Printed from https://fiscalreceipts.com/program/H060WM/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
HH60W Modifications
Budget figures
$9.15M discretionary + $32.7M one-time reconciliation. Discretionary change vs FY2025 enacted: -51.6%.
Two official figures, one label— reconciled below
Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows that the R-2/P-40 J-book program line excludes — advance procurement in an ordinary year, and in FY2026 the one-time reconciliation appropriation as well. Each row below names the one it is. How the two bases relate →
FY26 Request · $41.8M TOA − $9.15M J-book line = 32.7M (41.8 − 9.1 = 32.7) — $32.7M of one-time FY2026 reconciliation money accounts for this gap — not advance procurement
Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $0J-book detail · PB2026 |
| FY25 | $18.9MP-1 TOA · PB2026 |
| FY26 | $41.8MP-1 TOA · PB2026 |
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $0 | $3.08M | – | ||
| Enacted | – | $3.08M | – | $18.9M | |
| Request | – | – | $0 | $28.9M | $41.8M |
blank = series not published for this year; – = absent from that edition.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — HH60W Modifications
The Combat Rescue Helicopter (HH-60W) program will replace the aging HH-60G. The HH-60W will be capable of employment day or night, in adverse weather, and across the full spectrum of threats to include chemical, biological, radiological, and nuclear. On-board defensive capabilities will permit the HH-60W system to operate with less risk than legacy systems in an increased threat environment. An in-flight air refueling capability will provide an airborne alert capability and extend its combat mission range. The HH-60W system is capable of conducting combat search and rescue airborne mission commander duties. The aircraft will be self-supporting to the maximum extent practical. The HH-60W system may also conduct other collateral missions inherent in its capabilities to conduct Personnel Recovery, such as non-conventional assisted recovery, non-conventional evacuation operations, defense support to civil authorities, civil search and rescue, international aid, emergency aeromedical evacuation, disaster/humanitarian relief, counter-drug activities, support for National Aeronautics and Space Administration flight operations, and insertion/extraction of combat forces. Funding for this exhibit contained in PE 0207229F. Future efforts may include Directional Infrared Counter Measure capability, Global Positioning System Anti-Jam/Anti-Spoof (GPS AJ), a Degraded Visual Environment (DVE) system, Integrated Vehicle Health Monitoring System Control, Video Data Link, Blue Force Tracker 2, Next Gen Crypto Mod Mobile User Objective System (MUOS) including Joint Range Extension Applications Protocol (JREAP), Air Force District of Washington (AFDW) mission requirement modifications, Electronic Flight Bags, and Automated Dependent Surveillance Broadcast - In Device. Capability Upgrades and modernization also supports inclusion for mandates, hardware and software changes for diminishing manufacturing sources, and component obsolescence issues for aircraft and training systems. This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.
Justification
Justification — HH60W Modifications
The FY 2026 request for Combat Rescue Helicopter (HH-60W) program includes 9,150 thousand of discretionary and 32,667 thousand of mandatory (reconciliation) for a total of 41,817 thousand. The mandatory funds add funding to modify aircraft for Air Force District of Washington (AFDW) Mission Requirements. Further information for this reconciliation request is provided in Section 20008 (Nuclear) of the Reconciliation Exhibit. FY 2026 funding will support Low Cost Modifications (LCMs), Global Positioning System Anti-Jam (GPS AJ), and Mobile User Objective System (MUOS).
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Aircraft Procurement, Air Force | F | FY25 Enacted | $18.9M |
| Aircraft Procurement, Air Force | F | FY26 Disc. Request | $9.15M |
| Aircraft Procurement, Air Force | F | FY26 Reconciliation | $32.7M |
| Aircraft Procurement, Air Force | F | FY26 Total | $41.8M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $3.08M | $0 | $18.9M | $9.15M | $9.15M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not HH60W Modifications. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · Q906
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O878
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O923
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
FY2026 Air Force Aircraft Procurement, Vol. I · www.saffm.hq.af.mil
PDF page 127