Skip to content
Fiscal Receipts

AIR & MSL Defense Planning & Control Sys

ArmyProcurementReconciledBLI9266AD5070
What it is
AIR & MSL Defense Planning & Control Sys (9266AD5070) is an Army procurement line funded in the Other Procurement, Army account.
What changed
-$46.9M FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$68.9MP-1 TOA · PB2026
FY25 Enacted
$80.0MP-1 TOA · PB2026
FY26 Request
$33.1MP-1 TOA · PB2026
FY25→26 Change
-$46.9MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $68.9MFY25: $80.0MFY26: $33.1MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$68.9M
FY25$80.0M
FY26$33.1M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$67.2M$72.6M$68.9M
Enacted–$72.6M$68.9M$80.0M
Request––$68.9M$80.0M$33.1M

blank = series not published for this year; – = absent from that edition.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — AIR & MSL Defense Planning & Control Sys

This funding line supports the Air and Missile Defense, Army Modernization Priorities. The Air Missile Defense Planning and Control System (AMDPCS) provides integration of air and missile defense operations at all echelons. AMDPCS is comprised of the following major subsystems: Air Missile Defense Work Station (AMDWS) ensures updated interfaces for interoperability between Air Defense and the rest of the force, allowing the Commander the visibility and situational understanding of the airspace; other tools in AMDWS affords Soldiers horizontal and vertical collaborative planning with adjacent units. Common Data Link Interface-Module (CDLI-M) serves as a joint tactical data-link gateway/air picture. Forward Area Air Defense (FAAD), correlates the joint and local air picture and when displayed on AMDWS, provides a near real time, three-dimensional air picture for the Commander. Joint Tactical Terminal (JTT) provides Soldiers Theater Ballistic Missile (TBM) early warning allowing them to take appropriate actions. AMDPCS are currently fielded to Army Air and Missile Defense Commands (AAMDC), Air Defense Artillery Brigades, (ADA BDE), Air and Missile Defense Battalions (AMD BN) and Terminal High Altitude Area Defense Batteries (THAAD BTRY). Air Defense Airspace Management (ADAM), a variant of AMDPCS, are fielded to Corps, Divisions, Brigade Combat Teams (BCTs) and multi-functional support brigades. As part of the capability and technology reuse, AMDWS external interfaces are being leveraged by Integrated Battle Command System (IBCS) to avoid redevelopment of existing capabilities. AMDWS and FAAD are core components of the Air and Missile Defense system-of-systems currently deployed in combat zones. The Approved Acquisition Objective (AAO) for AMDPCS shelter systems is 503. FY 2026 Base procurement dollars support Maneuver Short Range Air Defense (M-SHORAD) Battalions and Grow the Army (GTA) requirements.

Justification

Justification — AIR & MSL Defense Planning & Control Sys

FY 2026 Base procurement dollars in the amount of $33.103 million procures the following AMDPCS shelters: one (1) AMDPCS-B shelter system, two (2) Air Battle Management Operations Centers (ABMOCs) shelters, and one (1) Sensor C2 Node shelter for Army National Guard M-SHORAD Battalions. Base dollars also procure net ready hardware for five (5) AMDPCS-A & B shelter systems, fourteen (14) ADAM shelters in conjunction with Engineering Change Proposals (ECPs) and Modification Work Orders (MWOs), and 228 AMDPCS workstations and associated software and support (AMDWS, FAAD and CDLI-M) for AMDPCS shelter systems. Finally, these procurement dollars include program management, shipping/fielding costs, and New Equipment Training (NET). In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing the military support to civil authorities. Decrease from FY 2025 to FY 2026 reflects a reduction in AMDPCS shelter procurement quantity.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$68.9M
Other Procurement, ArmyAFY25 Enacted$80.0M
Other Procurement, ArmyAFY26 Disc. Request$33.1M
Other Procurement, ArmyAFY26 Total$33.1M

Exhibit P-1R

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$16.0M
Other Procurement, ArmyAFY25 Enacted$62.0M
Other Procurement, ArmyAFY 2026 request$12.7M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$1.25B$68.9M$80.0M$33.1M$33.1M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not AIR & MSL Defense Planning & Control Sys. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.