Skip to content
Fiscal Receipts

Family Of Engr Combat and Construction Sets

ArmyProcurementReconciledBLI9462R70001
What it is
Family Of Engr Combat and Construction Sets (9462R70001) is an Army procurement line funded in the Other Procurement, Army account.
What changed
No FY25→26 comparison — endpoints unavailable or on different bases.
Who gets it
No single contractor is published as this line's leader. 2 linked award records are listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$12.1MP-1 TOA · PB2026
FY25 Enacted
$9.22MP-1 TOA · PB2026
FY26 Request
Not in the FY2026 J-books we ingested
FY25→26 Change
No comparison: endpoints unavailable or on different bases

No FY2026 R-1/P-1 request line for this program element. The FY2026 President's Budget request workbook carries no FY2026 line for it; its last workbook figure is FY2025. An absent line is not by itself an ending — PB2026 renumbered program elements at scale across the services and defense agencies, so this work may continue under a different number. No successor is linked for this line: this site's program-lineage layer holds no keyed edge pointing forward from here. That is an absence in this site's lineage layer, not a finding about the program: if the J-book narrative on this page describes a realignment, it is quoted below in the document's own words, and this note does not restate it.

Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 2 summary figures for FY24 to FY25, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 2 summary figures for FY24 to FY25, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $12.1MFY25: $9.22MFY24FY25
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$12.1M
FY25$9.22M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

4 fiscal years of this program as published (FY2022–FY2025): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span, and 1 year is a break in the line rather than a low value: an edition the program is absent from, never interpolated. The grid below is the same data as text, one cited figure per cell.
4 fiscal years of this program as published (FY2022–FY2025): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span, and 1 year is a break in the line rather than a low value: an edition the program is absent from, never interpolated. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY22FY23FY24FY25

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25
Actuals$36.2M–$12.1M
Enacted–$0$12.1M$9.22M
Request––$12.1M$9.22M

blank = series not published for this year; – = absent from that edition.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Family Of Engr Combat and Construction Sets

