Printed from https://fiscalreceipts.com/program/MD65/ — data as of August 12, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Defense of Guam Procurement
Budget Figures
$11.4M discretionary + $56.5M one-time reconciliation. Discretionary change vs FY2025 enacted: -49.8%.
Two official figures, one label— reconciled below
Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows (such as advance procurement) that the R-2/P-40 J-book program line excludes. How the two bases relate →
FY26 Request · $67.9M TOA − $11.4M J-book line = 56.5M (67.9 − 11.4 = 56.5)
Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
| Fiscal year | Amount |
|---|---|
| FY24 | $161.6M |
| FY25 | $22.6M |
| FY26 | $67.9M |
All series figures: P-1 TOA · PB2026
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $80.0M | $26.5M | $161.6M | ||
| Enacted | – | $26.5M | $169.6M | $22.6M | |
| Request | – | – | $169.6M | $22.6M | $67.9M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $169.6M for FY2024; the PB2026 book reported $161.6M as actual total obligation authority — $8.00M below the request. 161.6 − 169.6 = -8.0 USD millions — the compact figures above are rounded for reading.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Defense of Guam Procurement
The fiscal year (FY) 2026 request for Defense of Guam Procurement includes $11.4 million of discretionary and $56.5 million of mandatory (reconciliation) for a total of $67.9 million. The mandatory funds provide for the procurement of S-band Missile Communication Radar and Cooperative Engagement Capability System. Further information for this reconciliation request is provided in Section 20003 (Missile Defense) of the Reconciliation Exhibit. In addition, FY 2026 Pacific Deterrence Initiative (PDI) funding has increased by $45.249 million. The Missile Defense Agency (MDA) in coordination with the Guam Defense System Joint Program Executive Office is developing a Missile Defense System for Guam defense against a range of missile threats. The Department of Defense has undertaken studies on a range of missile defense architecture options, emphasizing effectiveness, survivability, and flexibility against an evolving threat. The majority of the large material purchases needed for Aegis Weapon System; Command, Control, Communications, Computers and Intelligence (C4I) equipment; and Vertical Launching Systems (VLS) were purchased in FY 2022 - FY 2024. The activities in FY 2026 include development and integration efforts between MDA, United States (U.S.) Army, U.S. Navy , and U.S. Air Force systems, which includes a 360 degree persistent integrated air and missile defense Aegis Guam System with distributed Mk-41 Vertical Launching Systems, and a single Tactical Array Unit Army Navy/Transportable Radar Surveillance and Control-6 and missile uplink/downlink communications system for the Defense of Guam. The Guam Architecture will be commanded and controlled from the Joint Command Center with additional Integrated Air and Missile Defense Battle Command System; Aegis Guam System; Command and Control, Battle Management and Communications mission node and Tactical Operations Center - Light providing local continuity of operations. Initial Aegis Guam System capability was demonstrated on Guam in calendar year (CY) 2024. Aegis Guam System with additional Terminal Defense capability will be delivered in CY 2029.
Justification
Justification — Defense of Guam Procurement
This effort is part of the PDI. The FY 2026 request for Defense of Guam Procurement includes $11.4 million of discretionary and $56.5 million of mandatory (reconciliation) for a total of $67.9 million. The mandatory funds provide for the procurement of S-band Missile Communication Radar and Cooperative Engagement Capability System. Further information for this reconciliation request is provided in Section 20003 (Missile Defense) of the Reconciliation Exhibit. FY 2026 Procurement includes the procurement of the Cooperative Engagement Capability System. FY 2025 Procurement includes the material purchases to support the Defense of Guam architecture to support the initial deployment on the island in early FY 2025. Components include: - Ancillary equipment to include inertial navigation system tech refresh and spares. - Aegis Weapons System components to support Integrated Air and Missile Defense delivery in CY 2032 to include additional fire control system; identification, friend or foe system equipment; and spares. - C4I to include shipping containers and spares. FY 2024 Procurement included: - VLS to include launcher module enclosures, launcher control units, and support equipment. - Ancillary equipment to include power converters, data distribution system, inertial navigation system, gigabit Ethernet data multiplex system, universal control console, shipping containers, and support/test equipment. The above procurement quantity reflects procurement of a single overarching Aegis Guam System made up of multiple weapon system components. "Procurement Quantity" represents the Aegis Guam System that consists of Aegis Weapon System Equipment, Ancillary Equipment, C4I, and VLS.
Budget Line Items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Procurement, Defense-Wide | MDA | FY24 Actuals | $161.6M |
| Procurement, Defense-Wide | MDA | FY25 Enacted | $22.6M |
| Procurement, Defense-Wide | MDA | FY26 Disc. Request | $11.4M |
| Procurement, Defense-Wide | MDA | FY26 Reconciliation | $56.5M |
| Procurement, Defense-Wide | MDA | FY26 Total | $67.9M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget Figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $106.5M | $161.6M | $22.6M | $11.4M | $11.4M |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1,741 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Defense of Guam Procurement — no program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
No research dossier for this program — dossiers cover 50 of 1,741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →