MH-139A
Budget figures
$4.48M discretionary + $150.1M one-time reconciliation. Discretionary change vs FY2025 enacted: -98.4%.
Two official figures, one label— reconciled below
Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows that the R-2/P-40 J-book program line excludes — advance procurement in an ordinary year, and in FY2026 the one-time reconciliation appropriation as well. Each row below names the one it is. How the two bases relate →
FY26 Request · $154.6M TOA − $4.48M J-book line = 150.1M (154.6 − 4.5 = 150.1) — $150.1M of one-time FY2026 reconciliation money accounts for this gap — not advance procurement
Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $223.2M |
| FY25 | $279.1M |
| FY26 | $154.6M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $141.4M | $186.2M | $223.2M | ||
| Enacted | – | $186.2M | $228.8M | $279.1M | |
| Request | – | – | $228.8M | $294.1M | $154.6M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $228.8M for FY2024; the PB2026 book reported $223.2M as actual total obligation authority — $5.61M below the request. 223.2 − 228.8 = -5.6 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — MH-139A
The MH-139A program will replace the Air Force fleet of UH-1N aircraft, which have significant capability gaps in speed, range, endurance, payload capacity, and aircraft self-protection. The program of record is 56 aircraft, including 8 total Aircrew Training Devices (ATDs), and associated support equipment. The replacement aircraft will provide a vertical airlift and support the requirements for Air Force Global Strike Command (AFGSC) and Air Force Reserve Command (AFRC). AFGSC is the Air Force lead command and operational capability requirements sponsor. This program is an element of the Air Force's nuclear enterprise reform initiatives. This requirement supports the performance of a full financial audit as required by Title 10 U.S.C. Chapter 9A, Sec 240-D Funding for this exhibit contained in PE 0102110F. Anticipated Milestone Dates are as follows: TDP: Jun 2025; IOT&E: Jun 2025; FRP: Feb 2026 Section 1815 of the FY08 National Defense Authorization Act (P.L. 110-181) is necessary for active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. The FY 2026 request was reduced by $2.647 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative." Funding can be utilized to resolve issues related to Diminishing Manufacturing Sources (DMS). Depot Source Of Repair (DSOR) decision received Sep 2022. The decision outlines Fleet Readiness Center East for Dynamic and Structural hardware components; Ogden ALC, Warner Robbins ALC, and Oklahoma City ALC for LRU hardware and software; Warner Robins ALC for software sustainment; and finally, JBSA-Lackland for cryptographic hardware work. Additionally, the sustainment business case analysis shifted training systems to contractor performance. Depot gap analysis conducted in FY 2024-FY 2025; working with Item Managers to integrate common assets into existing depots in FY 2025 and activating hardware and software locations per DSOR.
Justification
Justification — MH-139A
The FY 2026 request for MH-139A includes $4,478 thousand of discretionary and $150,100 thousand of mandatory (reconciliation) for a total of $154,578 thousand. The mandatory funds production aircraft and associated training, equipment, depot, and support costs. Further information for this reconciliation request is provided in Section 20008 (Nuclear) of the Reconciliation Exhibit. FY 2026 will procure the full-rate production lot of two (2) aircraft with associated training, support equipment, site activation support, other government costs, program support, depot activation, interim supply support, and interim contractor support.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Aircraft Procurement, Air Force | F | FY24 Actuals | $223.2M |
| Aircraft Procurement, Air Force | F | FY25 Enacted | $279.1M |
| Aircraft Procurement, Air Force | F | FY26 Disc. Request | $4.48M |
| Aircraft Procurement, Air Force | F | FY26 Reconciliation | $150.1M |
| Aircraft Procurement, Air Force | F | FY26 Total | $154.6M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $330.0M | $223.2M | $279.1M | $4.48M | $4.48M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
GAO oversight of this program
GAO assessed MH-139A Grey Wolf Helicopter (MH-139A) in its June 2025 Weapon Systems Annual Assessment, as an Air Force MDAP program.
“The MH-139A program will replace the Air Force's fleet of 63 UH-1N utility helicopters. The MH-139A helicopter's missions will include securing intercontinental ballistic missile sites and convoys. The MH-139A program is acquiring a militarized version of a commercial helicopter that will be integrated with previously developed systems. The Air Force plans to acquire an integration laboratory, training system, and support and test equipment as part of the program.”
GAO-25-107569, p. 83 — the assessment page in GAO’s 2025 report
Earlier editions of the same assessment: June 2024 · June 2023
GAO assessed MH-139A Grey Wolf Helicopter (MH-139A) in its June 2024 Weapon Systems Annual Assessment, as an Air Force MDAP program.
“The MH-139A program will replace the Air Force's fleet of 63 UH-1N utility helicopters. The MH-139A helicopter's missions will include securing intercontinental ballistic missile sites and convoys and transporting senior government officials in the National Capital Region. The MH-139A program is acquiring a militarized version of a commercial helicopter to be integrated with previously developed systems. In addition to the helicopters, the Air Force plans to acquire an integration laboratory, a training system, and support and test equipment as part of the program.”
GAO-24-106831, p. 83 — the assessment page in GAO’s 2024 report
GAO assessed MH-139A Gray Wolf Helicopter (MH-139A) in its June 2023 Weapon Systems Annual Assessment, as an Air Force MDAP program.
“The MH-139A program will replace the Air Force's fleet of 63 UH-1N utility helicopters. The MH-139A helicopter's missions will include securing intercontinental ballistic missile sites and convoys and transporting senior government officials in the National Capital Region. The MH-139A program is acquiring a militarized version of a commercial helicopter to be integrated with previously developed systems. In addition to the helicopters, the program plans to acquire an integration laboratory, a training system, and support and test equipment.”
GAO-23-106059, p. 91 — the assessment page in GAO’s 2023 report
GAO assessed the program, not this budget line. MH-139A is one of the lines that funds it, and GAO’s work above says nothing about this line’s own figures. Which line each GAO item attaches to is a hand-ratified crosswalk — how it was checked.
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not MH-139A. GAO's program-level work on this line is above. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O855
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O831
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O874
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
FY2026 Air Force Aircraft Procurement, Vol. I · www.saffm.hq.af.mil
PDF page 117