Joint Strike Missile
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
- FY24
- $373.5M
- FY26
- $376.9M
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $0 | – | $373.5M | ||
| Enacted | – | $0 | $161.0M | $165.9M | |
| Request | – | – | $161.0M | $165.9M | $376.9M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $161.0M for FY2024; the PB2026 book reports $373.5M actually spent — $212.5M above the request.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Joint Strike Missile
Joint Strike Missile (JSM) is a near-term solution for long range precision strike capability against maritime surface and land targets in highly contested environments. JSM provides long-range standoff for platform survivability, performance in GPS denied environments, survivability against advanced threat systems, and internal carriage in F-35A weapons bay. Initial fielding and operational use will be on the F-35A. Integration on other platforms may occur during this time-frame as directed by ACC. Norwegian defense contractor, Kongsberg Defense & Aerospace (KDA), has completed development of JSM. Royal Norwegian Air Force (RNoAF) funded F-35A test and integration is ongoing and is required to support delta integration for USAF JSM on the F-35A. USAF will leverage the RNoAF test and integration efforts to gain confidence of JSM performance on F-35A and improve timeline for fielding. Additionally, USAF will perform additional tests needed for USAF fielding that include service specific test and integration, regression, and qualification activities as well as cyber security compliance. The JSM procurement funding supports the entire weapon system to include resolution of obsolescence, end-of-life buys, bridge buys, test assets, simulators, COMSEC components, GPS receivers, supplier/parts replacement, to include electronic components used commercially and in short supply, and qualification activities to preserve and increase future production capabilities and capacity. Procurement funding also supports engineering and technical support needed to produce, test, modify and field the JSM and support mission planning activities. Funding may be used to perform the USAF specific test and integration, regression, and qualification activities. Funding may also be used to address Diminishing Manufacturing Sources (DMS) issues and cyber security compliance requirements. USAF JSM OT&E is projected to begin May 2026 (subject to completion of F-35 JPO/RNoAF JSM DT&E - currently projected for Dec 2025). No items are being replaced. Comparative info (e.g., range, speed) is TBD: will be assessed throughout F-35 JPO/RNoAF DT&E effort; once available, key performance characteristics are expected to be classified. USAF JSM effort heavily leverages ongoing F-35 JPO/RNoAF JSM DT&E effort and is reliant on integration of network enabled weapons (NEW) capabilities. This requirement supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Funding for this exhibit is contained in PE 0207335F.
Justification
Justification — Joint Strike Missile
The FY 2026 request for Joint Strike Missile (JSM) includes $0 thousand of discretionary and $376,901 thousand of mandatory funds for a total of $376,901 thousand. The Mandatory breakout is $210,000 thousand which will procure a quantity of 58 in Section 20009 (INDOPACOM) and $166,901 thousand which will procure a quantity of 54 in Section 20004 (Munitions and Supply Chain). Further information for this reconciliation request is provided in Section 20004 (Munitions and Supply Chain) and Section 20009 (INDOPACOM) of the Reconciliation Exhibit. Note: Procurement quantities can change based on negotiated options/pricing bands and available funding, in accordance with Title 10, U.S Code Section 2308 BUY-TO-BUDGET ACQUISITION.
Budget Line Items(workbook-cited)
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Missile Procurement, Air Force | F | FY24 Actuals | $373.5M |
| Missile Procurement, Air Force | F | FY25 Enacted | $165.9M |
| Missile Procurement, Air Force | F | FY26 Reconciliation | $376.9M |
| Missile Procurement, Air Force | F | FY26 Total | $376.9M |
Budget Details(R-2/P-40 facts)
| Project | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|
| Program Element | $373.5M | $165.9M | $0 | $0 |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →