Army Command Post Integrated Infrastructure (

ArmyProcurementReconciledBLI9042B29810
What it is
Army Command Post Integrated Infrastructure ( (9042B29810) is an Army procurement line funded in the Other Procurement, Army account.
What changed
+$718.2M FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$78.5MP-1 TOA · PB2026
FY25 Enacted
$5.00MP-1 TOA · PB2026
FY26 Request
$723.2MP-1 TOA · PB2026
FY25→26 Change
+$718.2MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $78.5MFY25: $5.00MFY26: $723.2MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$78.5M
FY25$5.00M
FY26$723.2M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$49.4M$50.5M$78.5M
Enacted–$60.5M$78.5M$5.00M
Request––$78.5M$20.0M$723.2M

blank = series not published for this year; – = absent from that edition.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Army Command Post Integrated Infrastructure (CPI2)

SSN B29815 / PREDICTIVE LOGISTICS is a new start within the Army Command Post Integrated Infrastructure (CPI2) program in FY 2026 Effective with the 11 Feb 2025 Acquisition Decision Memorandum (ADM), Command Post Integrated Infrastructure (CPI2) was renamed to Command Post Modernization (CPMod). CPI2 (hereafter referred to as CPMod) (B29801) is aligned to and supports the Army Next Generation Command Control (NGC2) initiative to modernize Command and Control (C2) systems, Infrastructure layer. This funding is to accelerate divestment of legacy equipment. The Next Generation Command and Control (NGC2) is a top modernization priority for the U.S. Army, aimed at transforming how we communicate, coordinate, and operate across the battlefield. Command Post Modernization (CP Mod) plays a foundational role in this transformation by delivering the infrastructure that connects tactical communications, data systems, and applications into a cohesive ecosystem. CP Mod enables rapid integration of emerging technologies and modular upgrades-ensuring the Army can outpace threats remain operationally flexible in contested environments. Without CP Mod the Army cannot execute the infrastructure layer to support the NGC2 architecture. The B29801 funding line is a strategic investment by the Army to procure tactical edge compute (TEC) and store hardware and integration efforts. Lessons learned at Project Convergence Capstone 5 (PCC5) have significantly increased the demand for On The Move (OTM) capability and distributed command and control nodes. Army recognizes a need to leverage technology enabling resilient and intuitive command posts. TEC provides the Army a distributable, common compute and store solution capable of hosting Next Generation Command and Control (NGC2) applications in a modular, configurable hardware package. TEC delivery will move Army Command and Control capabilities away from costly and complex separate "stove-piped boxes" with individual applications, reducing training and sustainment costs associated with multiple unique HW installation requirements. The use of open standards will make it simpler and more cost-effective to upgrade capabilities and/or keep pace with commercial technology by eliminating complex integration challenges and proprietary interfaces. Integration will address up to 20 unique NGC2 enabling technologies across multiple vehicle platform type/variants within Army units. Predictive Logistics (PL) (B29815) supports the Army's Next Generation Command and Control (NGC2) initiative to modernize the Command and Control (C2) systems, Infrastructure Layer. Predictive Logistics (PL) is a logistics optimization effort that will deliver hardware/software capabilities that improve unit readiness, support commanders' abilities to monitor, predict, and sustain combat power, and enhance existing maintenance and supply processes. Establishing automated data collection from self-reporting platform sensors, PL will process, store, and disseminate Logistics Status (LOGSTAT) data to the Common Operational Pictures (COP) at platform, command, and enterprise echelons via the Unified Network. This capability will also predict future logistics needs with a focus on Class III (petroleum, oil, lubricants) and Class V (ammunition/explosives) consumables and maintenance alerts, enhancing mission planning and execution.

