Wide Area Surveillance (WAS)
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $13.9M |
| FY25 | $13.9M |
| FY26 | $29.6M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $34.9M | $33.2M | $13.9M | ||
| Enacted | – | $29.1M | $11.6M | $13.9M | |
| Request | – | – | $11.6M | $13.9M | $29.6M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $11.6M for FY2024; the PB2026 book reported $13.9M as actual total obligation authority — $2.29M above the request. 13.9 − 11.6 = 2.3 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Wide Area Surveillance (WAS)
The Wide Area Surveillance (WAS) program provides homeland defense sensors to North American Aerospace Defense Command/US Northern Command (NORAD/USNORTHCOM) for the National Capital Region (NCR). WAS consists of two advanced sensor systems, the Stateside Affordable Radar System (STARS) and Scorpion. Based upon existing technological capabilities, WAS detects/tracks low, slow and other asymmetrical threats in the airspace and meets the user needs of sensing stressing airborne targets in complex environments with affordable sensors. The sensor outputs are incorporated into the Battle Control Systems-Fixed (BCS-F) air picture and utilized as the NORAD/USNORTHCOM Command and Control (C2) air surveillance system of record. The WAS strategy is an acquisition approach for full capability to produce and field highly capable and sustainable advanced sensors in the NCR. In FY26, the Air Force plans to award WAS Production Contract efforts for both STARS and the Scorpion systems, as well as perform a technical refresh of fielded sites. In FY26, the Air Force continues to procure replenishment spares and repair parts. The FY 2026 request was reduced by $0.109 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative Some aspects of the WAS program are classified and information will be provided on a need-to-know basis. Funding for this exhibit is contained in PE 0604445F, Wide Area Surveillance.
Justification
Justification — Wide Area Surveillance (WAS)
The program increase in FY26 allows for the procurement of technology refresh assets to replace sensor systems with end of life components to maintain critical surveillance in support of homeland defense mission in the National Capitol Region. FY26 activities will include but are not limited to the following: Fielding operational sensors; addressing emerging sensor capabilities; updating system infrastructure such as a system integrated lab and system health and monitoring centralized data processing capability to support operations for NORAD/NORTHCOM; supporting technical refresh of fielded sites; upgrading hardware and software to seamlessly integrate new and emerging sensors, data, and technologies; procuring end items and spares that do not qualify for Centralized Asset Management (CAM) funding; funding program and direct mission support providing management, engineering, cost and technical support for the program office; supporting potential diminishing manufacturing sources, material shortages, obsolescence solutions, sparing, and recapitalization; and procuring key components of each site that require significant lead time items.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Air Force | F | FY24 Actuals | $13.9M |
| Other Procurement, Air Force | F | FY25 Enacted | $13.9M |
| Other Procurement, Air Force | F | FY26 Disc. Request | $29.6M |
| Other Procurement, Air Force | F | FY26 Total | $29.6M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $46.6M | $13.9M | $13.9M | $29.6M | $29.6M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Wide Area Surveillance (WAS). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O1066
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O1030
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O1083
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
FY2026 Air Force Other Procurement · www.saffm.hq.af.mil
PDF page 453