Printed from https://fiscalreceipts.com/program/845100/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Engineering and EOD Equipment
Watch this program
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $307.4M |
| FY25 | $203.5M |
| FY26 | $253.8M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $25.7M | $193.8M | $307.4M | ||
| Enacted | – | $191.6M | $280.7M | $203.5M | |
| Request | – | – | $280.7M | $203.5M | $253.8M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $280.7M for FY2024; the PB2026 book reported $307.4M as actual total obligation authority — $26.6M above the request. 307.35 − 280.73 = 26.62 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Engineering and EOD Equipment
This budget line funds the procurement of a multitude of Explosive Ordnance Disposal (EOD) and Engineering capabilities critical to the Air Force's ability to provide Integrated Base Response and Recovery (IBRR) and Air Base Resiliency in highly contested environments, both in-garrison and in support of contingency operations. IBRR is defined as the whole of installation effort to restore operational and support mission capabilities after a damaging wartime or peacetime event. Damaging wartime or peacetime events range from natural and man-made disasters to Chemical, Biological, Radiological, and Nuclear (CBRN), kinetic, and cyber attacks. Air Base Resiliency refers to the capability of operating locations to sustain the projection of combat power by protecting against, responding to, and reconstituting from deliberate, accidental, or naturally occurring events such as those previously listed. Procurements include the EOD identify, mitigate, and defeat Family of Systems (FoS), Chemical, Biological, Radiological, and Nuclear (CBRN) detection and identification systems, hardening, a portion of the Rapid Airfield Damage Recovery (RADR) FoS, and tactical communications packages for the Air Force Civil Engineer enterprise. EOD FoS includes systems and equipment needed for EOD personnel to operate in the full spectrum of the competition continuum by identifying, mitigating, and defeating explosive hazards from Unexploded Ordnance (UXO), Improvised Explosive Devices (IEDs), aerospace systems, conventional munitions, and Weapons of Mass Destruction (WMD). CBRN detection and identification systems include the Radiological Detection System (RDS), and Radioisotope Identification Device (RIID). These systems provide the capability to measure, identify, geo-locate, and transmit data on radiological and nuclear materials. Additionally, this budget line includes the Dismounted Reconnaissance Set, Kits, and Outfits (DR SKO) that provides on-site identification and personal protection from chemical and biological contamination. Hardening refers to the ability to protect critical assets from enemy attack. Within hardening, this budget line specifically funds the Expedient Small Asset Protection (ESAP) hardened shelter system. The ESAP system provides protection from specific munitions and is designed to house fighter aircraft and critical sortie generation equipment. The RADR FoS consists of capabilities that contribute to three distinct phases of airfield recovery; Rapid Damage Assessment (RDA), Rapid Explosive Hazard Mitigation (REHM), and Rapid Damage Repair (RDR). Within RDA, this budget line specifically funds the Rapid Airfield Damage Assessment System (RADAS), which consists of four Small Unmanned Aerial Systems (SuAS) equipped with Electro-optical (EO) and Long Wave Infrared (LWIR) sensors, switch and network cabling, and two mobile workstations. Within REHM, this budget line specifically funds the Recovery of Airfield Denied By Ordnance (RADBO), which consists of the Mine Resistant Ambush Protected (MRAP) vehicle, the interrogation arm assembly and the Zeus IIA Directed Energy Weapon (DEW) system. The MRAP vehicles are not procured under this budget line. Within RDR, this budget line specifically funds Aluminum Mat-2 (AM-2) matting kits, Fiber Reinforced Polymer (FRP) matting kits, and Water and Fuels Expedient Repair System (WaFERS) kits. AM-2 matting kits may be used as a capping material for repairs or as an expedient expansion method on airfield aprons and low-speed taxiways. FRP matting kits may be used as a capping material for repairs may be used in a variety of airfield locations depending on aircraft type, and operations. WaFERS kits may be used as an expedient repair or recovery of mission essential water and fuel distribution systems and associated infrastructure. Tactical communication packages include a variety of systems, equipment, and accessories to provide Command, Control, and Communication (C3) for the Civil Engineer enterprise. The FY 2025 funding request was reduced by $27.521 million to account for the availability of prior year execution balances. Funding for this exhibit contained in PEs: 0204424F, 0208028F, 0207593F.