Justification

Justification — Army Command Post Integrated Infrastructure (CPI2)

FY2026 Base procurement dollars in the amount of $723.187 million supports the following efforts: B29801: The Next Generation Command and Control (NGC2) is a top modernization priority for the U.S. Army, aimed at transforming how we communicate, coordinate, and operate across the battlefield. Command Post Modernization (CP Mod) plays a foundational role in this transformation by delivering the infrastructure that connects tactical communications, data systems, and applications into a cohesive ecosystem. CP Mod enables rapid integration of emerging technologies and modular upgrades-ensuring the Army can outpace threats remain operationally flexible in contested environments. Without CP Mod the Army cannot execute the infrastructure layer to support the NGC2 architecture. FY2026 base procurement dollars in the amount of $718.581 million procures the Army Tactical Edge Compute (TEC) hardware, conducts vehicle installation across multiple platform types/variants and includes fielding of NGC2 infrastructure for Army priority units. The NGC2 infrastructure enables the Army to leverage software applications across the tactical network at all echelons. The TEC provides a scalable compute and store solution independent of warfighting software applications. This funding enables command post modernization through modular, on-the-move tactical command post vehicles, and supports Army's intent to deliver a more mobile network and technologically enhanced capabilities to the operational force. Funds also include costs for logistics, and contractor and matrix personnel directly in support of the mission. Predictive Logistics (PL) (B29815): FY2026 base procurement dollars in the amount of $4.606 million will provide funding for platform engineering, integration, and assessments of Predictive Logistics hardware and software solutions. Funds have been consolidated in this line to support hardware and software procurement, integration and engineering for vehicle platform programs that have developed platform-specific LOGSTAT data collection solutions. Funds will also support program management support for PL.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$78.5M
Other Procurement, ArmyAFY25 Enacted$5.00M
Other Procurement, ArmyAFY26 Disc. Request$723.2M
Other Procurement, ArmyAFY26 Total$723.2M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$122.8M$78.5M$5.00M$723.2M$723.2M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

12 mentions from the Senate LDA disclosure database.

MICROSOFT CORPORATIONIntegrated|Infrastructure2026matched 2+ title words

S. 4784, H.R. 8880, National Defense Authorization Act. S. 4615, H.R. 9624, Intelligence Authorization Act. Defense…

MICROSOFT CORPORATIONIntegrated|Infrastructure2026matched 2+ title words

National Defense Authorization Act (No Bill Number). Intelligence Authorization Act (No Bill Number). Defense…

BAE SYSTEMS INCIntegrated|Infrastructure2025matched 2+ title words

Department of Defense Appropriations Act, 2026 (HR 4016/ S 2572); provisions regarding R&D - Navy, Air Force, Space…

BAE SYSTEMS INCIntegrated|Infrastructure2025matched 2+ title words

Department of Defense Appropriations Act, 2026 (HR 4016/S 2572); provisions regarding R&D - Navy, Air Force, Space…

MICROSOFT CORPORATIONIntegrated|Infrastructure2025matched 2+ title words

S. 2296, National Defense Authorization Act. S. 2342, Intelligence Authorization Act. Defense Appropriations. Quantum…

MICROSOFT CORPORATIONIntegrated|Infrastructure2025matched 2+ title words

S. 2296, National Defense Authorization Act. S. 2342, Intelligence Authorization Act. Defense Appropriations. Quantum…

MICROSOFT CORPORATIONIntegrated|Infrastructure2025matched 2+ title words

S. 2296, National Defense Authorization Act. S. 2342, Intelligence Authorization Act. Defense Appropriations. Quantum…

MICROSOFT CORPORATIONIntegrated|Infrastructure2025matched 2+ title words

National Defense Authorization Act (no bill number). Intelligence Authorization Act (no bill number) Defense…

MICROSOFT CORPORATIONIntegrated|Infrastructure2024matched 2+ title words

H.R. 2670, S. 2226, National Defense Authorization Act of 2024. H.R. 3932, S. 2103 Intelligence Authorization Act for…

MICROSOFT CORPORATIONIntegrated|Infrastructure2024matched 2+ title words

H.R. 2670, S. 2226, National Defense Authorization Act of 2024. H.R. 3932, S. 2103 Intelligence Authorization Act for…

MICROSOFT CORPORATIONIntegrated|Infrastructure2024matched 2+ title words

H.R. 2670, S. 2226, National Defense Authorization Act of 2024. H.R. 3932, S. 2103 Intelligence Authorization Act for…

MICROSOFT CORPORATIONIntegrated|Infrastructure2024matched 2+ title words

H.R. 2670, S. 2226, National Defense Authorization Act of 2024. H.R. 3932, S. 2103 Intelligence Authorization Act for…

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Army Command Post Integrated Infrastructure (. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.