What it is
Assured Positioning, Navigation and Timing (9897K49000) is an Army procurement line funded in the Other Procurement, Army account.
What changed
-$20.0M FY25→26 P-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 4 linked award records are listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$202.4MP-1 TOA · PB2026
FY25 Enacted
$232.4MP-1 TOA · PB2026
FY26 Request
$212.5MP-1 TOA · PB2026
FY25→26 Change
-$20.0MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $202.4MFY25: $232.4MFY26: $212.5MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$202.4M
FY25$232.4M
FY26$212.5M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$112.8M$166.2M$202.4M
Enacted–$166.9M$202.4M$232.4M
Request––$202.4M$235.3M$212.5M

blank = series not published for this year; – = absent from that edition.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Assured Positioning, Navigation and Timing

This funding line is directly aligned to the Army Assured Positioning, Navigation and Timing modernization priority. The Assured Positioning, Navigation and Timing (APNT) capability provides Army ground maneuver forces access to Military Code (M-Code) and assured PNT in accordance with National Defense Authorization Act guidance under conditions where Global Positioning Systems (GPS) may be limited or denied (jammed and spoofed). APNT products are ruggedized tactical systems that enable Army forces the ability to shoot, move, communicate, thereby allowing forces to maneuver from operational and strategic distances to close with, destroy, and exploit the enemy with sufficient combat power, tempo, and momentum. APNT addresses two critical capability gaps: Access and Integrity. Access is the ability to retrieve accurate PNT information in a contested Electronic Warfare/Cyber environment. Integrity is the ability to trust the PNT information. PNT is a critical enabler of many Army Maneuver, Fires, Intelligence, Mission Command and communications that are dependent on accurate Position and Timing, and a foundational Multi-Domain Battle capability to support: calibrated force posture (position and maneuver across strategic distances); multi-domain formations (operate in contested spaces against near-peer adversaries); convergence (continuous integration of capabilities in all domains). APNT capabilities provide critical support to the execution of the Army's Deliberate Transformation as well as Transformation in Contact and the Next Generation Command and Control (NGC2) environment. Approved Requirements: The Army Requirements Oversight Council (AROC) approved the Alternative Navigation (ALTNAV) Abbreviated Capabilities Development Document (A-CDD) on 29 August 2022. The Joint Requirements Oversight Council (JROC) approved the Dismounted APNT System (DAPS) Capabilities Development Document (CDD) on 28 January 2022. The Army Requirements Oversight Council (AROC) approved the Mounted APNT System (MAPS) CDD on 12 September 2020. MAPS and DAPS are implementing Congressional and OSD guidance to develop and field Military Code (M-Code) Global Positioning System (GPS) Ground user Equipment. The AROC approved the Command, Control, Communications, Computers, Cyber, Intelligence, Surveillance, and Reconnaissance (C5ISR) Modular Open Suite of Standards (CMOSS) Mounted Form Factor (CMFF) Abbreviated Capabilities Development Document (A-CDD) on 04 January 2021. In support of House Report 116-442, 2020, the program will prototype modular cards and software according to the Modular Open System Approach (MOSA) standards, for future modernization and new weapons systems. Joint Requirements Oversight Council Memo (JROCM) 049-10, dated 05 April 2010, approved the PNT Assurance Initial Capabilities Document and designated the Army as the Lead Component for Assured PNT. Assured PNT consists of: K49010 - SSN K49010 has no funds requested in FY 2026. Mounted/Dismounted Receiver: Deploys Resiliency and Software Assurance Measures (RSAM) to legacy Selective Availability and Anti-Spoof Module (SAASM) based military Global Positioning System (GPS) receivers, including Defense Advanced GPS Receiver (DAGR) and embedded Ground Based - GPS Receiver Applications Module (GB-GRAM) to recognize, reject, and report bad navigation data until more effective PNT solutions are deployed. K49020 - Dismounted Hub: The Dismounted Assured PNT (APNT) System (DAPS) is an enduring capability that meets Congressional (10 USC 2281) and Department of Defense guidance to develop and field Military Code (M-Code) Global Positioning System (GPS) to dismounted Soldiers, Commanders, and applicable End User Devices to provide assured timing and position data necessary to effectively engage targets, share data across the network, and conduct mission command functions. DAPS delivers APNT in an optimized form factor that supports dismounted mission profiles in denied environments. The DAPS GEN II system is being fielded to execute the Joint Requirements Oversight Council (JROC) approved DAPS Capability Development Document (January 2022) requirements and will provide an increased capability to include Alternative Navigation (ALTNAV) signal and stand-alone operation. The DAPS enables the Dismounted Soldier with APNT capabilities critical to the targeting process for precision fires, command and control, and maneuver for selected Army units. DAPS were evaluated through Operational Testing as effective, suitable, and survivable and approved for Full Rate Production. K49030 - Mounted Hub A-PNT: The Mounted APNT System (MAPS) will deliver systems that provide the Army's combat forces access to assured PNT information under conditions where space-based GPS may be limited or denied enabling Army forces precision fires, critical maneuvering, network operations, and situational awareness capabilities. The MAPS GEN II system is the enduring capability to meet the Army Requirements Oversight Council (AROC) approved Capability Development Document (September 2020). Congressional (10 USC 2281) and Department of Defense guidance to provide resilient, survivable, and M-Code capable Ground User Equipment receivers. The MAPS GEN II provides increased capability to include M-Code GPS, Alternative Navigation (ALTNAV) signal, and sensor fusion. The MAPS GEN II is comprised of two subsystems: a internally mounted navigation hub where data from sensors and receivers (to include M-code GPS) are fused together to distribute an assured PNT solution to the platform and onboard client systems; and an Anti-Jam Antenna System (AJAS) mounted externally on the platform to protect access to GPS and receive ALTNAV signals. This capability will deliver distributed assured PNT capabilities to platforms in an iterative and affordable manner that allows for future modernization. MAPS were evaluated through Operational Testing as effective, suitable, and survivable and approved for Full Rate Production. K49041 - Alternative Navigation (ALTNAV) Ground Control Segment (ALTNAV GCS) is a global navigation solution. A system of one, which provides warfighters with an alternative source of positioning and timing information. ALTNAV GCS is a complementary capability to Global Positioning System and may be used as contingency in the PNT PACE (Primary, Alternative, Contingency, Emergency) Plan that facilitates continued operations as GPS is degraded or denied in accordance with National Defense Authorization Act (NDAA) Guidance (2021 NDAA: Section 1611). In May 2024, ALTNAV received authorization to enter into the Middle Tier Acquisition - Rapid Fielding pathway from Office of the Assistant Secretary of the Army, Acquisition Logistics and Technology Army Acquisition Executive.

