Tactical Electric Power Recapitalization

ArmyProcurementReconciledBLI9012R42501
What it is
Tactical Electric Power Recapitalization (9012R42501) is an Army procurement line funded in the Other Procurement, Army account.
What changed
No FY25→26 comparison — endpoints unavailable or on different bases.
Who gets it
No single contractor is published as this line's leader. 1 linked award record is listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$19.1MP-1 TOA · PB2026
FY25 Enacted
Not in the FY2026 J-books we ingested
FY26 Request
Not in the FY2026 J-books we ingested
FY25→26 Change
No comparison: endpoints unavailable or on different bases

No FY2026 R-1/P-1 request line for this program element. The FY2026 President's Budget request workbook carries no FY2026 line for it; its last workbook figure is FY2024. An absent line is not by itself an ending — PB2026 renumbered program elements at scale across the services and defense agencies, so this work may continue under a different number. No successor is linked for this line: this site's program-lineage layer holds no keyed edge pointing forward from here. That is an absence in this site's lineage layer, not a finding about the program: if the J-book narrative on this page describes a realignment, it is quoted below in the document's own words, and this note does not restate it.

Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

Insufficient trajectory data for sparkline (only FY24 available).

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

4 fiscal years of this program as published (FY2022–FY2025): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
4 fiscal years of this program as published (FY2022–FY2025): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY22FY23FY24FY25

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25
Actuals$10.5M$8.76M$19.1M
Enacted–$8.29M$11.1M–
Request––$11.1M$12.1M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $11.1M for FY2024; the PB2026 book reported $19.1M as actual total obligation authority — $8.00M above the request. 19.1 − 11.1 = 8.0 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Tactical Electric Power Recapitalization

This line provides power generation and distribution that enables the Army to employ Air and Missile Defense systems across the operational spectrum. The Deployable Power Generation and Distribution System (DPGDS) Power Unit (PU) provides mission critical power to the Nation's strategic missile defense assets; specifically the Army/Navy Transportable Radar Surveillance (AN/TPY-2) X-Band Radar in Forward-Based Mode (FBM). These radars are critical in detecting, classifying and tracking ballistic missiles. The power unit is also used by the Army's only Prime Power Battalion to support its National Response Framework (NRF) mission, providing DoD support to civil defense and climate related disasters. The recapitalization effort leverages significant technology advancements over past 15 years and extends the economic useful life of these PUs by bringing the set back to zero hours and reduces emissions with a newer EPA Tier engine. The recapitalized MEP-PU-810 will come in two variants, the MEP-PU-810C, a towed trailer configuration, and the MEP-PU-810D, a 5th wheel configuration DoT approved for over the road use at 55 mph. Throughout the Department of Defense, the MEP-PU-810D supports numerous missions, such as supporting the nation's Ballistic Missile Defense System. Capabilities: Once fielded, the MEP-PU-810C/D Power Unit (PU) will be at the center of the Army's Deployable Power Generation and Distribution System (DPGDS). Portable, multi-fuel engine driven generator rated to provide 800kW of electrical power at 4160 Volts Alternating Current (VAC) and provides the transition from tactical electric power to Shore/Host Nation power. Completely self-contained, integrated trailer. Capable of operating standalone or in a multi-unit Microgrid configuration equipped with modern, built-in controls & its own electrical distribution bus, High Altitude Electromagnetic Pulse (HEMP) hardened. This program is included in the OPA Budget Line Consolidation. In FY 2025, the Tactical Electric Power Recapitalization (R42501) program was consolidated into the Generators and Associated Equipment (MA9800) program.

Justification

Justification — Tactical Electric Power Recapitalization

This program is included in the OPA Budget Line Consolidation. In FY 2025, the Tactical Electric Power Recapitalization (R42501) program was consolidated into the Generators and Associated Equipment (MA9800) program. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), these items are necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$19.1M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 Actuals
Program Element$94.3M$19.1M

Follow the dollar

No follow-the-dollar view — none of this program's high-confidence awards records a positive obligation at any place of performance (flows cover 312 of 1,938 programs). why coverage is partial? →

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

RecipientPIIDConfidence
PD SYSTEMS INC.W909MY17D0002high

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

17 mentions from the Senate LDA disclosure database.

