Skip to content
Fiscal Receipts

POWER CONDITIONING EQUIPMENT

FProcurementFully Reconciled843040
What it is
POWER CONDITIONING EQUIPMENT — a procurement program run by Air Force.
What changed
No FY25→26 comparison — trajectory data incomplete for this line.
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$9.23M
FY25 Total
FY26 Request
$13.7M
FY25→26 Change

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
FY24: $9.23MFY26: $13.7MFY24FY26
FY24
$9.23M
FY26
$13.7M
Decade view — each figure cites its own President's Budget edition
FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY22FY23FY24FY25FY26
Actuals$10.5M$12.2M$9.23M
Enacted$12.2M$9.23M$13.4M
Request$9.23M$13.4M$13.7M

blank = series not published for this year; – = absent from that edition.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description POWER CONDITIONING EQUIPMENT

Mission Description: The Power Conditioning and Continuation Interfacing Equipment (PCCIE) program is critical to ensuring the quality, reliability, and continuity of electrical power supplied to essential Air Force systems. This program designs, develops, tests, and fields power conditioning and uninterruptible power supply (UPS) equipment necessary to support mission-critical assets such as communication systems, radar, data centers, hospitals, industrial processes, and command and control systems. The program replaces aging and legacy UPS units, ensuring operational resilience against electrical disturbances, outages, and environmental factors that compromise power integrity. As a multi-year effort, the PCCIE program addresses emergent requirements and supports ongoing modernization to meet growing demand and address legacy system obsolescence. Key Objectives: 1. Power Quality Improvement: Reduces harmonic distortion, voltage fluctuations, and electrical disturbances. 2. Operational Continuity: Provides uninterrupted power during outages or disturbances. 3. Efficiency and Reliability: Optimizes power efficiency, minimizes energy losses, and extends mean time between failures (MTBF). 4. UPS Modernization: Supports the transition to next-generation UPS systems, reducing maintenance costs and increasing system uptime. Program Components: • Power Conditioning Equipment: Procurement of voltage regulators, harmonic filters, and power factor correction devices. • Continuation Interfacing Equipment: UPS systems, transfer switches, and backup power systems. • Fielding and Installation: Deploys and installs UPS systems across Air Force bases, with flexibility for tailored installations to meet mission-specific needs. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. • Program elements associated with this are: 27510F, 52834F, and 52844F. • Funding for this exhibit contained in PE 0207510F

Justification

Justification POWER CONDITIONING EQUIPMENT

Justification: The Power Conditioning and Continuation Interfacing Equipment (PCCIE) program addresses critical Air Force infrastructure needs by ensuring the quality and continuity of electrical power supplied to essential systems. The program mitigates risks associated with aging and obsolete Uninterruptible Power Supply (UPS) units that support mission-critical facilities, such as data centers, command and control systems, radar, and medical infrastructure. The PCCIE program prioritizes the replacement of aging UPS systems, focusing on units that have exceeded their operational lifespan of 12-15 years. The program ensures uninterrupted operations, reducing downtime caused by electrical disturbances and outages. Cost Justification: 1. Aging Equipment: Over 70% of UPS units in the Air Force inventory exceed 15 years of service, leading to increased failures and reduced reliability. The funding will enable the replacement of systems nearing or beyond their lifespan. 2. Operational Continuity: Failure of UPS systems can lead to mission-critical downtime. This procurement ensures operational readiness by providing uninterrupted power to essential facilities. 3. Cost Savings: Modern UPS systems offer improved energy efficiency and reduced maintenance costs, providing a 30-50% reduction in lifecycle sustainment expenses. 4. Scalability and Flexibility: Procurement addresses immediate replacement needs while supporting future expansion and upgrades aligned with mission growth.

Budget Line Items(workbook-cited)

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, Air ForceFFY24 Actuals$9.23M
Other Procurement, Air ForceFFY25 Enacted$13.4M
Other Procurement, Air ForceFFY26 Disc. Request$13.7M
Other Procurement, Air ForceFFY26 Total$13.7M

Exhibit P-1R

AccountOrgTypeAmount
Other Procurement, Air ForceFFY24 Actuals$1.10M
Other Procurement, Air ForceFFY25 Enacted$1.08M
Other Procurement, Air ForceFFY 2026 request$1.11M

Budget Details(R-2/P-40 facts)

ProjectFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$9.23M$13.4M$13.7M$13.7M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →