Family Of Engr Combat and Construction Sets

AProcurementPartial Reconciliation9462R70001
What it is
Family Of Engr Combat and Construction Sets — a procurement program run by Army.
What changed
No FY25→26 comparison — trajectory data incomplete for this line.
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$12.1M
FY25 Total
FY26 Request
FY25→26 Change

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory

Insufficient trajectory data for sparkline (only FY24 available).

Decade view — each figure cites its own President's Budget edition
FY2022 actuals — PB2024 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY22FY25

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY22FY23FY24FY25
Actuals$36.2M$12.1M
Enacted$0$12.1M$9.22M
Request$12.1M$9.22M

blank = series not published for this year; – = absent from that edition.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description Family Of Engr Combat and Construction Sets

The Family of Engineering Combat and Construction Sets (ECACS) is a family of systems that will support combat operations by construction engineer teams in urban, rural, and subterranean and dense environments. ECACS sets utilized in the range of urban environments will aid in detection, protection, surveillance, monitoring, evacuation and clearing. ECACS sets utilized in the range rural environments will allow clearing and troop mobility support areas to include airfields, ports, facilities, and roads. All of the ECACS sets support the Grow the Army initiative, which includes MRBC activations, Combat Engineer Company - Armored (CEC-A) unit conversions, and Combat Engineer Company - Infantry (CEC-I) unit conversions. The Hydraulic, Electric, Pneumatic, Petroleum Operated Equipment (HEPPOE) replaces two legacy systems; the Hydraulic Electric Tool Outfit (HETO) and the Pneumatic Tool & Compressor Outfit (PTCO). Currently there is a large capability gap in the field that severely needs this materiel solution for a rapidly available, portable and modernized tool kit for the Engineer community, specifically GAP #11, BCT Lethality and Mobility of the critical large scale ground combat operations gaps and Gap #8, wet gap crossing. It supports missions by clearing buildings for repair and construction, clearing areas around road construction, port openings, transition and reconstruction operations. Supports critical Infrastructure repair and rescue during natural disasters and civil emergencies. Enables civil authority the security and stability in all areas of Theater Construction Operations. Army Acquisition Objective (AAO) for Hydraulic Electric Pneumatic Petroleum Operated Equipment (HEPPOE) is 990. The Engineer Equipment Set: Urban Operations, Platoon Set (UOpPS) consists of high technology equipment that provides Soldiers with enhanced capabilities to perform missions in urbanized or complex terrain. The Engineer Equipment Set: Urban Operations, Platoon Set (UOpPS) uniquely fills capability gaps that exist at the platoon level for conducting operations in the range of urban environments, specifically GAP #11, BCT Lethality and Mobility of the critical large scale ground combat operations gaps and Gap #8, wet gap crossing. It provides engineers and Soldiers with specialized tools enabling them to conduct operations in urban environments in a safe, more expedient manner. The components include remote viewing instruments, detectors for explosives and gases, portable welders, metal cutting torches, rescue tools, winch, and battery-operated drills and saws. The set standardizes tools, reducing logistical support and provides a Type Classified (TC)-standard Army system. Army Acquisition Objective (AAO) for Urban Operations, Platoon Set (UOpPS) is 1177. The Engineer Equipment Set: Urban Operations, Squad Set (UOpSS) consists of equipment that provides Soldiers with enhanced capabilities to perform missions in urbanized or complex terrain. The Engineer Equipment Set: Urban Operations, Squad Set (UOpSS) uniquely fills capability gaps that exist at the squad level for conducting operations in the range of urban environments, specifically GAP #11, BCT Lethality and Mobility of the critical large scale ground combat operations gaps and Gap #8, wet gap crossing. Components include portable blast shield, collapsible lightweight assault ladders, mechanical entry tools, and rappelling gear. This set supports dismounted engineer Soldiers and others in conducting Military Operations in Urban Terrain (MOUT). The set standardizes tools, reducing logistical support and provides a Type Classified (TC)-standard Army system. Army Acquisition Objective (AAO) for Urban Operations, Squad Set (UOpSS) is 