What it is
DARP RC135 — a procurement program run by Air Force.
What changed
No FY25→26 comparison — trajectory data incomplete for this line.
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$28.9M
FY25 Total
FY26 Request
$30.1M
FY25→26 Change

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
FY24: $28.9MFY26: $30.1MFY24FY26
FY24
$28.9M
FY26
$30.1M
Decade view — each figure cites its own President's Budget edition
FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY22FY23FY24FY25FY26
Actuals$27.4M$28.2M$28.9M
Enacted$28.2M$28.9M$29.5M
Request$28.9M$29.5M$30.1M

blank = series not published for this year; – = absent from that edition.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description DARP RC135

RC-135 procurement is executed by the Big Safari RC-135 Program Manager and is supported by various contractors. The contractors provide services including Program Depot Maintenance (PDM), prime mission equipment overhaul, special repair activity, in-plant support (sustainment engineering, software engineering, and program management), configuration management, Line Replaceble Unit (LRU) repair, and field service maintenance and training for special operational missions. The RC-135 Program Manager provides the full-range of weapons system management, acquisition oversight, program security and integrated logistics for the RC-135 aircraft, power plant, sensors and associated support and equipment. Due to the rapidly changing global threat environment, the Program Manager has the authority to redirect funding as necessary to meet current stated and emerging Combatant Commander and Intelligence Community (IC) requirements. Funding for this exhibit contained in PE 0305207F.

Justification

Justification DARP RC135

FY26 procurement funding acquires and installs various upgrade and enhancement modifications for ground support equipment associated with the RC-135 program. This ground support equipment is directly tied to fielded baselines of the RC-135 V/W RIVET JOINT, RC-135S COBRA BALL, and the RC-135U COMBAT SENT. The requirement to maintain commonality with fielded baselines necessitates the continuous modification and installation of upgrades concurrent with RC-135 aircraft entering operational status. These ground systems are critical to the post-mission processing of highly perishable intelligence information, and supporting aircrew proficiency training, virtual simulation exercises that contribute to distributed mission training initiatives, and provide support to indigenous maintenance during aircraft deployments to "bare-base locations. Additionally, all applicable ground support equipment is required to comply with NSA intelligence data recording formats and requirements due to the nature and sensitivity of the information. Ground support equipment includes, but is not limited to: RIVET JOINT Mission Trainer (RJMT), Ground Data Processing System (GDPS), Mission Crew Training System (MCTS), Modular Processing System (MPS), and the Airborne Capability Extension System (ACES).

Budget Line Items(workbook-cited)

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, Air ForceFFY24 Actuals$28.9M
Other Procurement, Air ForceFFY25 Enacted$29.5M
Other Procurement, Air ForceFFY26 Disc. Request$30.1M
Other Procurement, Air ForceFFY26 Total$30.1M

Budget Details(R-2/P-40 facts)

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$236.7M$28.9M$29.5M$30.1M$30.1M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →