Advanced Pilot Training T-7A

FProcurementPartial ReconciliationAPT000
What it is
Advanced Pilot Training T-7A — a procurement program run by Air Force.
What changed
No FY25→26 comparison — trajectory data incomplete for this line.
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$0
FY25 Total
FY26 Request
$362.1M
FY25→26 Change

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory

Insufficient trajectory data for sparkline (only FY26 available).

Decade view — each figure cites its own President's Budget edition
FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2023 enacted — PB2024 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY22FY23FY24FY25FY26
Actuals$0$10.5M
Enacted$10.5M$20.8M
Request$0$235.2M$362.1M

blank = series not published for this year; – = absent from that edition.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description Advanced Pilot Training T-7A

The Advanced Pilot Training (APT)/ T-7A Red Hawk program will replace the Air Education Training Commands (AETC) aging T-38C fleet with new aircraft, Ground Based Training Systems (simulators, training devices, computer based training systems, academics, etc.), Maintenance Training Systems (which will be procured via a separate contracting action), and support infrastructure currently used in the fighter/bomber advanced Specialized Undergraduate Pilot Training (SUPT) track as well as in the Introduction to Fighter Fundamentals (IFF) program. The APT/T-7A Red Hawk program acquisition strategy was approved by OSD (AT&L) in early FY 2017 (December 2016). The Program completed source selection evaluations and Milestone B in September 2018 and awarded a Fixed Price Incentive Firm Indefinite Delivery /Indefinite Quantity contract to The Boeing Company on 27 September 2018. Critical Design Review was completed in August 2020. Milestone C is currently projected for 2Q FY26 with the first Low-Rate Initial Production deliveries anticipated in 2Q FY27. Funding Contained in this platform's documentation directly aids AETC flying training enterprise to continue its overall pilot production increase to reduce the USAF Pilot Shortage. This requirement supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Funding may be used to address Diminishing Manufacturing Sources/Material Shortages (DMSMS) issues. Funding for this exhibit contained in PE 0804701F.

Justification

Justification Advanced Pilot Training T-7A

FY 2026 will procure Lot 1 aircraft, Ground Based Training System (GBTS), support equipment, interim contractor support, other government costs, and associated support. Interim contractor support is a priced contract option for peculiar support which requires activation in FY26 to allow contractor sufficient lead-time to ensure capabilities, processes, and resources are in place to support the delivery of the first production aircraft. FY26 aircraft procurement quantity reduced from 23 to 14 due to a Milestone C shift to FY2026 and the adoption of a new acquisition strategy, including a phased Milestone C approach to expedite the completion of the EMD phase and support production efforts.

Budget Line Items(workbook-cited)

Exhibit P-1

AccountOrgTypeAmount
Aircraft Procurement, Air ForceFFY25 Enacted$20.8M
Aircraft Procurement, Air ForceFFY26 Disc. Request$362.1M
Aircraft Procurement, Air ForceFFY26 Total$362.1M

Budget Details(R-2/P-40 facts)

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$10.5M$0$20.8M$362.1M$362.1M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →