Skip to content
Fiscal Receipts

Items Less Than $5.0M (Float/Rail)

AProcurementPartial Reconciliation9552ML5355
What it is
Items Less Than $5.0M (Float/Rail) — a procurement program run by Army.
What changed
No FY25→26 comparison — trajectory data incomplete for this line.
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
FY25 Total
FY26 Request
$18.2M
FY25→26 Change

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory

Insufficient trajectory data for sparkline (only FY26 available).

Decade view — each figure cites its own President's Budget edition
FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2023 enacted — PB2024 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY22FY23FY24FY25FY26
Actuals$0$10.1M
Enacted$10.1M$20.0M
Request$0$20.0M$18.2M

blank = series not published for this year; – = absent from that edition.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description Items Less Than $5.0M (Float/Rail)

This budget line supports Float and Rail programs. Presently, the Army is focused on Army Rail requirements to obtain new railroad locomotives and railway cars to replace aging assets. . For the Rail program, railroad equipment consists of locomotives, rolling stock, railway passenger cars, track maintenance equipment, etc., used to support Army ammunition plants, Army Materiel Command (AMC) depots, Installation Management Command (IMCOM), Forces Command (FORSCOM) and Training and Doctrine Command (TRADOC) installations in peacetime, training and mobilization missions. This Railway Equipment is required for the replacement of locomotives and railway cars that have exceeded their economic useful life (65 years) and have become logistically unsupportable and costly to maintain. This equipment is in some cases already unserviceable and in other cases, either unsafe or not cleared for use under the Federal Railroad Administration (FRA). Previous year funding procured shop equipment and tools to assist in the Army's move of its railroad locomotive overhaul facility, the Defense Generator & Rail Center from Hill, AFB, UT to Anniston Army Depot, AL. Army Rail moves the warfighter's equipment (Abrams tanks, Bradley Fighting Vehicles, MRAPS etc.) from within the installations to the mainline where it is transferred to commercial railroads. The Rail program also supports the replacement of the DODX flatcars that are facing mandatory retirement by the Federal Railroad Administration after 50 years of service. These railway cars move the warfighters heavy equipment over the nation's commercial railroads. Locomotive equipment consist of commercial off-the-shelf switcher locomotives in direct support of the Army Rail Modernization Program. The program mandates systematic replacement of an aging fleet, that for the respective installations are becoming increasingly more costly to maintain. The Locomotives are industry proven, state of the art technology that will position the Army to meet current EPA air quality restrictions, and future fuel economy mandates. The procurement of railway cars is to meet TDA shortages at various Army installations as well as to replace aging assets that have exceeded their economic useful life.

Justification

Justification Items Less Than $5.0M (Float/Rail)

FY 2026 Base procurement dollars in the amount of $18.217 million supports the Army Rail Program. The funds will be used to procure new railroad locomotives and railway cars for the Army's captive railway fleet. They replace aging assets that are on average 50 years old. One-Third of the Army's railroad locomotives are beyond their economic useful-life of 65 years and are increasingly difficult to maintain and logistically support. The procurement of railway cars for the captive fleet will be used to meet TDA shortages at various Army installations and replace aging assets that have exceeded their economic useful life. This program will extend over several years and continue until the required replacement quantity is obtained. The Rail program also supports the replacement of the DODX flatcars that are facing mandatory retirement by the Federal Railroad Administration after 50 years of service. These railway cars move the warfighters heavy equipment over the nation's commercial railroads. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), these items are necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestics emergency responses, and providing military support to civil authorities.

Budget Line Items(workbook-cited)

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, ArmyAFY25 Enacted$20.0M
Other Procurement, ArmyAFY26 Disc. Request$18.2M
Other Procurement, ArmyAFY26 Total$18.2M

Budget Details(R-2/P-40 facts)

ProjectAll Prior YearsFY25 TotalFY26 BaseFY26 Request
Program Element$202.9M$20.0M$18.2M$18.2M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →