and Development Test and Evaluation, Vol. I · www.saffm.hq.af.mil
PDF page 20