Ground Based Strategic Deterrent

FProcurementPartial ReconciliationMGBSD0
What it is
Ground Based Strategic Deterrent — a procurement program run by Air Force.
What changed
No FY25→26 comparison — trajectory data incomplete for this line.
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$0
FY25 Total
FY26 Request
$0
FY25→26 Change

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory

Insufficient trajectory data for sparkline (only FY26 available).

Decade view — each figure cites its own President's Budget edition
FY2022 actuals — PB2024 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2024 request — PB2024 editionFY2026 request — PB2026 editionFY22FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY22FY23FY24FY25FY26
Actuals$8.89M
Enacted$0$539.3M
Request$539.3M$0

blank = series not published for this year; – = absent from that edition.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description Ground Based Strategic Deterrent

The Secretary of Defense's Nunn-McCurdy decision on July 8, 2024 recertified the LGM-35A Sentinel program. The Milestone Decision Authority rescinded the 2020 Milestone B decision which allows the Program Office to focus on the reassessment and refinement of requirements as they translate to system specifications, technical maturation of the system design, and cost and schedule risk mitigation strategies. The Program Office will work with stakeholders to update program requirements, quantities, and milestones to align with the outcomes of the reassessments and refinements. To differentiate between Sentinel Systems Directorate and the Ground Based Strategic Deterrent (GBSD) now known as the Sentinel program, the GBSD program has been designated as the LGM-35A Sentinel. The LGM-35A Sentinel incorporates the Sentinel weapon system which is called out in related Sentinel System Directorate portfolio programs that includes Intercontinental Ballistic Missile (ICBM) Reentry Vehicles and ICBM Fuze Modernization. The LGM-35A Sentinel will produce and deploy a replacement for the current Minuteman III (MM III) Intercontinental Ballistic Missile (ICBM) weapon system in order to maintain a safe, secure, reliable, and effective nuclear deterrent. The LGM-35A Sentinel program delivers a fully integrated weapon system to lower lifecycle costs and to close key capability gaps and vulnerabilities identified in the LGM-35A Sentinel Capabilities Based Assessment, LGM-35A Sentinel Capabilities Development Document, and the LGM-35A Sentinel Analysis of Alternatives. Sentinel mitigates ground based deterrent degradation due to MM III component age-out and attrition. The LGM-35A Sentinel program includes prime contractor development of applicable support equipment, data, flight test hardware and infrastructure, and training systems material, as well as examination and mitigation of risk during the MM III to LGM-35A Sentinel transition. This program includes nuclear surety certification and system vulnerability assessments. During the now-rescinded Engineering and Manufacturing Development (EMD) phase, the LGM-35A Sentinel program executed 1) government system engineering, analytics, and test capability development; 2) air vehicle equipment development; 3) command & launch systems development; 4) infrastructure and deployment development; 5) support systems development; and 6) weapon system integration. While the program has reverted to a pre-Milestone B posture, activities that were conducted in EMD are still being performed. The Air Force developed a new Aerospace Vehicle Equipment (AVE) (flight system) for the LGM-35A Sentinel weapon system to replace the MM III flight system. The LGM-35A Sentinel AVE consists of a boost propulsion subsystem, a post-boost propulsion subsystem, a guidance, navigation, and control (GN&C) subsystem, and a re-entry subsystem. The boost propulsion subsystem is comprised of a 3-stage solid rocket booster. The post-boost propulsion subsystem (PBPS) is comprised of a liquid-fueled rocket propulsion system integrated into a post-boost attitude control module (PBACM) structure, as well as all guidance, navigation, and control components. Milestone dates are subject to change due to acquisition strategy revisions. The event schedule updates will be provided once the revisions are completed. Funding for this exhibit is contained in PE 0101233F.

Justification

Justification Ground Based Strategic Deterrent

No FY2026 funding requested.

Budget Line Items(workbook-cited)

Exhibit P-1

AccountOrgTypeAmount
Missile Procurement, Air ForceFFY26 Disc. Request$0
Missile Procurement, Air ForceFFY26 Total$0

Budget Details(R-2/P-40 facts)

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$0$0$0$0$0

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.