Skip to content
Fiscal Receipts

Modification Of In Svc Equip

ArmyProcurementReconciledBLI8992DA0924
What it is
Modification Of In Svc Equip (8992DA0924) is an Army procurement line funded in the Other Procurement, Army account.
What changed
-$54.1M FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$131.5MP-1 TOA · PB2026
FY25 Enacted
$152.8MP-1 TOA · PB2026
FY26 Request
$98.7MP-1 TOA · PB2026
FY25→26 Change
-$54.1MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $131.5MFY25: $152.8MFY26: $98.7MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$131.5M
FY25$152.8M
FY26$98.7M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$212.3M$140.9M$131.5M
Enacted–$140.9M$80.3M$152.8M
Request––$80.3M$169.7M$98.7M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $80.3M for FY2024; the PB2026 book reported $131.5M as actual total obligation authority — $51.2M above the request. 131.5 − 80.3 = 51.2 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Modification Of In Svc Equip

This budget line funds Modifications of In-Service Equipment to the Tactical Wheeled Vehicle fleet to include trailers and enablers. It is used to develop material solutions and also to procure hardware, materials, and the hardware installation cost required to complete the modification. Modifications are performed to correct safety deficiencies; increase mission capabilities and interoperability; extend the useful life; improve supportability; upgrade existing technology; increase efficiency; improve readiness; address obsolescence issues; and to meet new and/or changing statutory and regulatory requirements. By modifying existing equipment, the Army maintains a ready, supportable inventory of equipment that meets current requirements and regulations at a cost considerably below that of buying new equipment. The Joint Light Tactical Vehicle (JLTV) and High Mobility Multi-purpose Vehicle (HMMWV) modifications support safety related efforts associated with vehicle power distribution, fire suppression systems, shelter integration, command and control, anti-lock braking and electronic stability control, hardware obsolescence, and emerging technologies which are addressed through design modifications and/or field retrofits. The JLTV and HMMWV Modification of in-Service Equipment is part of the Army Transformation Initiative. The Modification Hardware funding line supports ISV kits, field retrofits, and capability upgrades to support Army's initiative and close capability gaps. Kits can include but not limited to winch, windshield, power, litters and covers. ISV enables infantry squads to operate dispersed and cover greater distances that will achieve positions of advantage and enables platoons and companies to transport and power enabling capabilities at the speeds, distances, and survivability required to support ISV enabled infantry squads. The Family of Heavy Tactical Vehicles (FHTV) line funds M1070A1 tractor to M1300 tractor modifications, consisting of light-weighting the tractor and installing powertrain upgrades. Existing M1070A1 HETS tractors will be modified to M1300 tractors in order to meet the EHETS Capability Development Document (CDD) requirements, achieving a payload capacity of a maximum of 90 tons while maintaining a capacity of 78.5 tons with operational road permits in the European theater of operations. The M1300 will be the designated prime mover for both the M1302 EHETS trailer and the M1311 Medium Equipment Trailer (MET) to transport the heaviest (EHETS Trailer) and the tallest (MET) tracked vehicles. This modification will ensure a flexible theater posture, and freedom of maneuver for joint forces on the current dynamic battlefield. Both the M1300 and M1070A1 configurations allow for the use of the HETS Urban Survivability Kit (HUSK) armored cab. This line also funds modifications for active safety, autonomy, modernization, Modification Work Orders (MWOs), and Predictive Logistics Kits. The Family of Medium Tactical Vehicles (FMTV) modifications supports both retrofit applications, and capability upgrades for multi-mission protected vehicle systems. These modifications to in-service FMTVs develop and procure material solutions to modernize platforms and enhance warfighter capabilities which aligns to the executive order "Modernizing Defense Acquisition and Spurring Innovation in the Defense Industrial Base". Specifically, these upgrades improve system transportation and reduce logistical burden, contributing to critical operational goals for Large Scale Combat Operations (LSCO) and Multi-Domain Operations (MDO). The resulting improvements will enhance vehicle performance in contested environments by reducing engine idle fuel consumption and increasing multi-faceted export power availability. Efforts include expanding the Joint Force's long-range, ground-launched anti-ship strike capability and antiballistic missile batteries, through PM THAAD (Terminal High Altitude Area Defense), enhancing mobility and agility for rapid deployment and relocation of operations and fire support, enabling support for advanced weapon systems, missile defense, command posts, and directed energy weapons (Long Range Precision Fire (LRPF), High Mobility Artillery Rocket System (HIMARS), Air & Missile Defense, and Directed Energy Counter-Unmanned Aircraft System (C-UAS)). Achieving silent watch and mobility, extending operational range, enabling dispersed operations, building resilient formations, and reducing the need for ancillary power generation.

Justification

Justification — Modification Of In Svc Equip

The FY2026 Joint Light Tactical Vehicle (JLTV) Mod-in-Service funding of $5.875 million supports safety and obsolescence retrofits for the JLTV A0/A1 vehicles in the field. The costs include: $5.119 million for Multiplexed Vehicle Electrical Center (mVEC) kits; and $756 thousand for obsolescence retrofits. The FY2026 Modification Hardware funding of $45.422 million supports safety and obsolescence retrofits for the JLTV A0/A1 vehicles in the field. The costs include: $19.104 million for Driver Side Display Unit (DSDU) upgrades; $10.493 million for Multiplexed Vehicle Electrical Center (mVEC) retrofits; $10.764 million for Shelter Emergency Egress Kits; $3.261 million for Starter Ground modifications; and $1.800 million for an Electronic Stability Control (ESC) modification. The FY 2026 Family of Heavy Tactical Vehicle (FHTV) Base procurement dollars in the amount of $47.431 million provides for 184 M1300 tractor modifications to pair with new production trailers.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$131.5M
Other Procurement, ArmyAFY25 Enacted$152.8M
Other Procurement, ArmyAFY26 Disc. Request$98.7M
Other Procurement, ArmyAFY26 Total$98.7M

Exhibit P-1R

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$60.5M
Other Procurement, ArmyAFY25 Enacted$68.6M
Other Procurement, ArmyAFY 2026 request$25.2M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$7.74B$131.5M$152.8M$98.7M$98.7M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Modification Of In Svc Equip. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.