Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $816.0K |
| FY25 | $2.10M |
| FY26 | $17.9M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $1.53M | $1.76M | $816.0K | ||
| Enacted | – | $1.76M | $816.0K | $2.10M | |
| Request | – | – | $816.0K | $2.10M | $17.9M |
blank = series not published for this year; – = absent from that edition.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — H-1
This line item funds modifications to UH-1N and TH-1H aircraft. The two-engine UH-1N is a light, utility helicopter primarily used for missile site and range support and distinguished visitor airlift support. There are 63 UH-1N aircraft in the inventory. They were built with an estimated service life of 10,000 flight hours and are not service limited due to on-going modifications and upgrades. There are 28 TH-1H aircraft in the inventory. They are used in the helicopter track for USAF Specialized Undergraduate Pilot Training. The TH-1H modernization modification provided a service life of 20 years, the last one was delivered in 2013. This funding will address aircraft modifications, aging fleet problems to include: structural repairs, replacement of key systems based on structural fatigue, system obsolescence and a diminishing manufacturing industrial base. Additionally, this effort will address safety requirements to include: Federal Aviation Administration, DoD, engineering mandates and configuration changes. This effort includes funding for program support costs. The FY 2026 request was reduced by $0.084 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative." Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. Funding in this exhibit is contained in PE 0101235F, PE 0401314F, and PE 0804747F.
Justification
Justification — H-1
This program, P-3A Mod 8864, H-1 Reliability Mods, is a new start. Primary efforts in FY 2026 include: H-1 Reliability Mods, UH-1N Low-Cost Modifications and TH-1H Low-Cost Modifications.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Aircraft Procurement, Air Force | F | FY24 Actuals | $816.0K |
| Aircraft Procurement, Air Force | F | FY25 Enacted | $2.10M |
| Aircraft Procurement, Air Force | F | FY26 Disc. Request | $17.9M |
| Aircraft Procurement, Air Force | F | FY26 Total | $17.9M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $61.3M | $816.0K | $2.10M | $17.9M | $17.9M |
Follow the dollar
Appropriation → program element → top high-confidence awards → recipient families → congressional districts.
Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →
The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.
| District | Program obligations |
|---|---|
| AL-05 | $18.2M |
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
| Recipient | PIID | Confidence |
|---|---|---|
| TYONEK GLOBAL SERVICES LLC | FA855218C0001 | high |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not H-1. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O903
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O876
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O920
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
FY2026 Air Force Aircraft Procurement, Vol. I · www.saffm.hq.af.mil