PORTLAND GENERAL ELECTRICElectric|Power2026matched 2+ title words

H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric…

PORTLAND GENERAL ELECTRICElectric|Power2026matched 2+ title words

H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric…

PORTLAND GENERAL ELECTRICElectric|Power2026matched 2+ title words

H.R. 3616, Reliable Power Act H.R. 1047, Grid Power Act H.R. 3632, Power Plant Reliability Act H.R. 3638, Electric…

PHILLIPS 66 COMPANYElectric|Power2025matched 2+ title words

Issues related to electric vehicles and fuel efficiency standards. H.J.Res.89 - Providing congressional disapproval…

PORTLAND GENERAL ELECTRICElectric|Power2025matched 2+ title words

S.190- Energy Threat Analysis Program Act of 2025; H.R. 3616, Reliable Power Act H.R. 1047, Grid Power Act H.R. 3632…

PORTLAND GENERAL ELECTRICElectric|Power2025matched 2+ title words

S.914, Energy Threat Analysis Center Establishment Act; Draft legislation on the interconnection queue; Draft…

PORTLAND GENERAL ELECTRICElectric|Power2025matched 2+ title words

H.R. 3616, Reliable Power Act; H.R. 1047, Grid Power Act; H.R. 3632, Power Plant Reliability Act; H.R. 3638, Electric…

PORTLAND GENERAL ELECTRICElectric|Power2025matched 2+ title words

H.R. 3616, Reliable Power Act H.R. 1047, Grid Power Act H.R. 3632, Power Plant Reliability Act H.R. 3638, Electric…

ROLLS-ROYCE NORTH AMERICA AND ITS AFFILIATESElectric|Power2025matched 2+ title words

Electric Supply Chain Act (H.R. 3638 / S. 3499): provisions related to Nuclear Energy; issues related to nuclear…

HONEYWELL INTERNATIONALElectric|Power2024matched 2+ title words

Issues concerning Superfund site cleanups (no pending legislation) Issues concerning energy conservation, energy…

HONEYWELL INTERNATIONALElectric|Power2024matched 2+ title words

Issues concerning Superfund site cleanups (no pending legislation) Issues concerning energy conservation, energy…

LEONARDO DRS, INC. (FKA DRS TECHNOLOGIES, INC.)Electric|Power2024matched 2+ title words

House (no bill number) and Senate (no bill number) Fiscal Year 2025 Department of Defense Appropriations Bill - issues…

PORTLAND GENERAL ELECTRICElectric|Power2024matched 2+ title words

S. 2651, the SITE Act; S. 1456, the SPUR Act; S. 1399, the Building American Energy Security Act; S. 1521, Community…

PORTLAND GENERAL ELECTRICElectric|Power2024matched 2+ title words

S. 4753 - Energy Permitting Reform Act of 2024; S. 2651, the SITE Act; S. 1456, the SPUR Act; S. 1399, the Building…

PORTLAND GENERAL ELECTRICElectric|Power2024matched 2+ title words

S.4753 - Energy Permitting Reform Act of 2024; S. 2651, the SITE Act; S. 1456, the SPUR Act; S. 1399, the Building…

PORTLAND GENERAL ELECTRICElectric|Power2024matched 2+ title words

S. 2651, the SITE Act; S. 1456, the SPUR Act; S. 1339, the Building American Energy Security Act; S. 1521, Community…

PORTLAND GENERAL ELECTRICElectric|Power2024matched 2+ title words

S. 2651, the SITE Act; S. 1456, the SPUR Act; S. 1399, the Building American Energy Security Act; S. 1521, Community…

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Tactical Electric Power Recapitalization. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.