PRECISION STRIKE MISSILE (PRSM)

ArmyProcurementReconciledBLI8540C29600
Watch this program

Published budget signals for this program, with links to receipts.

Updates appear after a data refresh and publication. No fixed update schedule is available.

Paste the RSS address into a feed reader. No Fiscal Receipts account is required.

RSSAtom

What it is
PRECISION STRIKE MISSILE (PRSM) (8540C29600) is an Army procurement line funded in the Missile Procurement, Army account.
What changed
-$93.8M FY25→26 P-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 3 linked award records are listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$1.05BP-1 TOA · PB2026
FY25 Enacted
$457.5MP-1 TOA · PB2026
FY26 Request
$363.7MP-1 TOA · PB2026
55.8% reconciliation

$160.8M discretionary + $202.8M one-time reconciliation. Discretionary change vs FY2025 enacted: -64.8%.

FY25→26 Change
-$93.8MP-1 TOA · PB2026

Two official figures, one label— reconciled below

Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows that the R-2/P-40 J-book program line excludes — advance procurement in an ordinary year, and in FY2026 the one-time reconciliation appropriation as well. Each row below names the one it is. How the two bases relate →

FY26 Request · $363.7M TOA − $160.8M J-book line = 202.8M (363.662 − 160.846 = 202.816) — $202.8M of one-time FY2026 reconciliation money accounts for this gap — not advance procurement

Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.

Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $1.05BFY25: $457.5MFY26: $363.7MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$1.05B
FY25$457.5M
FY26$363.7M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$166.1M$162.9M$1.05B
Enacted–$162.9M$384.1M$457.5M
Request––$384.1M$492.6M$363.7M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $384.1M for FY2024; the PB2026 book reported $1.05B as actual total obligation authority — $664.4M above the request. 1,048.5 − 384.1 = 664.4 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — PRECISION STRIKE MISSILE (PRSM)

NOTE: FY 2024 includes $334.759 million base funding and $713.732 million emergency supplemental funding for a total of $1,048.491 million to support the procurement of missiles. The Precision Strike Missile (PrSM) Increment 1 P-40 quantities are suppressed. FY 2024 P-40 quantities are suppressed to avoid the disclosure of sensitive information. PrSM funding line is directly aligned to the Army Long Range Precision Fires (LRPF) modernization priority. PrSM is part of the Army Transformation Initiative. PrSM is the Army's next generation surface-to-surface missile that replaces and improves upon Army Tactical Missile System (ATACMS) capabilities. PrSM requirements include: a threshold max range of 400km, specified lethality against the designated target set, a launch pod missile container (LPMC) that holds two missiles, survivability in a threat environment, and compatibility with the existing launcher platforms (M270A2 Multiple Launch Rocket System (MLRS) and M142 High Mobility Artillery Rocket System (HIMARS)). PrSM will meet cluster and insensitive munition (IM) requirements and is being designed with an open system approach that provides the capability for future growth to counter new and emerging threats. The mission of PrSM Increment 1 is to attack, neutralize, suppress, and destroy targets using missile delivered indirect precision fires. PrSM will provide joint force commanders with a 24/7, all-weather capability to attack critical and time sensitive area and point targets including threat air defense, missile launchers, command and control centers, assembly and staging areas, and high payoff targets at all depths of the multi-domain battlefield. PrSM will counter the enemy's ability to conduct combat maneuver and air defense operations. The mission of PrSM Increment 2 integrates a seeker to attack critical time sensitive moving maritime or relocatable land targets. PrSM Increment 2 procurement begins in FY 2026 and is accounted for in the total quantities above.

Justification

Justification — PRECISION STRIKE MISSILE (PRSM)

FY 2026 Base procurement dollars in the amount of $160.846 million supports the production of 45 PrSM missiles with launch pod missile containers (LPMCs). The 45 PrSM missiles includes 35 Increment 1 missiles and 10 Increment 2 missiles. The FY 2026 request for PrSM Increment 1 includes $65,582 thousand of discretionary and $202,816 thousand of mandatory (reconciliation) for a total of $268,398 thousand. The mandatory funds procure an additional 107 PrSM Increment 1 missiles. Further information for this reconciliation request is provided in Section 20004 (Munitions & Supply Chain) of the Reconciliation Exhibit. Funding decrease from FY 2025 to FY 2026 results in a reduction of procurement quantities from 250 to 152. The current Army acquisition objective (AAO) is 3,986 missiles for PrSM Increment 1 and 1,589 missiles for PrSM Increment 2. FY 2024 quantities are suppressed to avoid the disclosure of sensitive information. PrSM will close the capability gap between the Army Tactical Missile System (ATACMS) and near-peer missile capabilities. On 3 February 2021 Army Futures Command, Commanding General signed a directed requirement for initial quantities of PrSM EOC, and on 4 June 2021, the Joint Requirements Oversight Council (JROC) validated the PrSM capability development document (CDD). In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. PrSM funding line is directly aligned to the Army Long Range Precision Fires (LRPF) modernization priority. PrSM is part of the Army Transformation Initiative. The Army intends to convert any price advantage created through contract negotiations, other service procurement, and international cooperative partnerships to procure additional PrSM missiles.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Missile Procurement, ArmyAFY24 Actuals$1.05B
Missile Procurement, ArmyAFY25 Enacted$457.5M
Missile Procurement, ArmyAFY26 Disc. Request$160.8M
Missile Procurement, ArmyAFY26 Reconciliation$202.8M
Missile Procurement, ArmyAFY26 Total$363.7M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$388.9M$1.05B$457.5M$160.8M$160.8M

Follow the dollar

Appropriation → program element → top high-confidence awards → recipient families → congressional districts.

Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →

The program's money traced left to right: the A appropriation, program element 8540C29600 (PRECISION STRIKE MISSILE (PRSM)), its 1 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.
The program's money traced left to right: the A appropriation, program element 8540C29600 (PRECISION STRIKE MISSILE (PRSM)), its 1 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.APPROPRIATIONPROGRAM ELEMENTTOP AWARDSRECIPIENT FAMILIESDISTRICTSAProcurement appropriation8540C29600363.7M FY26W31P4Q23C0052LOCKHEED MARTIN CORPORATION596.0MLockheed Martin CorpTX-33

The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.

The diagram as text: one row per congressional district in the diagram, the recipient families shown there, and that district's cited program obligations.
DistrictProgram obligations
TX-33$579.5M

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.

RecipientPIIDConfidence
LOCKHEED MARTIN CORPORATIONW31P4Q23C0052high
LOCKHEED MARTIN CORPORATIONW31P4Q21C0042medium
LOCKHEED MARTIN CORPORATIONW31P4Q25F0082medium

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

8 mentions from the Senate LDA disclosure database.

BAE SYSTEMS INCPRECISION|MISSILE2026matched 2+ title words

National Defense Authorization Act, 2027 (HR 8800/S 4784); provisions regarding R&D - Navy, US Marine Corps, Air…

BAE SYSTEMS INCPRECISION|MISSILE2026matched 2+ title words

National Defense Authorization Act, 2027 (HR XXXX/S XXXX); provisions regarding R&D - Navy, US Marine Corps, Air…

BAE SYSTEMS INCPRECISION|MISSILE2025matched 2+ title words

National Defense Authorization Act for Fiscal Year 2026 (PL 119-60); provisions regarding R&D - Navy, Air Force, Space…

LOCKHEED MARTIN CORPORATIONPRECISION|MISSILE2025matched 2+ title words

S 2296/HR 3838 - Streamlining Procurement for Effective Execution and Delivery and National Defense Authorization Act…

BAE SYSTEMS INCPRECISION|MISSILE2024matched 2+ title words

Department of Defense Appropriations Act of 2024 (HR 4365/S 2587; PL 118-47) and Further Consolidated Appropriations…

BAE SYSTEMS INCPRECISION|MISSILE2024matched 2+ title words

Department of Defense Appropriations Act of 2025 (HR 8774/S XXXX); provisions regarding R&D-Army, Navy/USMC, Air…

LOCKHEED MARTIN CORPORATIONPRECISION|MISSILE2024matched 2+ title words

S 2587/HR 4365 - Department of Defense Appropriations Act, 2024, Titles III and IV, including issues related to…

LOCKHEED MARTIN CORPORATIONPRECISION|MISSILE2024matched 2+ title words

S 4921/HR 8774 - Department of Defense Appropriations Act, 2025 including issues related to military aviation…

Oversight

GAO oversight of this program

GAO assessed Precision Strike Missile (PrSM) in its June 2025 Weapon Systems Annual Assessment, as an Army MDAP program.

“The Army's PrSM is a surface-to-surface ballistic missile designed to attack point and area targets at distances ranging from 70 to over 400 kilometers. Each PrSM container will hold two missiles, twice the current missile container's capacity, and will remain compatible with existing rocket launcher systems. The Army is developing PrSM across four increments. The first increment will replace the Army Tactical Missile System and aims to achieve initial operational capability in fiscal year 2026. Subsequent increments will provide seeker capability, extend missile range, and add more lethal payloads. PrSM is designed to comply with statutory requirements for insensitive munitions to reduce vulnerability to accidental stimuli, as well as DOD's policy on cluster munitions to minimize unintended harm from unexploded ordinance. We assessed the first two of the expected increments.”

GAO-25-107569, p. 111 — the assessment page in GAO’s 2025 report

Earlier editions of the same assessment: June 2023

GAO assessed Precision Strike Missile (PrSM) in its June 2023 Weapon Systems Annual Assessment, as an Army MDAP program.

“The Army's PrSM is a ballistic missile designed to attack area and point targets at distances ranging from 70 kilometers to more than 400 kilometers. Each PrSM missile container will hold two missiles, double the current missile container's capacity. The Army designed PrSM as one of a family of munitions for compatibility with existing rocket launcher systems and to comply with statutory requirements for insensitive munitions and DOD policy on cluster munitions.”

GAO-23-106059, p. 115 — the assessment page in GAO’s 2023 report

GAO assessed the program, not this budget line. PRECISION STRIKE MISSILE (PRSM) is one of the lines that funds it, and GAO’s work above says nothing about this line’s own figures. Which line each GAO item attaches to is a hand-ratified crosswalk — how it was checked.

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not PRECISION STRIKE MISSILE (PRSM). GAO's program-level work on this line is above. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.