Printed from https://fiscalreceipts.com/program/MAMRA0/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
AMRAAM
Budget figures
$365.1M discretionary + $300.0M one-time reconciliation. Discretionary change vs FY2025 enacted: -6.3%.
Two official figures, one label— reconciled below
Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows that the R-2/P-40 J-book program line excludes — advance procurement in an ordinary year, and in FY2026 the one-time reconciliation appropriation as well. Each row below names the one it is. How the two bases relate →
FY26 Request · $665.1M TOA − $365.1M J-book line = 300.0M (665.1 − 365.1 = 300.0) — $300.0M of one-time FY2026 reconciliation money accounts for this gap — not advance procurement
Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $540.7M |
| FY25 | $389.8M |
| FY26 | $665.1M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $326.4M | $371.1M | $540.7M | ||
| Enacted | – | $320.1M | $701.5M | $389.8M | |
| Request | – | – | $701.5M | $447.4M | $665.1M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $701.5M for FY2024; the PB2026 book reported $540.7M as actual total obligation authority — $160.7M below the request. 540.74 − 701.46 = -160.72 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — AMRAAM
The Advanced Medium Range Air-to-Air Missile (AMRAAM) is a joint United States Air Force (USAF)/United States Navy (USN), Acquisition Category 1C program with USAF as lead service. AMRAAM is the premier all-weather, all-environment radar guided missile with improved capabilities against very low and high-altitude targets in an electronic attack environment. The current AMRAAM AIM-120D3 variant delivers improved performance via Global Positioning System (GPS) aided navigation; two-way datalink capability for enhanced aircrew survivability and improved network compatibility; and incorporates new guidance software that improves kinematic performance and weapon effectiveness. FY 2026 continues procurement and support of AMRAAM for the USAF and USN in Lot 40. USAF funds anticipate procuring 226 AMRAAM missiles in support of warfighter requirements; however, USAF will buy-to-budget based on funding profile. Missile configurations may vary based on warfighter needs, which include assets used for training and Weapon System Evaluation Program (WSEP). Funding may be used to address Diminishing Manufacturing Sources and Material Shortages (DMSMS) issues. Funding for this exhibit contained in PE 0207163F. FY 2024 includes 53.103M Advance Procurement funds used to procure obsolete parts for future Lot buys. FY 2025 reflects a HAC-D mark of -57.603M for FY24 Carryover (Impacts: reduction in 50 AURs and/or funds to support Test Equipment modernization and unforeseen DMSMS efforts to support AUR builds and 1200/yr production) Tranche funding received via FY 2025 reprogramming actions that is not included in the FY 2025 Enacted Amount contained in the above FY 2026 PB P-40 Resource Summary Table. The tranche funding received in FY 2025 is as follows: - Ukraine Tranche 27: 12.5M for parts obsolescence - Ukraine Tranche 28: 112.949M for Lot 39 AURs - Israel Tranches 3 & 4: 69.172M for Lot 39 AURs The FY 2026 request for AMRAAM includes $365,125 thousand of discretionary and $300,000 thousand of mandatory (reconciliation) for a total of $665,125 thousand. The mandatory funds procure 257 AMRAAM D3 missiles in FY 2026. Further information for this reconciliation request is provided in Chapter 20004 (Munitions & Supply Chain) of the Reconciliation Exhibit. This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C Chapter 9A, Sec 240-D.
Justification
Justification — AMRAAM
FY 2026 continues procurement and support of AMRAAM for the USAF and USN in Lot 40. USAF funds anticipate procuring 226 AMRAAM missiles in support of warfighter requirements; however, USAF will buy-to-budget based on funding profile. Missile configurations may vary based on warfighter needs, which include assets used for training and Weapon System Evaluation Program (WSEP). Funding provides for test and technical production support, procurement of training equipment, and tooling/test equipment upgrades to support the AMRAAM configurations. Additionally, funding is used to resolve production Diminishing Manufacturing Sources and Material Shortages, obsolescence issues, studies, bridge buys, life of type buys, supplier/parts replacement and qualification activities to preserve future production capabilities and capacities. Note: Procurement quantities can change based on negotiated options/pricing bands and available funding, in accordance with Title 10, US Code Section 3069 BUY-TO-BUDGET ACQUISITION.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Missile Procurement, Air Force | F | FY24 Actuals | $540.7M |
| Missile Procurement, Air Force | F | FY25 Enacted | $389.8M |
| Missile Procurement, Air Force | F | FY26 Disc. Request | $365.1M |
| Missile Procurement, Air Force | F | FY26 Reconciliation | $300.0M |
| Missile Procurement, Air Force | F | FY26 Total | $665.1M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $11.2B | $540.7M | $389.8M | $365.1M | $365.1M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.
Showing 25 of 34 award records (this program's published budget→award crosswalk links — see methodology)
| Recipient | PIID | Confidence |
|---|---|---|
| CORNING INCORPORATED | FA867516M0140 | medium |
| CORNING INCORPORATED | FA867521P0001 | medium |
| RAYTHEON COMPANY | FA867515C0022 | medium |
| RAYTHEON COMPANY | FA867516C0044 | medium |
| RAYTHEON COMPANY | FA867516C0067 | medium |
| RAYTHEON COMPANY | FA867517F1038 | medium |
| RAYTHEON COMPANY | FA867517F1053 | medium |
| RAYTHEON COMPANY | FA867517F1060 | medium |
| RAYTHEON COMPANY | FA867518C0003 | medium |
| RAYTHEON COMPANY | FA867518F1001 | medium |
| RAYTHEON COMPANY | FA867518F1012 | medium |
| RAYTHEON COMPANY | FA867518F1013 | medium |
| RAYTHEON COMPANY | FA867518F1042 | medium |
| RAYTHEON COMPANY | FA867519F1001 | medium |
| RAYTHEON COMPANY | FA867519F1003 | medium |
| RAYTHEON COMPANY | FA867519F1006 | medium |
| RAYTHEON COMPANY | FA867519F1013 | medium |
| RAYTHEON COMPANY | FA867519F1014 | medium |
| RAYTHEON COMPANY | FA867519F1020 | medium |
| RAYTHEON COMPANY | FA867519F1021 | medium |
| RAYTHEON COMPANY | FA867519F1040 | medium |
| RAYTHEON COMPANY | FA867520C0033 | medium |
| RAYTHEON COMPANY | FA867520F1005 | medium |
| RAYTHEON COMPANY | FA867520F1016 | medium |
| RAYTHEON COMPANY | FA867520F1018 | medium |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not AMRAAM. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O965,O967
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O927,O928
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O980
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
FY2026 Air Force Missile Procurement · www.saffm.hq.af.mil
PDF page 143