Skip to content
Fiscal Receipts

MC-130J

Air ForceProcurementReconciledBLIC130JM
What it is
MC-130J (C130JM) is an Air Force procurement line funded in the Aircraft Procurement, Air Force account.
What changed
No FY25→26 comparison — endpoints unavailable or on different bases.
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$10.1MP-1 TOA · PB2026
FY25 Enacted
$0J-book detail · PB2026
FY26 Request
$0J-book detail · PB2026
FY25→26 Change
No comparison: endpoints unavailable or on different bases

No FY2026 R-1/P-1 request line for this program element. The FY2026 President's Budget request workbook carries no FY2026 line for it; its last workbook figure is FY2024. The PB2026 J-book detail below does carry an FY2026 row for this line, recorded as zero. A workbook blank and a documented zero are different records, and this page shows both. An absent line is not by itself an ending — PB2026 renumbered program elements at scale across the services and defense agencies, so this work may continue under a different number. No successor is linked for this line: this site's program-lineage layer holds no keyed edge pointing forward from here. That is an absence in this site's lineage layer, not a finding about the program: if the J-book narrative on this page describes a realignment, it is quoted below in the document's own words, and this note does not restate it.

Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $10.1MFY25: $0FY26: $0FY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$10.1MP-1 TOA · PB2026
FY25$0J-book detail · PB2026
FY26$0J-book detail · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

3 fiscal years of this program as published (FY2022–FY2024): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
3 fiscal years of this program as published (FY2022–FY2024): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2024 request — PB2024 editionFY22FY23FY24

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24
Actuals$220.0M$17.5M$10.1M
Enacted–$40.4M$10.1M
Request––$10.1M

blank = series not published for this year; – = absent from that edition.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — MC-130J

The Post Production Support Program for AC/HC/MC-130Js supports all out-of-production aircraft, allows for corrections of production deficiencies, and includes all other items/activities needed to support the AC/HC/MC-130Js once the production line is complete. Activities include but are not limited to: stand up, replacement, and/or increased requirement of Primary Mission Equipment; Diminishing Manufacturing Sources (DMS) and obsolescence solutions including (if optimal) lifetime buys or bridge buys limited to the program of record quantity; spares; Program Support Costs (PSC);Post Delivery Support, Training Equipment, Government Services; fielding of/and upgrades to simulators/training devices; Interim Contractor Support (ICS); purchase of Government Furnished Equipment; Pub/Tech Data; Crypto Updates; and Data. This program also addresses post-delivery and field support needs such as training, interim supply support, deferred support equipment (initial peculiar), support equipment, and replacement of organizational and intermediate level peculiar support equipment. It also includes procurement of additional quantities of support equipment in support of force structure changes that increase the number of bases requiring support equipment during the post production period of the weapon system (e.g., conversion of active to guard/reserve forces) and procurement of investment type replenishment spares and repair parts which are exempt from the AF Working Capital Fund, Supply Division.

Justification

Justification — MC-130J

No FY 2026 funding requested.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Aircraft Procurement, Air ForceFFY24 Actuals$10.1M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$10.1M$0$0$0

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not MC-130J. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.