Mobile Soldier Power
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $13.3M |
| FY25 | $19.9M |
| FY26 | $15.7M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $17.8M | $13.0M | $13.3M | ||
| Enacted | – | $15.9M | $16.0M | $19.9M | |
| Request | – | – | $16.0M | $23.1M | $15.7M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $16.0M for FY2024; the PB2026 book reported $13.3M as actual total obligation authority — $2.68M below the request. 13.3 − 16.0 = -2.7 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Mobile Soldier Power
The Mobile Soldier Power funding line procures power systems to enable dismounted Soldiers to execute their missions with fewer battery resupplies, thus reducing the logistical burden associated with moving fuel, generators and batteries. These capabilities combined allow the dismounted Soldier to operate independently for longer missions without being tethered to a large generator, vehicle, or supply train in austere operating environments. The funding line covers Integrated Soldier Power Data System - Core (ISPDS-C) and Universal Battery Charger (UBC). The Integrated Soldier Power and Data System-Core (ISPDS-C) funding line procures the power and data hub, Conformal Wearable Battery (CWB), and Squad Power Management (SPM) devices to fill the power and energy gaps of the Soldier. The use of mission essential Soldier portable power consuming systems is increasing across the battlefield. As the battlefield demand for electronic devices and situational awareness tools such as Nett Warrior, Integrated Visual Augmentation System (IVAS), and Soldier Borne Mission Command (SBMC); global positioning systems (GPS); weapon sensors; and radios increases, the requirement to provide expeditionary power is a critical enabler to mission accomplishment. This effort is consistent with the Small Unit Power Capability Development Document (CDD) (March 2022), Army Futures Command Power and Battery Modernization Framework, and DRAFT Army Operational Energy Strategy. The ISPDS-C funding line procures the full system requirement for the SPM including its initial spares and Soldier Worn Power Generation (Fuel Cells). Additionally, this project is responsible for provisioning the initial provisioning and spares of CWBs, C1F Cables, CWB Pouches, and the Power & Data Hub in alignment with Nett Warrior fieldings. The Universal Battery Charger (UBC) funding line fills the power and energy gap created by the increase in mission essential, Soldier portable power consumers, by providing charging and scavenging solutions capable of providing power to handheld communication devices and a suite of military batteries. The UBC charging solution is procured in two form factors suited for mounted and dismounted operations at the company level and below. The mounted UBC is integrated with combat vehicle platforms and the dismounted UBC and UBC-Lite (UBC-L) support the dismounted squad. The mounted UBC consists of an "A" and "B" kit both of which are procured through the UBC funding line. UBC is intended for use in the most austere operating environments. This effort is consistent with the Small Unit Power CDD (March 2022). The Small Unit Power (SUP) Platoon Power Generation (PPG) is a new start in FY2025. PPG will provide small units with sufficient portable power to sustain Modified Table of Organizational Equipment (MTOE) unit power demand in support of 48-to-72-hour missions. It will be used for charging batteries and powering various types of Army communications and electronics devices. In FY25-28, the Lightweight Tactical Power Source (LWTPS) Indefinite Delivery Indefinite Quantity (IDIQ) will provide a bridging solution until Low-Rate Initial Production quantities of the PPG has been established. AAOs UBC: 20,361 SPM (ISPDS-C): 1,604 Fuel Cell (ISPDS-C): 99,751 PPG: 5,581
Justification
Justification — Mobile Soldier Power
R07091: The Platoon Power Generator (PPG) program has no FY 2026 funding request. R08090: FY 2026 base procurement funding of $2.874 million procures and fields integrated Soldier power and data system - core, battery chargers, conformable wearable batteries, and associated equipment in support of the Soldier Lethality Cross Functional Team's (SL-CFT) Nett Warrior, Integrated Visual Augmentation System (IVAS), and the Network Cross Functional Team's (N-CFT's) Network Baseline 4.0 (NWB) fielding plans for Armored, Stryker, and Infantry Brigade Combat Teams (A/S/I BCTs), security force assistance brigades (SFABs), Ranger, Special Forces units and base requirements. R09103: FY 2026 base procurement funding of $12.855 million procures and fields Universal Battery Chargers. Soldiers face an ever-growing power demand that requires a comprehensive power generation, storage, and charging architecture. The gap between current power available and future power demand widens with the introduction of additional integrated digital electronic capabilities such as Nett Warrior (NW), Integrated Visual Augmentation System (IVAS), Soldier Borne Mission Command (SBMC), Leader Radios, Next Generation Squad Weapon (NGSW) and Assured Position Navigation and Timing (A-PNT). In accordance with section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110 - 181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Army | A | FY24 Actuals | $13.3M |
| Other Procurement, Army | A | FY25 Enacted | $19.9M |
| Other Procurement, Army | A | FY26 Disc. Request | $15.7M |
| Other Procurement, Army | A | FY26 Total | $15.7M |
Exhibit P-1R
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Army | A | FY25 Enacted | $3.14M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $131.7M | $13.3M | $19.9M | $15.7M | $15.7M |
Follow the dollar
No follow-the-dollar view — none of this program's high-confidence awards records a positive obligation at any place of performance (flows cover 312 of 1,938 programs). why coverage is partial? →
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
| Recipient | PIID | Confidence |
|---|---|---|
| NOVATIO ENGINEERING, INC. | W909MY22D0003 | high |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
2 mentions from the Senate LDA disclosure database.
Issues concerning Superfund site cleanups (no pending legislation) Issues concerning energy conservation, energy…
Issues concerning Superfund site cleanups (no pending legislation) Issues concerning energy conservation, energy…
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Mobile Soldier Power. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O265
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O271
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O273
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
FY2026 Department of Defense Budget: Procurement Programs (P-1R) · comptroller.war.gov
Exhibit P-1R · P137,P138
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1R_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
Other Procurement - BA 3, 4 & 6 - Other Support Equipment, Initial Spares and Agile Portfolio Management · www.asafm.army.mil
PDF page 137