Skip to content
Fiscal Receipts

Life Cycle Software Support (LCSS)

ArmyProcurementReconciledBLI9442BD3955
What it is
Life Cycle Software Support (LCSS) (9442BD3955) is an Army procurement line funded in the Other Procurement, Army account.
What changed
-$185.0K FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$4.27MP-1 TOA · PB2026
FY25 Enacted
$5.36MP-1 TOA · PB2026
FY26 Request
$5.17MP-1 TOA · PB2026
FY25→26 Change
-$185.0KP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $4.27MFY25: $5.36MFY26: $5.17MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$4.27M
FY25$5.36M
FY26$5.17M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$5.18M$4.59M$4.27M
Enacted–$4.59M$4.27M$5.36M
Request––$4.27M$5.36M$5.17M

blank = series not published for this year; – = absent from that edition.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Life Cycle Software Support (LCSS)

The CECOM Software Engineering Center (SEC) provides depot maintenance for weapon system specific Post Production Software Support (PPSS) supporting Intelligence, Force Protection, Electronic Warfare, Aviation, Mission Command, Tactical Radio, Tactical Network, Transport, Counter Fire Radar, and Satellite Communications programs. It supports readiness of Army network systems, mission command capabilities and intelligence and sensor systems. Policy for PPSS requires that system managers provide initial host capabilities for new systems and that the Life Cycle Management Centers (LCMCs) provide upgrades and replacement of obsolete equipment. Significant portions of host and network equipment are no longer economically repairable and/or are reaching obsolescence. There is a requirement to respond to emergency requests from the field for Software Engineering support, in order to maintain operational readiness of deployed weapon systems. With host computers and peripherals having a life span of approximately five years and SEC performing its mission over a continuous period of time beyond five years, equipment and labs must be replaced and/or upgraded regularly to deal with obsolescence and take advantage of the continual improvements in technology that are indigenous to high-technology based weapon systems and their software support environments. SEC must purchase these items to meet systems' mission requirements. SEC must also develop Continuity of Operations (COOP) sites in order to reduce risk of a catastrophic failure at the primary location. These sites will restore data and the software development environment, allowing SEC to maintain critical software updates, accreditation, and IV&V. Major equipment purchases include servers and server storage. CECOM SEC also is also continuing development on its Software Engineering Environment (SE2), which will support Continuous Integration/Continuous Delivery (CI/CD) and Army software modernization for weapon.

Justification

Justification — Life Cycle Software Support (LCSS)

FY 2026 Base procurement dollars in the amount of $5.175M supports maintaining software capabilities in labs such as: 1. ISD OPA Lab Purchases: Lab requirements to maintain UCRN/SCRN for all of ISD includes the purchase 5 Dell R650s to replace degraded XR2x that are currently in use. Also includes the purchase of a customized storage to prevent future critical hard drive failures. 2. ICS OPA - APR39EV2 B-Kit - APR-39EV2 B-Kit [ (1) - Processor, (4) - Receivers, (5) - Antennas, (1) - Control Unit, (1) - Display Unit, and (1) - Interconnection Wiring Harness. Support the ARAT PPSS mission by developing Mission Software (MS) to Force Protection Systems (FPS). This addition will enable the existing ARAT developers the ability to produce more MS necessary to meet added sustainment requirements. 3. Test Infrastructure - Simulators - Software Defined Radios (SDRs): Software Defined Radios (SDR) will add increased capability and support to the ARAT PPSS mission by simulating threats and background emissions of the environment in which Force Protection Systems (FPS) operate. This added capability will enable the existing ARAT simulators the ability to produce a signal environment necessary to meet added sustainment requirements. 4. IEWS Infrastructure: To comply with Army's directives and implement a continuous iteration / continuous deployment (CI/CD) architecture and simultaneously update our existing infrastructure in support of a Zero Trust Architecture (ZTA). OPA funds will be used for the purchase and implementation of new network devices including firewalls, routers, intrusion detection systems. These will be used to create a new pipeline allowing IEWSD to deliver software directly to the field. Additionally, we will introduce new devices to support identity and authentication requirements in support of ZTA. 5. On-Premises Large Language Model (LLM) Development Environment: Infrastructure Solution to provide adequate server and data processing power and storage to support the adoption of on-premises Large Language Model (LLM) testing, refinement, and deployment to the SEC workforce. 6. SE2-Classified Phase II: Infrastructure Solution to add additional capability to the SEC SE2 -Classified that will enhance capability and support tactical systems in their CI/CD efforts. 7. SE2 DREN to Admin Phase III: Infrastructure Solution to allow for Software SE2 to be available in SEC work areas outside of the labs reducing the need to operate within limited lab space. Solution will also help transform current conference rooms to multi-function huddle rooms for enhanced onsite collaboration. 8. SE2 Hybrid Cloud Phase IV: Infrastructure Solution to provide additional on-premises/cloud capability to support SE2 in a Hybrid cloud environment. Solution will add additional capability, widen secure access and reduce costs by reducing the need to procure and maintain separate computers for developers.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$4.27M
Other Procurement, ArmyAFY25 Enacted$5.36M
Other Procurement, ArmyAFY26 Disc. Request$5.17M
Other Procurement, ArmyAFY26 Total$5.17M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$131.3M$4.27M$5.36M$5.17M$5.17M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Life Cycle Software Support (LCSS). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.