Printed from https://fiscalreceipts.com/program/B02100/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
B-21 Raider
Budget figures
$3.45B discretionary + $2.10B one-time reconciliation. Discretionary change vs FY2025 enacted: +32.7%.
Two official figures, one label— reconciled below
Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows that the R-2/P-40 J-book program line excludes — advance procurement in an ordinary year, and in FY2026 the one-time reconciliation appropriation as well. Each row below names the one it is. How the two bases relate →
FY26 Request · $5.55B TOA − $3.45B J-book line = 2.10B (5,551.2 − 3,452.1 = 2,099.1) — $2.10B of one-time FY2026 reconciliation money accounts for this gap — not advance procurement
Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $2.27B |
| FY25 | $2.60B |
| FY26 | $5.55B |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $108.0M | $1.71B | $2.27B | ||
| Enacted | – | $1.65B | $2.33B | $2.60B | |
| Request | – | – | $2.33B | $2.68B | $5.55B |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $2.33B for FY2024; the PB2026 book reported $2.27B as actual total obligation authority — $54.4M below the request. 2,270.7 − 2,325.1 = -54.4 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — B-21 Raider
Funding includes aircraft flyaway costs, producibility improvements/incentives towards the active management strategy, support equipment, alternate mission equipment, training, spares, depot standup, engineering change orders and other government costs such as program support costs. In addition, funding may support Diminishing Manufacturing Sources and Material Shortages (DMSMS) and/or obsolescence issues. DMSMS activities may include, but are not limited to, bridge buys, life of type buys, buys to protect production schedule, and minor engineering efforts. This program is reported in accordance with Title 10, United States Code, Section 119(a)(1) in the Special Access Program Annual Report to Congress. For further information, please contact the Director of Special Programs, OUSD(A&S)/DSP. The FY 2026 request for B-21 Raider includes $2,590,116 thousand of discretionary and $2,099,126 thousand of mandatory (reconciliation) for a total of $4,689,242 thousands. The enhancement portion funds expansion of capacity for B-21. Further information for this reconciliation request is provided in Section 20008 of the Reconciliation Exhibit. Funding for this exhibit contained in PE 0101110F.
Justification
Justification — B-21 Raider
This program is reported in accordance with Title 10, United States Code, Section 119(a)(1) in the Special Access Program Annual Report to Congress. For further information, please contact the Director of Special Programs, OUSD(A&S)/DSP.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Aircraft Procurement, Air Force | F | FY24 Actuals | $2.27B |
| Aircraft Procurement, Air Force | F | FY25 Enacted | $2.60B |
| Aircraft Procurement, Air Force | F | FY26 Disc. Request | $3.45B |
| Aircraft Procurement, Air Force | F | FY26 Reconciliation | $2.10B |
| Aircraft Procurement, Air Force | F | FY26 Total | $5.55B |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $1.71B | $2.27B | $2.60B | $3.45B | $3.45B |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
12 mentions from the Senate LDA disclosure database.
HR 9495 - FY27 Defense Appropriations bill - B-21, Triton, Global Hawk, E-2D HR 8800 - FY27 DOD Authorization bill…
HR 4016/S 2572 - FY26 Defense Appropriations bill - B-21, Triton, Global Hawk, E-2D HR 3838/S 2296 - FY26 DOD…
HR 4016 - FY26 Defense Appropriations bill - B-21, Triton, Global Hawk, E-2D FY26 DOD Authorization bill - GBSD, B-21…
HR 4016/S 2572 - FY26 Defense Appropriations bill - B-21, Triton, Global Hawk, E-2D HR 3838/S 2296 - FY26 DOD…
HR 8774/S. 4921 - FY25 Defense Appropriations bill - B-21, Triton, Global Hawk, E-2D HR 8070/S 4638 - FY25 DOD…
HR 4016/S 2572 - FY26 Defense Appropriations bill - B-21, Triton, Global Hawk, E-2D HR 3838/S 2296 - FY26 DOD…
Department of Defense Appropriations Act of 2024 (HR 4365/S 2587; PL 118-47) and Further Consolidated Appropriations…
Department of Defense Appropriations Act of 2025 (HR 8774/S XXXX); provisions regarding R&D-Army, Navy/USMC, Air…
HR 8774 / S 4921 - FY25 Defense Appropriations bill - B-21, Triton, Global Hawk, E-2D HR 8070 / S 4638 - FY25 DOD…
HR 8774 - FY25 Defense Appropriations bill - B-21, Triton, Global Hawk, E-2D HR 8070/S 4638 - FY25 DOD Authorization…
HR 8774 / S 4921 - FY25 Defense Appropriations bill - B-21, Triton, Global Hawk, E-2D HR 8070 / S 4638 - FY25 DOD…
HR 4365/S 2587 - FY24 Defense Appropriations bill - B-21, Triton, Global Hawk, E-2D HR 2670/S 2226 - FY24 DOD…
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not B-21 Raider. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
Every sentence below carries its citation — warehouse figures open the citation panel, news claims link the cached source.
Research dossiers exist for 50 of 1,938 programs — the 50 largest fully J-book-detailed programs by FY2026 request. why no dossier here? →
Correction
1 claim removed: it cited a source the site could not resolve.
What it is
- B-21 Raider (budget line B02100) is a U.S. Air Force procurement line funded in the Aircraft Procurement, Air Force account.
- The line funds procurement of the B-21 Raider, the Air Force's next-generation strategic bomber, including aircraft flyaway costs, producibility improvements, support equipment, alternate mission equipment, training, spares, depot standup, and engineering change orders.
- Funding may also address Diminishing Manufacturing Sources and Material Shortages (DMSMS) and obsolescence, through activities such as bridge buys, life-of-type buys, and buys to protect the production schedule.
- The B-21 is a special-access program: it is reported to Congress in accordance with Title 10, United States Code, Section 119(a)(1) in the Special Access Program Annual Report, and detailed public justification is limited.
Why it matters
- The line's total funding is $5,551,242 thousand (about $5.55 billion) requested for FY2026, up from $2,600,468 thousand enacted in FY2025.
- In FY2024 the line recorded actual spending of $2,270,693 thousand (about $2.27 billion), so the FY2026 request roughly doubles the recent execution level.
- The FY2026 request is split between a discretionary request of $3,452,116 thousand (about $3.45 billion) and a reconciliation (mandatory) request of $2,099,126 thousand (about $2.10 billion).
- The mandatory (reconciliation) portion of the request is $2,099,126 thousand, a large share of the year's growth.
- The program's own justification states that the enhancement portion of the FY2026 request funds expansion of production capacity for the B-21, with further detail provided in Section 20008 of the Reconciliation Exhibit.
Key players
- The line is run by the U.S. Air Force, with funding drawn from the Aircraft Procurement, Air Force appropriation.
- Because the B-21 is a special-access program, oversight and public reporting run through the Director of Special Programs in the Office of the Under Secretary of Defense for Acquisition and Sustainment (OUSD(A&S)/DSP).
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O833,O834,O835
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O808,O809,O810
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O851,O852,O854
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
FY2026 Air Force Aircraft Procurement, Vol. I · www.saffm.hq.af.mil
PDF page 47