F-35 Modifications

Air ForceProcurementReconciledBLIF03500
What it is
F-35 Modifications (F03500) is an Air Force procurement line funded in the Aircraft Procurement, Air Force account.
What changed
-$14.1M FY25→26 P-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 118 linked award records are listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$329.4MP-1 TOA · PB2026
FY25 Enacted
$394.5MP-1 TOA · PB2026
FY26 Request
$380.3MP-1 TOA · PB2026
FY25→26 Change
-$14.1MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $329.4MFY25: $394.5MFY26: $380.3MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$329.4M
FY25$394.5M
FY26$380.3M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$247.9M$333.1M$329.4M
Enacted–$333.1M$451.8M$394.5M
Request––$451.8M$549.7M$380.3M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $451.8M for FY2024; the PB2026 book reported $329.4M as actual total obligation authority — $122.4M below the request. 329.4 − 451.8 = -122.4 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — F-35 Modifications

The F-35 Joint Strike Fighter (JSF) Program will develop and deploy a family of highly common, affordable, next generation, stealthy, multi-role strike fighters that meet the needs of multiple services and countries. The United States Air Force F-35A Conventional Take Off and Landing (CTOL) line item funds modifications and retrofits to the F-35A aircraft and integrated air systems. The overall effort provides correction of deficiencies, near and long-term improvements to the fleet, focusing on documented deficiencies related to safety, maintainability, and aircraft systems. These modifications and selected component changes are accomplished by field and depot retrofit. Block upgrades provide more robust performance in navigation, weapons, avionics, survivability, maneuverability, maintainability, and mission deployment of the F-35A platform. This modification program will bring early production aircraft and integrated systems to a common fleet configuration as fielded capabilities evolve over the course of the F-35 program. In order to meet emerging deficiencies, the airframe and integrated systems must be modified as critical corrections/changes are identified. Funds will be used to manage, prepare, process, and incorporate changes to sustain and improve F-35A system operations. The Structural Life Limit Parts (SLLP) Program is the preponderance of the correction of deficiencies effort. The Structural Life Limit Parts Program Group 2 (SLLP2) will remove life limits below 4,000 hours. The Engineering Change Proposals (ECP) necessary to extend the life of the aircraft to 8,000 hours is known as SLLP3. In 2025, the Program will procure and install SLLP2 modifications while continuing to mature engineering for SLLP3 ECPs and progressing to material purchases in future years. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES Technology refresh (TR-3) kit procurements will continue in FY 2026 for F-35A aircraft. The F-35 Program will simultaneously be procuring 42Px Kit A and 42Px Kit B retrofits in order to deliver baseline Block 4 capabilities to fleet aircraft. Note: (1) United States Air Force (USAF) Initial Operational Capability (IOC) occurred on 2 August 2016 and the Full Rate Production (FRP) occurred on 12 March 2024.

Justification

Justification — F-35 Modifications

Basis for FY 2026 budget request is to continue to fund the F-35A Total Active Inventory of 541 aircraft. FY 2026 funding decreased as a result of a decrease in number of aircraft being procured in FY 2026.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Aircraft Procurement, Air ForceFFY24 Actuals$329.4M
Aircraft Procurement, Air ForceFFY25 Enacted$394.5M
Aircraft Procurement, Air ForceFFY26 Disc. Request$380.3M
Aircraft Procurement, Air ForceFFY26 Total$380.3M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$2.01B$329.4M$394.5M$380.3M$380.3M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.

Showing 25 of 118 award records (this program's published budget→award crosswalk links — see methodology)

RecipientPIIDConfidence
ALVAREZ LLCN6833520F0409medium
BOOZ ALLEN HAMILTON INCN0001920F0476medium
BOOZ ALLEN HAMILTON INCN6833520F0672medium
CACI IDT, LLCN0001921F0232medium
CDW GOVERNMENT LLCN6833520F0271medium
DARK WOLF SOLUTIONS, LLCFA701420F0040medium
DELL FEDERAL SYSTEMS L.PN0001921F0872medium
DELL FEDERAL SYSTEMS L.PN6833520F1150medium
DELL MARKETING L.P.N0001921F0230medium
EXECUTIVE BUSINESS SERVICES, INC.N0001921F0237medium
FLATWATER SOLUTIONS COMPANYN6833519F0174medium
FLATWATER SOLUTIONS COMPANYN6833519F0294medium
FLATWATER SOLUTIONS COMPANYN6833519F0394medium
FLATWATER SOLUTIONS COMPANYN6833519F0430medium
FLATWATER SOLUTIONS COMPANYN6833519F0510medium
FLATWATER SOLUTIONS COMPANYN6833519F0592medium
FLATWATER SOLUTIONS COMPANYN6833520F0227medium
FLATWATER SOLUTIONS COMPANYN6833520F0676medium
FLATWATER SOLUTIONS COMPANYN6833520F0685medium
FLATWATER SOLUTIONS COMPANYN6833520F1619medium
FLATWATER SOLUTIONS COMPANYN6833520F1620medium
FLATWATER SOLUTIONS COMPANYN6833520F1621medium
FLATWATER SOLUTIONS COMPANYN6833521F0206medium
FLATWATER SOLUTIONS COMPANYN6833521F0208medium
FLATWATER SOLUTIONS COMPANYN6833521F0209medium

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

GAO oversight of this program

GAO assessed the program, not this budget line. F-35 Modifications is one of the lines that funds it, and GAO’s work above says nothing about this line’s own figures. Which line each GAO item attaches to is a hand-ratified crosswalk — how it was checked.

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not F-35 Modifications. GAO's program-level work on this line is above. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.