The Family of Engineering Combat and Construction Sets (ECACS) is a family of systems that will support combat operations by construction engineer teams in urban, rural, and subterranean and dense environments. ECACS sets utilized in the range of urban environments will aid in detection, protection, surveillance, monitoring, evacuation and clearing. ECACS sets utilized in the range rural environments will allow clearing and troop mobility support areas to include airfields, ports, facilities, and roads. All of the ECACS sets support the Grow the Army initiative, which includes MRBC activations, Combat Engineer Company - Armored (CEC-A) unit conversions, and Combat Engineer Company - Infantry (CEC-I) unit conversions. The Hydraulic, Electric, Pneumatic, Petroleum Operated Equipment (HEPPOE) replaces two legacy systems; the Hydraulic Electric Tool Outfit (HETO) and the Pneumatic Tool & Compressor Outfit (PTCO). Currently there is a large capability gap in the field that severely needs this materiel solution for a rapidly available, portable and modernized tool kit for the Engineer community, specifically GAP #11, BCT Lethality and Mobility of the critical large scale ground combat operations gaps and Gap #8, wet gap crossing. It supports missions by clearing buildings for repair and construction, clearing areas around road construction, port openings, transition and reconstruction operations. Supports critical Infrastructure repair and rescue during natural disasters and civil emergencies. Enables civil authority the security and stability in all areas of Theater Construction Operations. Army Acquisition Objective (AAO) for Hydraulic Electric Pneumatic Petroleum Operated Equipment (HEPPOE) is 990. The Engineer Equipment Set: Urban Operations, Platoon Set (UOpPS) consists of high technology equipment that provides Soldiers with enhanced capabilities to perform missions in urbanized or complex terrain. The Engineer Equipment Set: Urban Operations, Platoon Set (UOpPS) uniquely fills capability gaps that exist at the platoon level for conducting operations in the range of urban environments, specifically GAP #11, BCT Lethality and Mobility of the critical large scale ground combat operations gaps and Gap #8, wet gap crossing. It provides engineers and Soldiers with specialized tools enabling them to conduct operations in urban environments in a safe, more expedient manner. The components include remote viewing instruments, detectors for explosives and gases, portable welders, metal cutting torches, rescue tools, winch, and battery-operated drills and saws. The set standardizes tools, reducing logistical support and provides a Type Classified (TC)-standard Army system. Army Acquisition Objective (AAO) for Urban Operations, Platoon Set (UOpPS) is 1177. The Engineer Equipment Set: Urban Operations, Squad Set (UOpSS) consists of equipment that provides Soldiers with enhanced capabilities to perform missions in urbanized or complex terrain. The Engineer Equipment Set: Urban Operations, Squad Set (UOpSS) uniquely fills capability gaps that exist at the squad level for conducting operations in the range of urban environments, specifically GAP #11, BCT Lethality and Mobility of the critical large scale ground combat operations gaps and Gap #8, wet gap crossing. Components include portable blast shield, collapsible lightweight assault ladders, mechanical entry tools, and rappelling gear. This set supports dismounted engineer Soldiers and others in conducting Military Operations in Urban Terrain (MOUT). The set standardizes tools, reducing logistical support and provides a Type Classified (TC)-standard Army system. Army Acquisition Objective (AAO) for Urban Operations, Squad Set (UOpSS) is 1841. Vertical Skills Engineer Construction Kits (VSECK) has six types which each provide tools and power equipment to meet maintenance and construction mission requirements. VSECK Type I Carpenters Tool Kit Squad (CTKS) is a new configuration containing industrial quality hand tools, safety equipment, deployment bags and tool belts for up to eight Construction Engineers secured in a waterproof rapid inventory case. Currently, there is a large capability gap in the field that severely needs this materiel solution for a rapidly available, portable and modernized tool kit for the Engineer community, specifically GAP #11, BCT Lethality and Mobility of the critical large scale ground combat operations gaps and Gap #8, wet gap crossing. Hand tools include hammers, utility knives, chisels, punches, hacksaws, hand saws, pliers, screwdrivers, squares and tape measures. VSECK Type I replaces one legacy system through modernization, consolidation and optimization. The legacy system this replaces does not meet current mission requirements and does not have any warranty associated with the current components. Army Acquisition Objective for Type I is 1159. VSECK Type II Carpenters Supplemental Tool Kit (CSTK) is a new configuration containing battery powered & carpentry hand tools to increase productivity at remote sites supporting a platoon size element. Currently, there is a large capability gap in the field that severely needs this materiel solution for a rapidly available, portable and modernized tool kit for the Engineer community, specifically GAP #11, BCT Lethality and Mobility of the critical large scale ground combat operations gaps and Gap #8, wet gap crossing. Cordless power tools include: hammer drills, right angle drills, circular saws, jig saws and reciprocating saws. The cordless tools are a minimum of 18v and standardized to use the same power source with a power management system capable of recharging multiple power sources simultaneously. VSECK Type II replaces one legacy system through modernization, consolidation and optimization. The legacy system this replaces does not meet current mission requirements and does not have any warranty associated with the current components. Army Acquisition Objective for Type II is 652. VSECK Type III Carpenters Tool Kit (CTK) is a new configuration containing commercial pneumatic, electric & hand carpentry tools that enable