Justification
Justification — Engineering and EOD Equipment
This budge line has significant increases due to the role of IBRR and Air Base Resiliency in operationalizing the Agile Combat Employment (ACE) concept in the Indo-Pacific. ACE is a proactive and reactive scheme of maneuver that shifts generation of airpower from large, fixed centralized bases, to networks of smaller dispersed bases. The capabilities provided within this budget line are part of the DAF's cost-effective mix of targeted investments designed to enable the distributed resilient basing needed to deter our adversaries and prevail in combat. Updates have been made to the planned procurements, especially within EOD, to endeavor to align resources with the latest strategic guidance aimed to deter or be prepared to defeat the pacing threats before critical time horizons. FY26 Funding of 2.00M in PEC 0204424F will procure EOD Unmanned Systems (Small) in the following quantities: 40 systems. FY26 Funding of 3.600M in PEC 0204424F will procure EOD Ordinance Locator Systems in the following quantities: 120 devices. FY26 Funding of 2.000M in PEC 0204424F will procure EOD Remote Fire Systems in the following quantities: 1000 devices. FY26 Funding of 7.200M in PEC 0208028F will procure RADAS in the following quantities: 9 systems. FY26 Funding of 50.825M in PEC 0208028F will procure Fiber Reinforced Polymer (FRP) kits in the following quantities: 75 kits. FY26 Funding of 4.587M in PEC 0207593F and 0208036F will procure CBRN Radiological Detection Family of Systems in the following quantities: 417 systems. FY26 Funding of 5.000M in PEC 0208028F will procure Tactical Communication Packages in the following quantities: 100 packages. FY26 Funding of 105.186M in PEC 0208028F will procure Expedient Small Asset Protection (ESAP) Shelters in the following quantities: 17 shelters. FY26 Funding of 1.220M in PEC 0208028F will procure Combat Support Training Range Package in the following quantities: 1. FY26 Funding of 9.200M in PEC 0208028F will procure Expeditionary Airfield Lighting Systems (EAL-C) in the following quantities: 4 sets. FY26 Funding of 6.603M in PEC 0208028F will procure Water and Fuels Expedient Repair System (WaFERS) kits in the following quantities: 3 kits FY26 Funding of 5.100M in PEC 0204424F will procure EOD Adaptive Basing Kits in the following quantities: 6 kits FY26 Funding of 39.600M in PEC 0208028F will procure RADR Aluminum Matting kits in the following quantities: 18 kits. FY26 Funding of 7.553M in PEC 0204424F will procure Night Vision Devices in the following quantities: 581 devices. FY26 Funding of 4.125M in PEC 0204424F will procure EOD C4I systems in the following quantities: 375 systems.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Air Force | F | FY24 Actuals | $307.4M |
| Other Procurement, Air Force | F | FY25 Enacted | $203.5M |
| Other Procurement, Air Force | F | FY26 Disc. Request | $253.8M |
| Other Procurement, Air Force | F | FY26 Total | $253.8M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|
| Program Element | $307.4M | $203.5M | $253.8M | $253.8M |
Follow the dollar
Appropriation → program element → top high-confidence awards → recipient families → congressional districts.
Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →
The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.
| District | Program obligations |
|---|---|
| AL-05 | $106.7M |
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
| Recipient | PIID | Confidence |
|---|---|---|
| PARSONS GOVERNMENT SERVICES INC | FA853420C0001 | high |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Engineering and EOD Equipment. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O1086
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O1053
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O1104
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
FY2026 Air Force Other Procurement · www.saffm.hq.af.mil
PDF page 741