T-1
Watch this program
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $9.85M |
| FY25 | $2.21M |
| FY26 | $137.0K |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $872.0K | $6.26M | $9.85M | ||
| Enacted | – | $6.26M | $10.9M | $2.21M | |
| Request | – | – | $10.9M | $2.21M | $137.0K |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $10.9M for FY2024; the PB2026 book reported $9.85M as actual total obligation authority — $1.10M below the request. 9.85 − 10.95 = -1.10 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — T-1
The T-1A is a missionized Beech 400A used in the Airlift/Tanker track of the USAF Specialized Undergraduate Pilot Training (SUPT) and in Combat Systems Officer (CSO) training for Air Education and Training Command (AETC). It is powered by two Pratt and Whitney JT15D-5 turbofan engines mounted on the aft fuselage producing 2,900 pounds of thrust each. Avionics include Ultra High Frequency (UHF) and Very High Frequency (VHF) radios, Inertial Navigation System (INS), Tactical Air Navigation (TACAN), Airborne Direction Finder (ADF), and two Very High Frequency Omni Range/Instrument Landing System (VOR/ILS). Aircraft modified for CSO training include a Global Positioning System (GPS)-driven synthetic radar and simulated Radar Warning Receiver (RWR) in the right seat flight deck position to be utilized by the student CSO. A second student station and a second instructor station have also been added in the rear of the aircraft. The remaining fiscal years are critical for AETC to execute the Air Mobility Fundamentals-Simulators (AMF-S) mission under UPT 2.5. Funding may be used to address Diminishing Manufacturing Sources and Material Shortages (DMSMS) issues, Program Support Costs, and studies. Funding is required for the Execution of Federal Aviation Administration Service Bulletins (SBs), Airworthiness Directives (ADs), and Product Improvements as required/mandated. To ensure airworthiness of T-1A aircraft, for low-cost modifications, maintaining training simulators and to extend the service life of the weapon system. Funding for this exhibit contained in PE 0804741F & 0804742F. This modification supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D
Justification
Justification — T-1
FY 2026 funding is required Low Cost Modifications.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Aircraft Procurement, Air Force | F | FY24 Actuals | $9.85M |
| Aircraft Procurement, Air Force | F | FY25 Enacted | $2.21M |
| Aircraft Procurement, Air Force | F | FY26 Disc. Request | $137.0K |
| Aircraft Procurement, Air Force | F | FY26 Total | $137.0K |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $99.8M | $9.85M | $2.21M | $137.0K | $137.0K |
Follow the dollar
Appropriation → program element → top high-confidence awards → recipient families → congressional districts.
Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →
The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.
| District | Program obligations |
|---|---|
| OK-03 | $94.4M |
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
| Recipient | PIID | Confidence |
|---|---|---|
| ASES LLC | FA810618C0002 | high |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not T-1. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O888
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O857
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O903
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
FY2026 Air Force Aircraft Procurement, Vol. I · www.saffm.hq.af.mil