Budget figures
No FY2026 R-1/P-1 request line for this program element. The FY2026 President's Budget request workbook carries no FY2026 line for it; its last workbook figure is FY2024. The PB2026 J-book detail below does carry an FY2026 row for this line, recorded as zero. A workbook blank and a documented zero are different records, and this page shows both. An absent line is not by itself an ending — PB2026 renumbered program elements at scale across the services and defense agencies, so this work may continue under a different number. No successor is linked for this line: this site's program-lineage layer holds no keyed edge pointing forward from here. That is an absence in this site's lineage layer, not a finding about the program: if the J-book narrative on this page describes a realignment, it is quoted below in the document's own words, and this note does not restate it.
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $1.05MP-1 TOA · PB2026 |
| FY25 | $0J-book detail · PB2026 |
| FY26 | $0J-book detail · PB2026 |
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 |
|---|---|---|---|
| Actuals | $103.7M | $1.04M | $1.05M |
| Enacted | – | $1.04M | $1.05M |
| Request | – | – | $1.05M |
blank = series not published for this year; – = absent from that edition.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Predator Hellfire Missile
In FY2024, PRDTA2, Hellfire was completed and no future procurements are expected The Army is the Lead Service for the HELLFIRE Missile program with Air Force missiles being procured through the Army's Redstone Arsenal. HELLFIRE missiles (all variants) provide precision-kill capability and has become a key weapon in overseas operations. Laser HELLFIRE uses semi-active laser terminal guidance. The latest variant provides for point target precision strike and is effective against countermeasures. The HELLFIRE missiles are used by the MQ-9 Reaper aircraft. HELLFIRE procurement funding supports the entire HELLFIRE system to include resolution of obsolescence, end-of-life buys, safety, insensitive munitions, reliability, weapon integration activities, test sets, engineering changes, modifications, facilitation, production ramp-up activities and production issues. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. HELLFIRE unit cost may vary based on procurement quantities of Lead Service, other Services and/or Foreign Military Sales (FMS) for HELLFIRE. Prior to FY08, HELLFIRE missiles were procured under the Predator PE 0305219F. Note: These funds may also procure inventoried items which may not be procured on an annual basis and could be required on an emerging basis. Variations to cover critical shortfalls to inventory objectives as well as actual and planned expenditures will be addressed during execution year. Procurement quantities can change based on negotiated options/pricing bands and available funding, in accordance with Title 10, U.S Code Section 2308 BUY-TO-BUDGET ACQUISITION. Procurements for the execution year may vary due to changes in inventory objectives. Combatant commanders' requirements for Operational Plans influence these objectives, which are updated throughout the year. Funds may be used to address production Diminishing Manufacturing Sources (DMS)/Material Shortages/Obsolescence issues through studies, bridge buys, life of type buys, supplier/parts replacement, to include electronic components used commercially and in short supply, and qualification activities to preserve future production capabilities and capacities. Funding for this exhibit contained in PE 0201109F.
Justification
Justification — Predator Hellfire Missile
There is no FY26 budget request.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Missile Procurement, Air Force | F | FY24 Actuals | $1.05M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|
| Program Element | $1.05M | $0 | $0 | $0 |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Predator Hellfire Missile. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O969
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O932
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O986
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
FY2026 Air Force Missile Procurement · www.saffm.hq.af.mil
PDF page 169