Soldiers to perform common carpentry tasks including construction of fighting positions, shelters, base camps, POW camps, temporary structures, bridges, ports & repair of existing structures. Currently there is a large capability gap in the field that severely needs this materiel solution for a rapidly available, portable and modernized tool kit for the Engineer community, specifically Gap #11, BCT Lethality and Mobility of the critical large scale ground combat operations gaps. Tool load includes pneumatic nailer, blow gun, router, jig saw, 10" table saw, 10" circular saw, 14" cut off saw, 12" miter saw, nibbler, electric shears and tile cutter. VSECK Type III replaces one legacy system through modernization, consolidation and optimization. The legacy system this replaces does not meet current mission requirements and does not have any warranty associated with the current components. Army Acquisition Objective for Type III is 298. VSECK Type IV Electricians Tool Kit (ETK) enables 3 electricians to perform construction & maintenance tasks related to distribution & transmission of electrical power: interior & exterior lighting, installation & repair of lighting & wiring aboard ships. Kit contains conduit benders, auger bits, pliers, knives, wood chisels, crimpers, tube & PVC cutters, key sets, levels multimeter, strippers, wrenches, ladders, electric saws & drills and flood lights. Currently there is a large capability gap in the field that severely needs this materiel solution for a rapidly available, portable and modernized tool kit for the Engineer community, specifically Gap #11, BCT Lethality and Mobility of the critical large scale ground combat operations gaps. VSECK IV replaces one legacy system through modernization, consolidation and optimization. The legacy system this replaces does not meet current mission requirements and does not have any warranty associated with the current components. Army Acquisition Objective for Type IV is 479. VSECK Type V Mason and Concrete Tool Kit (MCTK) includes brick hammers, levels, chalk line, rulers, plumb bobs, trowels, floats, bull floats, specialized floats, screeds, edger, groover, brooms, hoses & nozzles, mortar mixer, scaffolding, sealant sprayer, pliers, vibrator, cut-off saws, grinder, rebar cutters & benders, hacksaws, knee boards, mortar boards & stands, buckets, brushes, laser level, come-a-long, tarps, hoes, rakes & shovels. Currently there is a large capability gap in the field that severely needs this materiel solution for a rapidly available, portable and modernized tool kit for the Engineer community, specifically Gap #11, BCT Lethality and Mobility of the critical large scale ground combat operations gaps. VSECK Type V replaces one legacy system through modernization, consolidation and optimization. The legacy system this replaces does not meet current mission requirements and does not have any warranty associated with the current components. Army Acquisition Objective for Type V is 592. VSECK Type VI Plumbers and Pipefitters Tool Kit (PPTK) is specialized equipment required by a team of plumbers and pipefitters stock to perform construction and maintenance tasks working with metal, brass, aluminum, PVC or PEX. Currently there is a large capability gap in the field that severely needs this materiel solution for a rapidly available, portable and modernized tool kit for the Engineer community, specifically Gap #11, BCT Lethality and Mobility of the critical large scale ground combat operations gaps. Contains hand tools enabling performance of individual & collective tasks related to heating & air conditioning, water distribution, wastewater removal & solid waste removal. The tool load includes: hammers, hack saws, chisels, wrenches, pliers, putty knives, screwdrivers, saws, level plumb bob, toolbox, ladder, powered saws & drills, pry & line up bars, tubing & pipe cutters, floodlight, key set, & plunger. VSECK VI replaces three legacy systems through modernization, consolidation and optimization. The legacy systems this replaces do not meet current mission requirements and do not have any warranty associated with the current components. Army Acquisition Objective for Type VI is 308. Power Utility Kits supports the Family of Power Utility Kits (FoPUK) and the Family of Utility Support Equipment (FUSE). Family of Power Utility Kits (FoPUK) provides the necessary equipment required to perform maintenance, repair and testing of high voltage power transmission lines and medium voltage power generation, to include related distribution equipment. The FoPUK supports Gap#7 Air & Missile Defense and the indispensable nature of electrical power supports administrative, health services and logistical support operations; would all be in jeopardy without the FoPUK. The FoPUK provides a modernized materiel solution to a lineman's tool kit, personal protective equipment (PPE), a rapidly deployable maintenance shelter for medium power generation and distribution systems, and PPE test equipment. Procuring the systems within the Family of Power Utility Kits enable Prime Power Soldiers to safely and effectively construct, operate and maintain medium voltage electrical generation and distribution systems. FoPUK Estimated Army Acquisitoin Objective (AAO): Modernized - Lineman's Tool Kit(M-LTK) 138; Electrical Personal Protective Equipment(E-PPE) 388; Service Kit Power Plant (SKPP) 29; Electrical Personal Protective Equipment Test Equipment (E-PPE-TE) 1. The FUSE consists of four systems that collectively support the prime power operations. These four systems will be used to support US Army operations as part of their wartime mission and in defense support to civil activities. The FUSE will provide Army Prime Power units with the ability to install / remove overhead and underground power distribution lines. The FUSE will provide Soldiers with industry standard equipment while reducing redundancies and improving Soldier mobility, productivity, and safety while performing contingency power operations. Aerial Truck and Cable Tensioning Trailer AAO: 25 each. Digger Truck and Combo Pole Reel Trailer AAO: 15 each