1841. Vertical Skills Engineer Construction Kits (VSECK) has six types which each provide tools and power equipment to meet maintenance and construction mission requirements. VSECK Type I Carpenters Tool Kit Squad (CTKS) is a new configuration containing industrial quality hand tools, safety equipment, deployment bags and tool belts for up to eight Construction Engineers secured in a waterproof rapid inventory case. Currently, there is a large capability gap in the field that severely needs this materiel solution for a rapidly available, portable and modernized tool kit for the Engineer community, specifically GAP #11, BCT Lethality and Mobility of the critical large scale ground combat operations gaps and Gap #8, wet gap crossing. Hand tools include hammers, utility knives, chisels, punches, hacksaws, hand saws, pliers, screwdrivers, squares and tape measures. VSECK Type I replaces one legacy system through modernization, consolidation and optimization. The legacy system this replaces does not meet current mission requirements and does not have any warranty associated with the current components. Army Acquisition Objective for Type I is 1159. VSECK Type II Carpenters Supplemental Tool Kit (CSTK) is a new configuration containing battery powered & carpentry hand tools to increase productivity at remote sites supporting a platoon size element. Currently, there is a large capability gap in the field that severely needs this materiel solution for a rapidly available, portable and modernized tool kit for the Engineer community, specifically GAP #11, BCT Lethality and Mobility of the critical large scale ground combat operations gaps and Gap #8, wet gap crossing. Cordless power tools include: hammer drills, right angle drills, circular saws, jig saws and reciprocating saws. The cordless tools are a minimum of 18v and standardized to use the same power source with a power management system capable of recharging multiple power sources simultaneously. VSECK Type II replaces one legacy system through modernization, consolidation and optimization. The legacy system this replaces does not meet current mission requirements and does not have any warranty associated with the current components. Army Acquisition Objective for Type II is 652. VSECK Type III Carpenters Tool Kit (CTK) is a new configuration containing commercial pneumatic, electric & hand carpentry tools that enable Soldiers to perform common carpentry tasks including construction of fighting positions, shelters, base camps, POW camps, temporary structures, bridges, ports & repair of existing structures. Currently there is a large capability gap in the field that severely needs this materiel solution for a rapidly available, portable and modernized tool kit for the Engineer community, specifically Gap #11, BCT Lethality and Mobility of the critical large scale ground combat operations gaps. Tool load includes pneumatic nailer, blow gun, router, jig saw, 10" table saw, 10" circular saw, 14" cut off saw, 12" miter saw, nibbler, electric shears and tile cutter. VSECK Type III replaces one legacy system through modernization, consolidation and optimization. The legacy system this replaces does not meet current mission requirements and does not have any warranty associated with the current components. Army Acquisition Objective for Type III is 298. VSECK Type IV Electricians Tool Kit (ETK) enables 3 electricians to perform construction & maintenance tasks related to distribution & transmission of electrical power: interior & exterior lighting, installation & repair of lighting & wiring aboard ships. Kit contains conduit benders, auger bits, pliers, knives, wood chisels, crimpers, tube & PVC cutters, key sets, levels multimeter, strippers, wrenches, ladders, electric saws & drills and flood lights. Currently there is a large capability gap in the field that severely needs this materiel solution for a rapidly available, portable and modernized tool kit for the Engineer community, specifically Gap #11, BCT Lethality and Mobility of the critical large scale ground combat operations gaps. VSECK IV replaces one legacy system through modernization, consolidation and optimization. The legacy system this replaces does not meet current mission requirements and does not have any warranty associated with the current components. Army Acquisition Objective for Type IV is 479. VSECK Type V Mason and Concrete Tool Kit (MCTK) includes brick hammers, levels, chalk line, rulers, plumb bobs, trowels, floats, bull floats, specialized floats, screeds, edger, groover, brooms, hoses & nozzles, mortar mixer, scaffolding, sealant sprayer, pliers, vibrator, cut-off saws, grinder, rebar