Justification

Justification — Assured Positioning, Navigation and Timing

FY 2026 Base dollars in the amount of $212.469 million will support the following: K49020 - Dismounted Hub: FY 2026 base procurement dollars in the amount of $72.899 million procures 4,336 Dismounted Assured Position Navigation and Timing Systems (DAPS) GEN II systems, spares, integrated logistics support, engineering changes and services for fielding activities to Brigade Combat Teams. K49030 - Mounted Hub A-PNT: FY 2026 base procurement dollars in the amount of $104.740 million procures 619 Mounted Assured Positioning, Navigation and Timing System (MAPS) GEN II systems, spares, A-kits, integrated logistics support, platform and client integration, engineering changes and services for fielding activities to Armored, Stryker and Infantry Brigade Combat Teams. K49041 - Alternative Navigation (ALTNAV): FY 2026 base procurement dollars in the amount of $34.830 million procures and fields the ALTNAV Ground Control Segment network equipment, systems/software engineering and Contractor Logistics Support.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$202.4M
Other Procurement, ArmyAFY25 Enacted$232.4M
Other Procurement, ArmyAFY26 Disc. Request$212.5M
Other Procurement, ArmyAFY26 Total$212.5M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$463.4M$202.4M$232.4M$212.5M$212.5M

Follow the dollar

Appropriation → program element → top high-confidence awards → recipient families → congressional districts.

Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →

The program's money traced left to right: the A appropriation, program element 9897K49000 (Assured Positioning, Navigation and Timing), its 3 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.
The program's money traced left to right: the A appropriation, program element 9897K49000 (Assured Positioning, Navigation and Timing), its 3 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.APPROPRIATIONPROGRAM ELEMENTTOP AWARDSRECIPIENT FAMILIESDISTRICTSAProcurement appropriation9897K49000212.5M FY26W56KGY22F0074ROCKWELL COLLINS, INC.91.0MW56KGY24F0035ROCKWELL COLLINS, INC.73.2MW56KGY23F0017ROCKWELL COLLINS, INC.64.0MRTX CorporationIA-02

The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.

The diagram as text: one row per congressional district in the diagram, the recipient families shown there, and that district's cited program obligations.
DistrictProgram obligations
IA-02$224.8M

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

RecipientPIIDConfidence
ROCKWELL COLLINS, INC.W56KGY22F0074high
ROCKWELL COLLINS, INC.W56KGY23F0017high
ROCKWELL COLLINS, INC.W56KGY24F0035high
TRX SYSTEMS, INC.W56KGY23D0003high

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Assured Positioning, Navigation and Timing. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.