ArmyProcurementReconciledBLI8827R80800
What it is
Mobile Soldier Power (8827R80800) is an Army procurement line funded in the Other Procurement, Army account.
What changed
-$4.20M FY25→26 P-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 1 linked award record is listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$13.3MP-1 TOA · PB2026
FY25 Enacted
$19.9MP-1 TOA · PB2026
FY26 Request
$15.7MP-1 TOA · PB2026
FY25→26 Change
-$4.20MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $13.3MFY25: $19.9MFY26: $15.7MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$13.3M
FY25$19.9M
FY26$15.7M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$17.8M$13.0M$13.3M
Enacted–$15.9M$16.0M$19.9M
Request––$16.0M$23.1M$15.7M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $16.0M for FY2024; the PB2026 book reported $13.3M as actual total obligation authority — $2.68M below the request. 13.3 − 16.0 = -2.7 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Mobile Soldier Power

The Mobile Soldier Power funding line procures power systems to enable dismounted Soldiers to execute their missions with fewer battery resupplies, thus reducing the logistical burden associated with moving fuel, generators and batteries. These capabilities combined allow the dismounted Soldier to operate independently for longer missions without being tethered to a large generator, vehicle, or supply train in austere operating environments. The funding line covers Integrated Soldier Power Data System - Core (ISPDS-C) and Universal Battery Charger (UBC). The Integrated Soldier Power and Data System-Core (ISPDS-C) funding line procures the power and data hub, Conformal Wearable Battery (CWB), and Squad Power Management (SPM) devices to fill the power and energy gaps of the Soldier. The use of mission essential Soldier portable power consuming systems is increasing across the battlefield. As the battlefield demand for electronic devices and situational awareness tools such as Nett Warrior, Integrated Visual Augmentation System (IVAS), and Soldier Borne Mission Command (SBMC); global positioning systems (GPS); weapon sensors; and radios increases, the requirement to provide expeditionary power is a critical enabler to mission accomplishment. This effort is consistent with the Small Unit Power Capability Development Document (CDD) (March 2022), Army Futures Command Power and Battery Modernization Framework, and DRAFT Army Operational Energy Strategy. The ISPDS-C funding line procures the full system requirement for the SPM including its initial spares and Soldier Worn Power Generation (Fuel Cells). Additionally, this project is responsible for provisioning the initial provisioning and spares of CWBs, C1F Cables, CWB Pouches, and the Power & Data Hub in alignment with Nett Warrior fieldings. The Universal Battery Charger (UBC) funding line fills the power and energy gap created by the increase in mission essential, Soldier portable power consumers, by providing charging and scavenging solutions capable of providing power to handheld communication devices and a suite of military batteries. The UBC charging solution is procured in two form factors suited for mounted and dismounted operations at the company level and below. The mounted UBC is integrated with combat vehicle platforms and the dismounted UBC and UBC-Lite (UBC-L) support the dismounted squad. The mounted UBC consists of an "A" and "B" kit both of which are procured through the UBC funding line. UBC is intended for use in the most austere operating environments. This effort is consistent with the Small Unit Power CDD (March 2022). The Small Unit Power (SUP) Platoon Power Generation (PPG) is a new start in FY2025. PPG will provide small units with sufficient portable power to sustain Modified Table of Organizational Equipment (MTOE) unit power demand in support of 48-to-72-hour missions. It will be used for charging batteries and powering various types of Army communications and electronics devices. In FY25-28, the Lightweight Tactical Power Source (LWTPS) Indefinite Delivery Indefinite Quantity (IDIQ) will provide a bridging solution until Low-Rate Initial Production quantities of the PPG has been established. AAOs UBC: 20,361 SPM (ISPDS-C): 1,604 Fuel Cell (ISPDS-C): 99,751 PPG: 5,581

Justification

Justification — Mobile Soldier Power

R07091: The Platoon Power Generator (PPG) program has no FY 2026 funding request. R08090: FY 2026 base procurement funding of $2.874 million procures and fields integrated Soldier power and data system - core, battery chargers, conformable wearable batteries, and associated equipment in support of the Soldier Lethality Cross Functional Team's (SL-CFT) Nett Warrior, Integrated Visual Augmentation System (IVAS), and the Network Cross Functional Team's (N-CFT's) Network Baseline 4.0 (NWB) fielding plans for Armored, Stryker, and Infantry Brigade Combat Teams (A/S/I BCTs), security force assistance brigades (SFABs), Ranger, Special Forces units and base requirements. R09103: FY 2026 base procurement funding of $12.855 million procures and fields Universal Battery Chargers. Soldiers face an ever-growing power demand that requires a comprehensive power generation, storage, and charging architecture. The gap between current power available and future power demand widens with the introduction of additional integrated digital electronic capabilities such as Nett Warrior (NW), Integrated Visual Augmentation System (IVAS), Soldier Borne Mission Command (SBMC), Leader Radios, Next Generation Squad Weapon (NGSW) and Assured Position Navigation and Timing (A-PNT). In accordance with section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110 - 181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$13.3M
Other Procurement, ArmyAFY25 Enacted$19.9M
Other Procurement, ArmyAFY26 Disc. Request$15.7M
Other Procurement, ArmyAFY26 Total$15.7M

Exhibit P-1R

AccountOrgTypeAmount
Other Procurement, ArmyAFY25 Enacted$3.14M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$131.7M$13.3M$19.9M$15.7M$15.7M

Follow the dollar

No follow-the-dollar view — none of this program's high-confidence awards records a positive obligation at any place of performance (flows cover 312 of 1,938 programs). why coverage is partial? →

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

RecipientPIIDConfidence
NOVATIO ENGINEERING, INC.W909MY22D0003high

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

2 mentions from the Senate LDA disclosure database.

HONEYWELL INTERNATIONALMobile|Power2024matched 2+ title words

Issues concerning Superfund site cleanups (no pending legislation) Issues concerning energy conservation, energy…

HONEYWELL INTERNATIONALMobile|Power2024matched 2+ title words

Issues concerning Superfund site cleanups (no pending legislation) Issues concerning energy conservation, energy…

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Mobile Soldier Power. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.