cutters & benders, hacksaws, knee boards, mortar boards & stands, buckets, brushes, laser level, come-a-long, tarps, hoes, rakes & shovels. Currently there is a large capability gap in the field that severely needs this materiel solution for a rapidly available, portable and modernized tool kit for the Engineer community, specifically Gap #11, BCT Lethality and Mobility of the critical large scale ground combat operations gaps. VSECK Type V replaces one legacy system through modernization, consolidation and optimization. The legacy system this replaces does not meet current mission requirements and does not have any warranty associated with the current components. Army Acquisition Objective for Type V is 592. VSECK Type VI Plumbers and Pipefitters Tool Kit (PPTK) is specialized equipment required by a team of plumbers and pipefitters stock to perform construction and maintenance tasks working with metal, brass, aluminum, PVC or PEX. Currently there is a large capability gap in the field that severely needs this materiel solution for a rapidly available, portable and modernized tool kit for the Engineer community, specifically Gap #11, BCT Lethality and Mobility of the critical large scale ground combat operations gaps. Contains hand tools enabling performance of individual & collective tasks related to heating & air conditioning, water distribution, wastewater removal & solid waste removal. The tool load includes: hammers, hack saws, chisels, wrenches, pliers, putty knives, screwdrivers, saws, level plumb bob, toolbox, ladder, powered saws & drills, pry & line up bars, tubing & pipe cutters, floodlight, key set, & plunger. VSECK VI replaces three legacy systems through modernization, consolidation and optimization. The legacy systems this replaces do not meet current mission requirements and do not have any warranty associated with the current components. Army Acquisition Objective for Type VI is 308. Power Utility Kits supports the Family of Power Utility Kits (FoPUK) and the Family of Utility Support Equipment (FUSE). Family of Power Utility Kits (FoPUK) provides the necessary equipment required to perform maintenance, repair and testing of high voltage power transmission lines and medium voltage power generation, to include related distribution equipment. The FoPUK supports Gap#7 Air & Missile Defense and the indispensable nature of electrical power supports administrative, health services and logistical support operations; would all be in jeopardy without the FoPUK. The FoPUK provides a modernized materiel solution to a lineman's tool kit, personal protective equipment (PPE), a rapidly deployable maintenance shelter for medium power generation and distribution systems, and PPE test equipment. Procuring the systems within the Family of Power Utility Kits enable Prime Power Soldiers to safely and effectively construct, operate and maintain medium voltage electrical generation and distribution systems. FoPUK Estimated Army Acquisitoin Objective (AAO): Modernized - Lineman's Tool Kit(M-LTK) 138; Electrical Personal Protective Equipment(E-PPE) 388; Service Kit Power Plant (SKPP) 29; Electrical Personal Protective Equipment Test Equipment (E-PPE-TE) 1. The FUSE consists of four systems that collectively support the prime power operations. These four systems will be used to support US Army operations as part of their wartime mission and in defense support to civil activities. The FUSE will provide Army Prime Power units with the ability to install / remove overhead and underground power distribution lines. The FUSE will provide Soldiers with industry standard equipment while reducing redundancies and improving Soldier mobility, productivity, and safety while performing contingency power operations. Aerial Truck and Cable Tensioning Trailer AAO: 25 each. Digger Truck and Combo Pole Reel Trailer AAO: 15 each

Justification

Justification Family Of Engr Combat and Construction Sets

R70110/ HEPPOE has no FY 2026 funding request. R70196/ Vertical Skill Engr Const Kit Type II has no FY 2026 funding request. R70198/ Vertical Skill Engr Const Kit Type I has no FY 2026 funding request. R70211/ Power Utility Kits has no FY2026 funding request. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.

Budget Line Items(workbook-cited)

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$12.1M
Other Procurement, ArmyAFY25 Enacted$9.22M

Exhibit P-1R

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$2.39M
Other Procurement, ArmyAFY25 Enacted$6.10M

Budget Details(R-2/P-40 facts)

ProjectAll Prior YearsFY24 ActualsFY25 Total
Program Element$135.5M$12.1M$9.22M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.