Printed from https://fiscalreceipts.com/program/9266AD5070/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
AIR & MSL Defense Planning & Control Sys
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $68.9M |
| FY25 | $80.0M |
| FY26 | $33.1M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $67.2M | $72.6M | $68.9M | ||
| Enacted | – | $72.6M | $68.9M | $80.0M | |
| Request | – | – | $68.9M | $80.0M | $33.1M |
blank = series not published for this year; – = absent from that edition.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — AIR & MSL Defense Planning & Control Sys
This funding line supports the Air and Missile Defense, Army Modernization Priorities. The Air Missile Defense Planning and Control System (AMDPCS) provides integration of air and missile defense operations at all echelons. AMDPCS is comprised of the following major subsystems: Air Missile Defense Work Station (AMDWS) ensures updated interfaces for interoperability between Air Defense and the rest of the force, allowing the Commander the visibility and situational understanding of the airspace; other tools in AMDWS affords Soldiers horizontal and vertical collaborative planning with adjacent units. Common Data Link Interface-Module (CDLI-M) serves as a joint tactical data-link gateway/air picture. Forward Area Air Defense (FAAD), correlates the joint and local air picture and when displayed on AMDWS, provides a near real time, three-dimensional air picture for the Commander. Joint Tactical Terminal (JTT) provides Soldiers Theater Ballistic Missile (TBM) early warning allowing them to take appropriate actions. AMDPCS are currently fielded to Army Air and Missile Defense Commands (AAMDC), Air Defense Artillery Brigades, (ADA BDE), Air and Missile Defense Battalions (AMD BN) and Terminal High Altitude Area Defense Batteries (THAAD BTRY). Air Defense Airspace Management (ADAM), a variant of AMDPCS, are fielded to Corps, Divisions, Brigade Combat Teams (BCTs) and multi-functional support brigades. As part of the capability and technology reuse, AMDWS external interfaces are being leveraged by Integrated Battle Command System (IBCS) to avoid redevelopment of existing capabilities. AMDWS and FAAD are core components of the Air and Missile Defense system-of-systems currently deployed in combat zones. The Approved Acquisition Objective (AAO) for AMDPCS shelter systems is 503. FY 2026 Base procurement dollars support Maneuver Short Range Air Defense (M-SHORAD) Battalions and Grow the Army (GTA) requirements.
Justification
Justification — AIR & MSL Defense Planning & Control Sys
FY 2026 Base procurement dollars in the amount of $33.103 million procures the following AMDPCS shelters: one (1) AMDPCS-B shelter system, two (2) Air Battle Management Operations Centers (ABMOCs) shelters, and one (1) Sensor C2 Node shelter for Army National Guard M-SHORAD Battalions. Base dollars also procure net ready hardware for five (5) AMDPCS-A & B shelter systems, fourteen (14) ADAM shelters in conjunction with Engineering Change Proposals (ECPs) and Modification Work Orders (MWOs), and 228 AMDPCS workstations and associated software and support (AMDWS, FAAD and CDLI-M) for AMDPCS shelter systems. Finally, these procurement dollars include program management, shipping/fielding costs, and New Equipment Training (NET). In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing the military support to civil authorities. Decrease from FY 2025 to FY 2026 reflects a reduction in AMDPCS shelter procurement quantity.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Army | A | FY24 Actuals | $68.9M |
| Other Procurement, Army | A | FY25 Enacted | $80.0M |
| Other Procurement, Army | A | FY26 Disc. Request | $33.1M |
| Other Procurement, Army | A | FY26 Total | $33.1M |
Exhibit P-1R
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Army | A | FY24 Actuals | $16.0M |
| Other Procurement, Army | A | FY25 Enacted | $62.0M |
| Other Procurement, Army | A | FY 2026 request | $12.7M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $1.25B | $68.9M | $80.0M | $33.1M | $33.1M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not AIR & MSL Defense Planning & Control Sys. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O238
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O239
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O242
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
FY2026 Department of Defense Budget: Procurement Programs (P-1R) · comptroller.war.gov
Exhibit P-1R · N97
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1R_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
Other Procurement - BA 3, 4 & 6 - Other Support Equipment, Initial Spares and Agile Portfolio Management · www.asafm.army.mil