Justification

Justification — Family Of Engr Combat and Construction Sets

R70110/ HEPPOE has no FY 2026 funding request. R70196/ Vertical Skill Engr Const Kit Type II has no FY 2026 funding request. R70198/ Vertical Skill Engr Const Kit Type I has no FY 2026 funding request. R70211/ Power Utility Kits has no FY2026 funding request. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$12.1M
Other Procurement, ArmyAFY25 Enacted$9.22M

Exhibit P-1R

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$2.39M
Other Procurement, ArmyAFY25 Enacted$6.10M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 Total
Program Element$135.5M$12.1M$9.22M

Follow the dollar

No follow-the-dollar view — none of this program's high-confidence awards records a positive obligation at any place of performance (flows cover 312 of 1,938 programs). why coverage is partial? →

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

RecipientPIIDConfidence
INDUSTRIES FOR THE BLIND AND VISUALLY IMPAIRED, INC.W56HZV23D0003high
KIPPER TOOL COMPANYW56HZV20D0015high

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

8 mentions from the Senate LDA disclosure database.

JOHNS HOPKINS UNIVERSITYFamily|Construction2026matched 2+ title words

Advised on U.S. Family Health Plan.

JOHNS HOPKINS UNIVERSITYFamily|Construction2026matched 2+ title words

Advised on U.S. Family Health Plan; Monitored H.R. 9393, the Lower Costs, More Transparency Act of 2026; Monitored H.R.

UNITED AUTOMOBILE AEROSPACE & AGRICULTURAL IMPLEMENT WORKERSFamily|Construction2026matched 2+ title words

Protecting the Right to Organize (PRO) Act. National Institutes of Health (NIH) grants and funding. National Labor…

UNITED AUTOMOBILE AEROSPACE & AGRICULTURAL IMPLEMENT WORKERSFamily|Construction2026matched 2+ title words

Protecting the Right to Organize (PRO) Act. Infrastructure Investment and Jobs Act (IIJA) implementation. National…

BAE SYSTEMS INCCombat|Construction2025matched 2+ title words

National Defense Authorization Act for Fiscal Year 2026 (HR 3838/S 2296); provisions regarding R&D - Navy, Air Force…

BAE SYSTEMS INCCombat|Construction2025matched 2+ title words

Department of Defense Appropriations Act, 2026 (HR 4016/ S XXXX); provisions regarding R&D - Army, Navy/USMC, Air…

BAE SYSTEMS INCCombat|Construction2025matched 2+ title words

Full-Year Continuing Appropriations and Extensions Act, 2025 (PL 119-4); provisions regarding R&D - Army, Navy/USMC…

UNITED AUTOMOBILE AEROSPACE & AGRICULTURAL IMPLEMENT WORKERSFamily|Construction2025matched 2+ title words

Public Service Loan Forgiveness Program. Student debt cancellation. Higher education affordability. Title IX. Family…

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Family Of Engr Combat and Construction Sets. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.